Investing№ 82Nasdaq: RIOT

Riot Platforms

Riot Platforms mines bitcoin and now leases AI data-centre space; it signed a $9.1B, 191 MW lease in August, but turned $675M of revenue into a $716M owner cash outflow over the past year.

Updated Fiscal year is the calendar year41 min readPedrum Shokouhi

Can be disrupted

Research, not investment advice. Figures as of .

Key numbers

  • Revenue$675M (calculated)TTM Jun 2026; $0.3M in 2017 [2][3][4]
  • Owner cash flow−$716M (calculated)TTM Jun 2026, after stock pay and building; net loss $1.32B [2][3]
  • Signed leases241 MW (reported)AMD 50 MW and an unnamed AI lab 191 MW; $9.8B of base rent over the first terms [5][6]
  • Bridge loanUp to $573M (reported)Morgan Stanley delayed-draw loan, matures 31 Dec 2026 per the 8-K; no recourse to the parent [7]
  • Bitcoin held11,380 (reported)At 30 June 2026; about $878M at the 30 Oct close [2][8]
  • Shares375M (reported)7 Aug 2026; 25M at the end of 2019 [2][4]

The answer

  1. Riot Platforms began as a bitcoin miner and is now a landlord for AI computing: in August it signed a 20-year lease for 191 MW of data-centre space worth about $9.1B, with a tenant it has not named, yet over the twelve months to June 2026 it turned $675M of revenue into a net loss of $1.32B and an owner cash outflow of $716M (calculated).325
  2. I value it at $3.34 a share, in a range of $0.06 to $13.73, because the two signed leases are worth about $1.4B to me after the $2.3B still to be built, and the company’s overhead and stock pay, about $310M a year now, take most of it back (estimate).26
  3. At $12.81 the price is 284% above my base value and 7% below my bull; to reach it at my base economics Riot would have to sign about 1.8 GW of new leases on top of the 241 MW it has, most of the power it owns, and my margin-of-safety price is $0.08 (estimate).16

Six questions, one line each

Why
AI companies need powered buildings faster than anyone can connect them to the grid, and Riot already holds approved connections at two Texas sites; it has signed 241 MW of leases in under seven months, $9.8B of contract revenue in all.56 →
The moat
Mining has none; the thing that is hard to copy is a grid connection already approved for about 1.7 GW in Texas, and even that matters less as the grid catches up.62 →
The advantage
It builds fast and builds for less than most: the AMD space cost $3.6M a MW against $11M to $12M for new halls, and Riot makes its own switchgear.96 →
Management
Jason Les, 40, is chief executive and Benjamin Yi, 44, executive chairman; each was awarded $83.5M in 2024, shareholders gave pay 31.5% support in 2025, and the share count has gone from 25M to 375M since 2019.101142 →
Margin of safety
Below $0.08, where my $0.06 bear value is three quarters of the price; the shares have not closed below $0.65 in ten years, so it is a statement about how wide my range is, not a price to wait for (estimate).1 →
The price
$12.81 at the close in Q4 2026, 55% below the June high, 284% above my base value and 6.3 times the past year’s revenue on enterprise value (calculated).12 →

The business

Riot Platforms owns large, grid-connected sites in Texas and Kentucky and earns money three ways: it mines bitcoin, it is starting to lease data-centre space, and it builds electrical equipment. The company calls itself a digital infrastructure company, and the facts back that up better than the old label does.2 Headquarters are in Castle Rock, Colorado. The year is the calendar year.

The sites are the business. Rockdale, in Milam County, Texas, has about 700 MW of developed capacity. Corsicana, near Dallas, has about 400 MW built and room for about 1 GW at full build-out. Kentucky has about 192 MW.2 The company says it has about 1,700 MW of approved power in Texas and 300 MW in Kentucky.6

The company was AspenBio Pharma until 2012, then Venaxis, then Bioptix, and took the name Riot Blockchain in October 2017.12 It bought Whinstone, which owned the Rockdale site, in 2021 for 11.8 million shares and $40.9M in cash, net of cash acquired, and the engineering firm ESS Metron the same year.13 Corsicana started mining in April 2024. It bought a Kentucky miner, Block Mining, in July 2024, and an electrical engineering firm, E4A, in December 2024.32 Jason Les became chief executive in February 2021.10

Bitcoin mining

Mining is still most of the revenue. Riot had 44.4 exahash a second of machines deployed at 30 June 2026, up 15% since December, and mined 3,060 bitcoin in the first half for $225.6M of revenue.2 Its edge is the cost of power. The all-in price it paid was 3.6 cents a kilowatt-hour in the second quarter, helped by credits for turning machines off when the grid is stressed.26 Its cost to mine one bitcoin, before depreciation, was $49,912 in the quarter.2 Counting the machines’ depreciation, it was $90,631, against $71,667 of bitcoin produced.2 That is the central fact about the mining business today: it covers its power bill and not the cost of the machines.

Bitcoin mined each quarter

Bitcoin produced in the quarter

  • Q2 2026 1,587 BTC
Bitcoin mined each quarterBitcoin mined by Riot, by quarter: 1,426 in the second quarter of 2025, 1,587 in the second quarter of 2026. Deployed hash rate rose from 35.4 to 44.4 exahash a second over the same period.05001,0001,5002,000Q2 ’25Q3 ’25Q4 ’25Q1 ’26Q2 ’26Bitcoin mined, Q2 ’25: 1,426 BTCBitcoin mined, Q3 ’25: 1,406 BTCBitcoin mined, Q4 ’25: 1,324 BTCBitcoin mined, Q1 ’26: 1,473 BTCBitcoin mined, Q2 ’26: 1,587 BTCBitcoin mined each quarterBitcoin mined by Riot, by quarter: 1,426 in the second quarter of 2025, 1,587 in the second quarter of 2026. Deployed hash rate rose from 35.4 to 44.4 exahash a second over the same period.05001,0001,5002,000Q2 ’25Q3 ’25Q4 ’25Q1 ’26Q2 ’26Bitcoin mined, Q2 ’25: 1,426 BTCBitcoin mined, Q3 ’25: 1,406 BTCBitcoin mined, Q4 ’25: 1,324 BTCBitcoin mined, Q1 ’26: 1,473 BTCBitcoin mined, Q2 ’26: 1,587 BTCBitcoin mined each quarterBitcoin mined by Riot, by quarter: 1,426 in the second quarter of 2025, 1,587 in the second quarter of 2026. Deployed hash rate rose from 35.4 to 44.4 exahash a second over the same period.05001,0001,5002,000Q2 ’25Q3 ’25Q4 ’25Q1 ’26Q2 ’26Bitcoin mined, Q2 ’25: 1,426 BTCBitcoin mined, Q3 ’25: 1,406 BTCBitcoin mined, Q4 ’25: 1,324 BTCBitcoin mined, Q1 ’26: 1,473 BTCBitcoin mined, Q2 ’26: 1,587 BTC
More machines produced only a little more bitcoin, because the whole network grew too: average network hash rate was 957 EH/s in the second quarter of 2026 against 876 a year earlier. Source Q2 2026 earnings presentation; 10-Q Q2 2026 [6][2]. Figures as reported.
Show the numbers
Bitcoin mined each quarter
Q2 ’25Q3 ’25Q4 ’25Q1 ’26Q2 ’26
Bitcoin mined (reported)1,4261,4061,3241,4731,587
Deployed hash rate, EH/s (reported)35.436.538.542.544.4
Cost to mine, excl. depreciation (reported)$48,992$46,324$60,619$44,629$49,912
Hash price, $ per PH/s a day (reported)$51$56$42$34$34

Revenue per unit of computing power, called hash price, was $34 per petahash a day in the first and second quarters of 2026, against $51 in the second quarter of 2025.6 The reward for each block halves again around April 2028, on the schedule built into bitcoin (estimate). Unless the price of bitcoin doubles, the revenue from every machine halves with it.

Riot also holds bitcoin. At 30 June it had 11,380, worth $666M at that day’s price of $58,527 and about $878M at the $77,180 close on 30 October.258 It sold 9,665 bitcoin in the first half for $732.5M, and the presentation calls selling bitcoin the main way it funds its share of data-centre building.26 Of the 11,380, 5,821 were pledged to a $200M Coinbase loan, which Riot repaid in full on 21 September.214

Data centres

This is the new business and the reason for the price. In January 2026 Riot bought the 200 acres under its Rockdale site for $96.0M, paid with about 1,080 bitcoin, and signed AMD to a ten-year lease for 25 MW of space, worth about $311M.9 AMD has since taken another 25 MW, holds the right to a further 50 MW, and has a first call on up to 100 MW more.2 The first 25 MW was delivered in May, on time and on budget, and cost $3.6M a MW to retrofit.69

On 10 August Riot announced a second lease, for 191 MW at Rockdale, with “a leading frontier AI lab” it has not named.5 The term is 20 years from full delivery, with two five-year renewals at the tenant’s option. Base rent over the first 20 years is about $9.1B, or $16.1B if both renewals run. The first 96 MW is due in December 2027 and the rest in June 2028.52 The company puts net operating income, rent less running costs, at $365M to $411M a year on average, and an illustrative build cost of $11.0M to $12.0M a MW, about $2.1B to $2.3B in all.56 A bank facility from Morgan Stanley of up to $573M pays for the first equipment orders until what the release calls an investment-grade credit backstop is finalized.57 The 10-Q gives no more about the tenant.

The data-centre revenue reported so far is mostly not rent. In the second quarter it was $23.2M, of which $18.3M was fit-out, equipment bought and installed for the tenant and paid back at cost plus a margin.6 Rent was $4.9M.6 Gross profit was $6.5M, or 28%.6 Power is passed to tenants at cost, so the cheap power that helps the miners earns nothing extra here.2

The company also has a non-binding letter of intent with one tenant for a lease of the whole Corsicana site.56 It is not a lease and I do not treat it as one.

Engineering

ESS Metron and E4A make switchgear and power equipment, mostly for Riot’s own building and for outside data-centre and utility customers. Revenue was $37.3M in the second quarter against $10.6M a year earlier, and backlog was $177.1M, 90% of it data-centre work.6 It is small, with a segment gross profit of $12.5M in the quarter.2

Where the revenue comes from

Segment revenue, US$ millions

  • Bitcoin mining, TTM $518M
  • Data center, TTM $56M
  • Engineering, TTM $100M
Where the revenue comes fromRevenue by segment. Bitcoin mining went from $189M in 2023 to $576M in 2025, then $518M over the twelve months to June 2026. Data center revenue began in 2026 and was $56M in the first half. Engineering was $100M over the twelve months.$0$200M$400M$600M202320242025TTMBitcoin mining, 2023: $189MBitcoin mining, 2024: $321MBitcoin mining, 2025: $576MBitcoin mining, TTM: $518MData center, 2023: $0MData center, 2024: $0MData center, 2025: $0MData center, TTM: $56MEngineering, 2023: $64MEngineering, 2024: $38MEngineering, 2025: $65MEngineering, TTM: $100MWhere the revenue comes fromRevenue by segment. Bitcoin mining went from $189M in 2023 to $576M in 2025, then $518M over the twelve months to June 2026. Data center revenue began in 2026 and was $56M in the first half. Engineering was $100M over the twelve months.$0$200M$400M$600M202320242025TTMBitcoin mining, 2023: $189MBitcoin mining, 2024: $321MBitcoin mining, 2025: $576MBitcoin mining, TTM: $518MData center, 2023: $0MData center, 2024: $0MData center, 2025: $0MData center, TTM: $56MEngineering, 2023: $64MEngineering, 2024: $38MEngineering, 2025: $65MEngineering, TTM: $100MWhere the revenue comes fromRevenue by segment. Bitcoin mining went from $189M in 2023 to $576M in 2025, then $518M over the twelve months to June 2026. Data center revenue began in 2026 and was $56M in the first half. Engineering was $100M over the twelve months.$0$200M$400M$600M202320242025TTMBitcoin mining, 2023: $189MBitcoin mining, 2024: $321MBitcoin mining, 2025: $576MBitcoin mining, TTM: $518MData center, 2023: $0MData center, 2024: $0MData center, 2025: $0MData center, TTM: $56MEngineering, 2023: $64MEngineering, 2024: $38MEngineering, 2025: $65MEngineering, TTM: $100M
Of the $56M of data center revenue in the first half of 2026, $51M was tenant fit-out paid back at cost plus a margin and $5M was rent. Other revenue (legacy hosting) is left out: $27M in 2023, $17M in 2024. Source 10-Ks 2023, 2025; 10-Q Q2 2026, Notes 3 and 18 [15][3][2]. Calculated from reported figures.
Show the numbers
Where the revenue comes from
202320242025TTM
Bitcoin mining (reported)$189M$321M$576M$518M
Data center (reported)$0M$0M$0M$56M
Engineering (reported)$64M$38M$65M$100M

Who pays

Mining revenue is paid in bitcoin by a mining pool, so the customer is the bitcoin network.3 In data centres there are two tenants, AMD and the unnamed AI lab. Once the 191 MW is running, one tenant would pay about $340M of base rent a year in 2029 on my numbers, half of what the whole company took in over the past year (estimate).2 The tenant’s credit matters more than anything else on this page, and I cannot judge it.

The moat

I ask whether a rival can take the customer at the same price, and whether the customer would want to switch. For Riot the answer differs by business.

Mining

There is no wall. Bitcoin is the same bitcoin whoever mines it, and Riot sells every coin at the market price. The company’s own filing says the industry faced “more aggressive competition for efficient energy sources” in 2025 and the first half of 2026, after the network’s computing power doubled across 2023 and 2024.2 Riot’s advantage is a low power cost. That is worth having and it is not a moat: the power contracts that set it expire. The Rockdale fixed-price contracts run to October 2027 for 150 MW and to April 2030 for the other 195 MW, and Corsicana’s retail power contract ends in November 2027.2

Data centres

The thing that is hard to copy is a grid connection. Riot says its power capacity is “already fully approved and energized,” in the chief executive’s words.5 A rival needs years of studies and a utility to say yes. In a market where AI companies cannot wait, being able to say “96 MW in December 2027” is worth real money. Riot has also shown it can build: it delivered AMD’s first space on time, and it signed 241 MW of leases in under seven months.6

Three things limit how much that is worth. The connections are scarce now, and the grid will not stay scarce for ever, so the premium for early power will probably shrink. The tenants are few and large and can choose among developers, which is a weak position for a landlord. And the buildings themselves are not special: a hall built to a tenant’s design is worth what the lease is worth, and little more once the tenant leaves.

Evidence it is thin

The rent per MW on the two leases differs by almost two to one: about $1.24M a MW a year from AMD against about $2.38M from the AI lab, both on contract revenue divided by MW and years (calculated).95 I cannot explain it from the filings. The newer building is larger in scope, so some of it must be the cost of the build, but a 20-year lease at nearly double the price is not what a crowded market looks like. It tells me the second lease is priced for a tenant who needed speed. The first Chief Data Center Officer left about ten months after joining, on 12 April 2026, and forfeited 1,147,910 shares.1016

My judgement: Riot has a strong position in the one scarce input, power connections, and a reasonable one in building. It has no wall around mining and a thin one around the leases it has not yet signed. The first two leases protect themselves with contracts; the next ones depend on the same scarcity lasting.

The competitive advantage

What Riot has is speed with its own parts. Its engineering unit makes the switchgear that sits on the critical path of a data hall, and the presentation says it has saved $23.8M on equipment since buying ESS Metron in 2021.6 The AMD space was delivered between January and May. Owning the land, which it bought outright in January, means no landlord or ground rent in the way.9

The second advantage is cost. The AMD retrofit, in an existing mining building, cost $3.6M a MW. New halls for the AI lab are priced at $11M to $12M.96 If Riot can keep finding existing buildings to convert it keeps a cost edge. But the cost edge ends where the buildings run out, and Riot’s own numbers show it: the biggest lease is new construction.

The two signed leases side by side

Both leases are at Rockdale. AMD figures use its 50 MW as reported; the other lease is the 191 MW.

The two leases
AMD191 MW tenant
Critical IT capacity (reported)50 MW signed; 150 MW more optional191 MW
TenantAdvanced Micro DevicesNot named; “a leading frontier AI lab”
Term, from full delivery (reported)10 years, three 5-year renewals20 years, two 5-year renewals
Delivery (reported)25 MW May 2026; 25 MW by May 202796 MW Dec 2027; 95 MW Jun 2028
Base rent over the first term (reported)$311M for the first 25 MW over ten years; $633M of base rent still to come at 30 June on 50 MWAbout $9.1B
Average rent a MW a year (calculated)About $1.24MAbout $2.38M
Build cost a MW (reported)$3.6M (retrofit)$11M to $12M, illustrative
Net operating income margin (reported)80% (average annual NOI over average annual revenue)80% to 90%
Credit support (reported)None disclosed“Investment-grade backstop in finalization”
Source Lease releases and the Q2 2026 presentation [9][2][5][6]. Rent per MW is contract value divided by MW and years: my calculation. The company calls the 191 MW build cost illustrative and the margin anticipated.

Against the alternatives

The nearest comparison on this site is Oracle, which is also building data centres for AI labs. At $130.67 its price is 7% above my base value, and S&P estimates half of its backlog is one customer, as my page notes.17 Riot has the same concentration at a smaller scale and a much weaker balance sheet. The other is Constellation Energy, which sells power to data centres and sits 20% above my base.18 Riot at $12.81 is 284% above its base. My Rocket Lab page, with a price 465% above its base, is the other extreme.19 On value alone, both sit much closer to my base values than Riot does.

Where it wins

Time to power, first. If a tenant needs 96 MW by December 2027 there are not many sites that can say yes. Cost of conversion, second, while there are buildings to convert. Control of the supply chain, third, through ESS Metron. And the balance sheet in the short run: the 30 June cash and bitcoin of $1.2B cover the equity Riot says it needs for the first lease.56

Where it loses

Scale and credit. It has never run a 191 MW build and has to deliver two phases, on a fixed schedule, to a tenant that pays only once the space is ready. Its overhead is heavy for a landlord: $158M of selling and administrative costs in the first half, $75M of it stock pay, against $78M of segment gross profit.2 And its money comes from selling bitcoin and borrowing, because the shares are cheaper than they were.

Management

Jason Les, 40, has been chief executive since February 2021 and a director since 2017. Before Riot he was a founding partner of a small software firm and, for more than a decade, a professional poker player.10 Benjamin Yi, 44, is executive chairman and has been a director since 2018.10 Jason Chung, who ran corporate development, became chief financial officer on 1 March 2026, when Colin Yee moved to a senior adviser role at $500,000 for the first year.10 Stephen Howell is chief operating officer. The first Chief Data Center Officer, Jonathan Gibbs, joined in June 2025 and left on 12 April 2026.1016 The same team that mined bitcoin now has to run a landlord’s business, and one of the two people hired for the job is already gone.

How they are paid

I follow the pay because it tells you what the company will do. Les and Yi each received $83.5M for 2024, almost all of it $79.3M of stock, in one-off performance awards granted in January 2024, when the shares were near $15, and July 2024, near $10.101 In 2025 each received $3.5M.10 Shareholders did not accept the 2024 figure. The 2025 vote on pay had 31.5% in favour.10 The company then gave the 2024 executives no long-term awards for 2025, capped payouts when the shares fall in absolute terms, and extended the measuring window. At the June 2026 meeting 98% of the votes for or against backed 2025 pay.1011 The change was real and fast.

What does the pay now reward? The long-term plan pays on Riot’s share price against the Russell 3000 over three years, so it pays for beating the market, with a cap if the shares fell.10 The annual plan for 2026 is 25% relative bitcoin production, 25% relative adjusted EBITDA, 15% data-centre revenue, 15% data-centre net operating income and 20% strategy.10 Half of the annual bonus therefore pays for mining volume and EBITDA, which counts stock pay as free and, as I show below, includes the fair-value swing on bitcoin held. That is where the incentive points, and it points slightly away from what the page shows matters: cash left for owners after stock pay and building.

What they own, and what they sold

Les is shown as owning 9.44M shares and Yi 10.64M, but about 7.07M of each is unvested performance stock and 0.79M unvested restricted stock.10 Les holds about 1.5M shares outright, worth about $19M at $12.81 (calculated). All directors and officers together are shown at 7.8% including unvested stock.10 They have sold small amounts into strength. Les sold 175,000 shares at $25.19 on 11 May and 62,703 at $30.09 on 22 June, the day of the 52-week high, about $6.3M in all (calculated).20211 On 31 July the company withheld 2,896,921 of his shares to pay tax at $20.17, about $58M of stock (calculated).22 I cannot see from the Form 4 which award vested, so I do not know what that cost Riot in cash; the third-quarter report will show it.

What they did with capital

The record over a full cycle is the clearest thing in the filings. Shares outstanding rose from 25.1M at the end of 2019 to 371.6M at the end of 2025, 14.8 times, and Riot sold $3.2B of stock through at-the-market programmes from 2020 to 2025, plus $594M of convertible notes in 2024.43 Owner cash flow over those six years added up to −$2.6B (calculated). In 2024 it spent $577.5M buying bitcoin, and in 2025 it issued 7.0M shares, valued at $49M, as part of settling litigation with Rhodium, a settlement that also gave it 125 MW at Rockdale and cost it a $158M loss in the income statement.32 I think buying the miners and the sites was reasonable; the record on price paid is mixed. The one move I can praise is the pivot itself: it sold bitcoin, not stock, to build the AMD space in 2026.2

Following the incentives, then. The chiefs hold stock, but mostly unvested stock they were awarded rather than bought, and their pay rises when the stock does. That pays them to build and to lease. It does not pay them to be sparing with the shares, and for six years they were not. The direction since the vote is better. A fair reading is a team that has taken in the message, as the 98% shows, and has yet to prove it can hold overhead down while the business triples.

One small governance item. The board stays in three classes until 2029, when directors face yearly elections.23

Financials

Riot’s history is two companies. Until 2020 it was a few million dollars of revenue and losses. Since 2021 it has been a large miner with a bitcoin treasury, and the statements are hard to read because the price of bitcoin runs through them. The table shows ten years where it exists. The twelve months to June 2026 are 2025 plus the first half of 2026 less the first half of 2025.

Ten years and the latest twelve months

Calendar years, US$ millions unless stated. Revenue for 2016 is under $0.2M and shown as $0.1M.

Financial summary by year
2016201720182019202020212022202320242025TTM Jun 2026
Revenue (reported)$0.1M$0.3M$7.8M$6.8M$12M$213M$259M$281M$377M$647M$675M
Revenue growth (calculated)–––−12.8%77.9%1662.0%21.6%8.3%34.2%71.9%–
Operating income (reported)−$5M−$13M−$59M−$9M−$16M−$30M−$513M−$63M$154M−$622M−$1,344M
Net income (reported)−$4M−$20M−$58M−$20M−$14M−$15M−$510M−$50M$109M−$663M−$1,324M
Operating cash flow (reported)−$6M−$4M−$19M−$15M−$3M−$86M$0M$33M−$255M−$573M−$492M
Bitcoin mined, added back (reported)––––$12M$184M$157M$189M$321M$576M$518M
Capital spending, with equipment deposits and land (reported)––$20M$5M$41M$422M$343M$424M$683M$563M$601M
Depreciation and amortization (reported)$0M$1M$5M–$4M$26M$108M$252M$212M$347M$381M
Stock pay (reported)$0.5M$2.6M$4.7M$0.7M$3.4M$68M$25M$32M$125M$126M$141M
Stock pay, share of revenue (calculated)––60.3%10.3%28.1%32.1%9.5%11.5%33.2%19.4%20.9%
Owner cash flow (calculated)––−$44M−$21M−$44M−$392M−$290M−$410M−$752M−$686M−$716M
Shares at year end, millions (reported)4.511.614.525.178.5116.7167.8230.8344.9371.6378.0
Operating income includes the change in the fair value of bitcoin held, from 2023. Bitcoin sales sat inside operating cash flow until 2024 and are taken out here so every year is built the same way. Source 10-Ks 2019 to 2025; 10-Q Q2 2026; SEC XBRL [12][13][15][3][2][4]. Figures as reported or calculated.

Revenue and operating income

Calendar years, US$ millions

  • Revenue, TTM $675M
  • Operating income, TTM −$1,344M
Revenue and operating incomeRevenue and GAAP operating income by year, 2016 to 2025, and the twelve months to June 2026. Revenue went from under $1M in 2017 to $647M in 2025 and $675M over the twelve months. Operating income was a profit of $154M in 2024 and a loss of $622M in 2025 and $1,344M over the twelve months, mostly from the change in the value of bitcoin held.−$1.5B−$1B−$500M$0$500M$1B’16’18’20’22’24TTMRevenue, 2016: $0MRevenue, 2017: $0MRevenue, 2018: $8MRevenue, 2019: $7MRevenue, 2020: $12MRevenue, 2021: $213MRevenue, 2022: $259MRevenue, 2023: $281MRevenue, 2024: $377MRevenue, 2025: $647MRevenue, TTM Jun 2026: $675MOperating income, 2016: −$5MOperating income, 2017: −$13MOperating income, 2018: −$59MOperating income, 2019: −$9MOperating income, 2020: −$16MOperating income, 2021: −$30MOperating income, 2022: −$513MOperating income, 2023: −$63MOperating income, 2024: $154MOperating income, 2025: −$622MOperating income, TTM Jun 2026: −$1,344MRevenue and operating incomeRevenue and GAAP operating income by year, 2016 to 2025, and the twelve months to June 2026. Revenue went from under $1M in 2017 to $647M in 2025 and $675M over the twelve months. Operating income was a profit of $154M in 2024 and a loss of $622M in 2025 and $1,344M over the twelve months, mostly from the change in the value of bitcoin held.−$1.5B−$1B−$500M$0$500M$1B’16’17’18’19’20’21’22’23’24’25TTMRevenue, 2016: $0MRevenue, 2017: $0MRevenue, 2018: $8MRevenue, 2019: $7MRevenue, 2020: $12MRevenue, 2021: $213MRevenue, 2022: $259MRevenue, 2023: $281MRevenue, 2024: $377MRevenue, 2025: $647MRevenue, TTM Jun 2026: $675MOperating income, 2016: −$5MOperating income, 2017: −$13MOperating income, 2018: −$59MOperating income, 2019: −$9MOperating income, 2020: −$16MOperating income, 2021: −$30MOperating income, 2022: −$513MOperating income, 2023: −$63MOperating income, 2024: $154MOperating income, 2025: −$622MOperating income, TTM Jun 2026: −$1,344MRevenue and operating incomeRevenue and GAAP operating income by year, 2016 to 2025, and the twelve months to June 2026. Revenue went from under $1M in 2017 to $647M in 2025 and $675M over the twelve months. Operating income was a profit of $154M in 2024 and a loss of $622M in 2025 and $1,344M over the twelve months, mostly from the change in the value of bitcoin held.−$1.5B−$1B−$500M$0$500M$1B’16’17’18’19’20’21’22’23’24’25TTMRevenue, 2016: $0MRevenue, 2017: $0MRevenue, 2018: $8MRevenue, 2019: $7MRevenue, 2020: $12MRevenue, 2021: $213MRevenue, 2022: $259MRevenue, 2023: $281MRevenue, 2024: $377MRevenue, 2025: $647MRevenue, TTM Jun 2026: $675MOperating income, 2016: −$5MOperating income, 2017: −$13MOperating income, 2018: −$59MOperating income, 2019: −$9MOperating income, 2020: −$16MOperating income, 2021: −$30MOperating income, 2022: −$513MOperating income, 2023: −$63MOperating income, 2024: $154MOperating income, 2025: −$622MOperating income, TTM Jun 2026: −$1,344M
TTM is the four quarters to 30 June 2026: 2025 plus the first half of 2026 less the first half of 2025. Operating income includes the change in the fair value of bitcoin held, a loss of $401M in the first half of 2026 and $116M in 2025, a gain of $457M in 2024. Source 10-Ks 2019, 2022, 2023, 2025; 10-Q Q2 2026; SEC XBRL [12][13][15][3][2][4]. Figures as reported or calculated from reported data.
Show the numbers
Revenue and operating income
2016201720182019202020212022202320242025TTM Jun 2026
Revenue (reported)$0M$0M$8M$7M$12M$213M$259M$281M$377M$647M$675M
Operating income (reported)−$5M−$13M−$59M−$9M−$16M−$30M−$513M−$63M$154M−$622M−$1,344M

Revenue rose from $0.3M in 2017 to $647M in 2025, almost entirely from mining. The growth came from buying machines and sites with money raised from shareholders, not from earnings. The year 2022 shows the earlier accounting: a net loss of $510M that included $336M of goodwill and $147M of bitcoin write-downs.13 In 2023 the company switched to carrying bitcoin at market value, so every move in the coin now runs through operating income. That is why 2024 shows a $154M operating profit and 2025 a $622M operating loss: the bitcoin mark swung from a $457M gain to a $116M loss, and 2025 also carried a $158M settlement loss and a $30M write-down.153

What an owner could really take out

Not much, and nothing yet. Owner cash flow is the number I rely on here, so here is how I build it. I start with operating cash flow. Mined bitcoin is revenue but is taken out of operating cash flow as a non-cash item, so I add it back; bitcoin sales that the company put in operating cash flow before 2024 I take out so the year is not counted twice. I then subtract everything spent on equipment, land and deposits for machines, and stock pay. Machines are not optional for a miner, and stock pay is a real cost to the people who own the shares.

On that basis owner cash flow over the twelve months to June 2026 was −$716M (calculated). Operating cash flow was −$492M. Add back $518M of bitcoin mined, and the business made $26M. Capital spending was $601M and stock pay $141M.32 The reported net loss was $1.32B, much larger than the cash loss, because $401M of the first-half loss was only the fall in the value of bitcoin held.2 Over the six years 2020 to 2025 owner cash flow added up to −$2.6B.

Net income against the cash an owner put in

US$ millions. Owner cash flow is operating cash flow, plus bitcoin mined, less capital spending, less stock pay.

  • Net income, TTM −$1,324M
  • Owner cash flow, TTM −$716M
Net income against the cash an owner put inNet income and owner cash flow by year. From 2020 to 2025 owner cash flow added up to −$2,574M. Twelve months to June 2026: net loss $1,324M, owner cash flow −$716M.−$1.5B−$1B−$500M$0$500M’16’18’20’22’24TTMNet income, 2016: −$4MNet income, 2017: −$20MNet income, 2018: −$58MNet income, 2019: −$20MNet income, 2020: −$14MNet income, 2021: −$15MNet income, 2022: −$510MNet income, 2023: −$50MNet income, 2024: $109MNet income, 2025: −$663MNet income, TTM Jun 2026: −$1,324MOwner cash flow, 2016: $0MOwner cash flow, 2017: $0MOwner cash flow, 2018: −$44MOwner cash flow, 2019: −$21MOwner cash flow, 2020: −$44MOwner cash flow, 2021: −$392MOwner cash flow, 2022: −$290MOwner cash flow, 2023: −$410MOwner cash flow, 2024: −$752MOwner cash flow, 2025: −$686MOwner cash flow, TTM Jun 2026: −$716MNet income against the cash an owner put inNet income and owner cash flow by year. From 2020 to 2025 owner cash flow added up to −$2,574M. Twelve months to June 2026: net loss $1,324M, owner cash flow −$716M.−$1.5B−$1B−$500M$0$500M’16’17’18’19’20’21’22’23’24’25TTMNet income, 2016: −$4MNet income, 2017: −$20MNet income, 2018: −$58MNet income, 2019: −$20MNet income, 2020: −$14MNet income, 2021: −$15MNet income, 2022: −$510MNet income, 2023: −$50MNet income, 2024: $109MNet income, 2025: −$663MNet income, TTM Jun 2026: −$1,324MOwner cash flow, 2016: $0MOwner cash flow, 2017: $0MOwner cash flow, 2018: −$44MOwner cash flow, 2019: −$21MOwner cash flow, 2020: −$44MOwner cash flow, 2021: −$392MOwner cash flow, 2022: −$290MOwner cash flow, 2023: −$410MOwner cash flow, 2024: −$752MOwner cash flow, 2025: −$686MOwner cash flow, TTM Jun 2026: −$716MNet income against the cash an owner put inNet income and owner cash flow by year. From 2020 to 2025 owner cash flow added up to −$2,574M. Twelve months to June 2026: net loss $1,324M, owner cash flow −$716M.−$1.5B−$1B−$500M$0$500M’16’17’18’19’20’21’22’23’24’25TTMNet income, 2016: −$4MNet income, 2017: −$20MNet income, 2018: −$58MNet income, 2019: −$20MNet income, 2020: −$14MNet income, 2021: −$15MNet income, 2022: −$510MNet income, 2023: −$50MNet income, 2024: $109MNet income, 2025: −$663MNet income, TTM Jun 2026: −$1,324MOwner cash flow, 2016: $0MOwner cash flow, 2017: $0MOwner cash flow, 2018: −$44MOwner cash flow, 2019: −$21MOwner cash flow, 2020: −$44MOwner cash flow, 2021: −$392MOwner cash flow, 2022: −$290MOwner cash flow, 2023: −$410MOwner cash flow, 2024: −$752MOwner cash flow, 2025: −$686MOwner cash flow, TTM Jun 2026: −$716M
Net income swings with the price of bitcoin held; owner cash flow does not. Owner cash flow for 2016 and 2017 is not shown. From 2018 to 2019 the company mined almost nothing. Source 10-Ks 2019 to 2025; 10-Q Q2 2026; SEC XBRL [12][13][15][3][2][4]. Calculated from reported figures; see the definition in Section V.
Show the numbers
Net income against the cash an owner put in
2016201720182019202020212022202320242025TTM Jun 2026
Net income (reported)−$4M−$20M−$58M−$20M−$14M−$15M−$510M−$50M$109M−$663M−$1,324M
Operating cash flow (reported)−$6M−$4M−$19M−$15M−$3M−$86M$0M$33M−$255M−$573M−$492M
Bitcoin mined, added back (reported)$0M$0M$0M$0M$12M$184M$157M$189M$321M$576M$518M
Capital spending (reported)$0M$0M$20M$5M$41M$422M$343M$424M$683M$563M$601M
Stock pay (reported)$0M$3M$5M$1M$3M$68M$25M$32M$125M$126M$141M
Owner cash flow (calculated)$0M$0M−$44M−$21M−$44M−$392M−$290M−$410M−$752M−$686M−$716M

How much of the capital spending is the cost of standing still? For a miner, a lot. The company’s own schedule shows $472M of depreciation still to come on its machines, $133.6M in the rest of 2026, $219.9M in 2027 and $99.3M in 2028, because the machines last about three years.2 If hash price stays near $34, replacing them costs about what they earn, so I treat machine spending as maintenance and not growth. Data-centre construction is different: I count it as growth, because it buys new income.

Quality of earnings

Adjusted EBITDA looks cleaner than it is. Riot’s reconciliation adds back stock pay, derivative marks and an asset write-down but does not remove the change in the value of bitcoin held.2 In the second quarter of 2026 adjusted EBITDA was −$69.7M. The bitcoin mark was a loss of $74.6M, so without it adjusted EBITDA was about $4.9M, against about $24.5M a year earlier when the mark was a $470.8M gain (calculated).2 That $4.9M is before $35.6M of stock pay. After it the quarter’s result is about −$30.7M (calculated). The segment table tells the same story: in the first half, segment gross profit was $78.4M, plus $31.1M of power credits that sit outside it, against $158.2M of selling and administrative cost.2 The business pays the bills in the plant and falls short in the head office.

Mining gross margin before depreciation

The share of mining revenue left after power, labour, insurance and site costs.

Mining gross margin
202320242025H1 2026H1 2026 with power credits
Gross margin (calculated)48.9%41.1%41.2%22.0%35.8%
Source 10-Ks 2025, 2023; 10-Q Q2 2026 [3][15][2]. Calculated from cost of revenue for Bitcoin Mining. Power curtailment credits are shown outside cost of revenue and added back here for the last column.

Mining margins have shrunk from 49% in 2023 to 22% in the first half of 2026, 36% counting the power credits, because hash price fell and Riot’s costs rose with its footprint.1526

The balance sheet

At 30 June Riot held $549M of cash, of which $77.5M was restricted, and 11,380 bitcoin carried at $666.0M.2 Debt was $594.4M of 0.75% convertible notes due 2030, convertible at about $14.86 a share, $54.3M on two revolving lines, and a $200M Coinbase loan secured on bitcoin, which Riot repaid in full on 21 September without a fee.3214 The notes are worth more as debt than as shares at $12.81. Total assets fell from $3.94B at the end of 2025 to $3.26B, mostly the bitcoin sold and written down.2 Equity is $2.19B.

The new debt is the Morgan Stanley facility of up to $573M, which funds equipment for the 191 MW lease. It is secured on the project, carries SOFR plus 2.75%, has no recourse to Riot Platforms, Inc., and, according to the 8-K, matures on 31 December 2026.7 The 10-Q, filed four days earlier, gives 15 October 2026, extendable in certain circumstances if Riot refinances.2 The credit agreement itself governs and it is not public until it is filed with the third-quarter 10-Q. Until then I use 31 December: the 8-K is the later filing and the one written about this agreement, the two read as an initial date that can be extended, and no filing since 15 October reports a default or an amendment. Either way it must be refinanced within weeks, which the company says it will do with permanent project debt once the investment-grade backstop is in place.5 I could not find a refinancing filed by 31 October.

Two smaller items. The federal tax losses are $778M.3 And Riot is a defendant in patent suits over bitcoin transactions and immersion cooling, including a claim for more than $52M and a new complaint in June.2 I cannot size them.

Shares outstanding

Millions of shares at year end

  • 30 June 2026 378.0M
Shares outstandingCommon shares outstanding at each year end: 25.1M in 2019, 78.5M in 2020, 371.6M in 2025 and 378.0M at 30 June 2026. The company raised $3.2B from selling stock through at-the-market programmes from 2020 to 2025.0M100M200M300M400M2019202120232025Shares, 2019: 25.1M sharesShares, 2020: 78.5M sharesShares, 2021: 116.7M sharesShares, 2022: 167.8M sharesShares, 2023: 230.8M sharesShares, 2024: 344.9M sharesShares, 2025: 371.6M sharesShares, Jun ’26: 378.0M sharesShares outstandingCommon shares outstanding at each year end: 25.1M in 2019, 78.5M in 2020, 371.6M in 2025 and 378.0M at 30 June 2026. The company raised $3.2B from selling stock through at-the-market programmes from 2020 to 2025.0M100M200M300M400M2019202020212022202320242025Jun ’26Shares, 2019: 25.1M sharesShares, 2020: 78.5M sharesShares, 2021: 116.7M sharesShares, 2022: 167.8M sharesShares, 2023: 230.8M sharesShares, 2024: 344.9M sharesShares, 2025: 371.6M sharesShares, Jun ’26: 378.0M sharesShares outstandingCommon shares outstanding at each year end: 25.1M in 2019, 78.5M in 2020, 371.6M in 2025 and 378.0M at 30 June 2026. The company raised $3.2B from selling stock through at-the-market programmes from 2020 to 2025.0M100M200M300M400M2019202020212022202320242025Jun ’26Shares, 2019: 25.1M sharesShares, 2020: 78.5M sharesShares, 2021: 116.7M sharesShares, 2022: 167.8M sharesShares, 2023: 230.8M sharesShares, 2024: 344.9M sharesShares, 2025: 371.6M sharesShares, Jun ’26: 378.0M shares
Shares outstanding rose 15 times in about seven years, and the company sold $3.2B of stock to fund it. In the first half of 2026 it sold none and sold bitcoin instead. Source 10-Ks 2019 to 2025; 10-Q Q2 2026; SEC XBRL [3][2][4]. The count includes unvested restricted shares. Calculated from reported figures.
Show the numbers
Shares outstanding
2019202020212022202320242025Jun ’26
Shares outstanding, millions (reported)25.178.5116.7167.8230.8344.9371.6378.0

The point of the share chart is simple. Most of the money for building since 2020 came from selling shares, $3.2B of stock against $2.6B of owner cash outflow, and the price ran from $0.65 to $77.90 and back to $12.81 across the period.1 In 2026 the company sold none and sold bitcoin instead. The next phase, $2.3B of buildings and perhaps much more, will be paid mostly with debt, and Riot says the equity part is covered by what it already holds.6

The share price since 2016

Last close of each calendar quarter, log scale: each gridline is ten times the one below

  • Close, Q4 2026 $12.81
The share price since 2016Quarter-end closes on a log scale, from $3.84 at the end of 2016 to $12.81. The lowest close was $0.65 on 18 March 2020 and the highest $77.90 on 17 February 2021.$0.50$1$10$100’17’18’19’20’21’22’23’24’25’26The share price since 2016Quarter-end closes on a log scale, from $3.84 at the end of 2016 to $12.81. The lowest close was $0.65 on 18 March 2020 and the highest $77.90 on 17 February 2021.$0.50$1$10$100’17’18’19’20’21’22’23’24’25’26The share price since 2016Quarter-end closes on a log scale, from $3.84 at the end of 2016 to $12.81. The lowest close was $0.65 on 18 March 2020 and the highest $77.90 on 17 February 2021.$0.50$1$10$100’17’18’19’20’21’22’23’24’25’26
The shares closed at $27.38 on 30 June 2026, the date of the fund holding in the 13F, and have fallen 53% since, while bitcoin rose 32% ($58,527 to $77,180). Source Nasdaq historical; Coinbase [1][8]. Calculated from reported closes.

Valuation

First, how this goes badly wrong

Before any numbers I ask what would most likely ruin the investment, and work back. Here there are three, and they are not equally likely.

The tenant. One tenant, whose name I do not know, would pay about $340M a year of base rent in 2029 on my numbers, half of what the whole company took in over the past year (estimate). The release says an investment-grade credit backstop is being finalized, and the financing that funds the building is a bank bridge that matures on 31 December 2026, the date I use.57 If the backstop does not arrive, or the tenant later cannot pay for compute it has committed to, Riot has a half-built, special-purpose building. I give the tenant paying and the backstop arriving 70% (estimate).

The overhead. This is the one that surprised me. Riot’s selling and administrative cost was $158M in the first half of 2026, with stock pay of $74.7M in the half, against segment gross profit of $78.4M and $31.1M of power credits.2 In my base the two signed leases earn about $340M a year of net operating income by 2029, and overhead and stock pay still take back $200M of it. Unless the head office shrinks while the business grows, the leases do not reach shareholders.

The price. The business can work and the investment still fail. At $12.81 the market is paying for about 1.8 GW of leases that are not signed, at my base economics. If Riot signs a quarter of that, or all of it on weaker terms, the shares do not earn their cost.

So the questions for everything below are: will the tenant pay, can Riot cut its overhead as it grows, and how much of the unsigned future is already in the price.

What an owner gets today

Nothing. Owner cash flow over the past year was −$716M, against a net loss of $1.32B (calculated).2 The difference is the fall in the value of bitcoin, which cost shareholders nothing in cash. In my base owner cash is negative through 2031 as the building is paid for, first turns positive in 2032, and reaches about $574M in 2036 (estimate).

The large first number is the capital. The 191 MW costs about $2.2B at the middle of the company’s range, and the AMD space about $0.08B more.6 The company says $1.7B to $2.1B of that will be borrowed at 80% to 90% of cost, an expected $180M term loan on the first AMD space will go in, and the net equity needed is $30M to $280M, which its $1.2B of liquidity covers.6 It is a plan, not a closed loan.

What I can’t judge

Four inputs matter most and cannot be known. First, the tenant’s credit and whether the backstop arrives. Second, whether the Corsicana letter of intent becomes a lease, how big, and at what price; I have only the company’s word that talks are advanced. Third, the lease economics themselves, where the company calls its build cost illustrative and its margin anticipated, and the rent per MW is nearly double what AMD pays and I cannot explain why.6 Fourth, bitcoin, whose price decides the treasury, the miners and the halving. Where I cannot know, I show a range in the tables below, and the range is wide: from about nothing to about $14 a share.

How I value it

I add up cash that owners can really take out, in five parts: the two signed leases, new leases I assume are signed later, mining, engineering, and the cost of running the company, with tax. Everything is after stock pay, treated as a cash cost, and after the building and machine spending needed to earn it. The balance sheet is at 30 June 2026 and is added at the end: cash, plus bitcoin at the $77,180 close on 30 October, less the convertible notes, the revolvers and the Coinbase loan, which Riot repaid on 21 September.

The model runs from 1 July 2026 to 2048, the last year of the 191 MW lease, with an exit value for the leases at the end. The 191 MW rent is set so that 20 years of base rent add to $9.1B, with a 3% yearly step, the step in AMD’s lease. Rent starts on the dates the company gives. Net operating income is a share of rent. Build cost is $11.5M a MW at the middle of the range. New leases earn a first-year NOI on cost, and each case sets that figure. Mining is revenue from hash price and operating hash rate, less cost to mine, less new machines whenever they pay for themselves, and it winds down when they do not. Engineering is a small margin on $150M to $190M of revenue. Overhead starts from the first-half run rate, and tax uses the $778M of losses first. I count no value for AMD’s renewal options after its leases end in 2036 and 2037.

Bear, base and bull

Value per share, US$. The signed leases are the same in every case except for cost, margin, delay and exit multiple.

Bear, base and bull cases
BearBaseBull
Cost of the 191 MW, a MW, and delay (estimate)$12.0M, one year late$11.5M, on time$11.0M, on time
Net operating income margin on the 191 MW rent (estimate)80%85%90%
Exit multiple on lease income after 2048 (estimate)8 times10 times12 times
New MW leased beyond the 241 MW signed (estimate)No new lease300 MW, 2029 to 20311,000 MW, 2029 to 2032
First-year NOI on cost, new leases (estimate)–13.0%14.5%
Hash price in 2029, after the halving, $ per PH a day (estimate)$19$27$36
Bitcoin held, value against the 30 October price (estimate)70%100%100%
Overhead and stock pay, 2027 and 2029 (estimate)$215M, $110M$260M, $200M$260M, $250M
Owner cash, first positive year (estimate)203020322033
Owner cash, 2027 to 2030, before debt (estimate)−$2.3B−$4.3B−$6.9B
Value of the signed leases, per share (estimate)$2.17$3.81$5.14
Value of new leases, per share (estimate)$0.00$2.68$13.02
Mining and engineering, per share (estimate)$0.21$0.83$2.67
Overhead, stock pay and tax, per share (estimate)−$3.16−$5.52−$8.63
Cash and bitcoin, net of debt, per share (estimate)$0.83$1.53$1.53
Value per share (estimate)$0.06$3.34$13.73
Return a year at the price (estimate)−0.4%5.5%10.5%
Source 10-Q Q2 2026; Q2 2026 release and presentation; Form 4s [2][5][6]. All assumptions are my estimates.
Bear
The 191 MW lease is built a year late at $12.0M a MW and earns the low end of the company’s margin. No new lease is signed beyond AMD and the AI lab, bitcoin is worth 30% less than it is today, mining stops paying after the April 2028 halving, and the board cuts overhead to $110M by 2029. Owner cash turns positive in 2030, and the shares are worth about what the cash and the signed leases leave after overhead: close to nothing.
Base
The 191 MW is delivered on time at $11.5M a MW and earns 85% of its rent. AMD takes its reserved 50 MW and Riot signs about 250 MW more at Corsicana, 300 MW in all from 2029 to 2031, each earning a first-year NOI of 13.0% of cost, the first-year figure of the signed lease. Mining earns little after the halving. Overhead and stock pay fall from about $310M to $260M in 2027 and $200M in 2029. Owner cash turns positive in 2032.
Bull
The Corsicana letter of intent becomes a lease and Riot builds about 1,000 MW of new space from 2029 to 2032 at $11.0M a MW and 14.5% first-year yield. The 191 MW is built a little cheaper at 90% NOI margin, and hash price is $36 in 2029 and rises 3% a year. Overhead stays near $250M as the company grows several times over. Owner cash turns positive in 2033.

The base path

US$ millions, before debt, calendar years.

The base path
202720282029203020312033203620402048
191 MW lease NOI (estimate)$12M$214M$289M$298M$307M$325M$355M$400M$250M
AMD NOI (estimate)$43M$50M$51M$53M$49M$52M$57M$0M$0M
New leases NOI (estimate)$0M$0M$75M$229M$387M$490M$536M$603M$764M
Mining cash after machines (estimate)$64M$28M$29M$25M$21M$15M$9M$0M$1M
Overhead and stock pay (estimate)−$260M−$235M−$200M−$206M−$212M−$225M−$246M−$277M−$351M
Building spending (estimate)−$1.1B−$1.3B−$1.1B−$1.1B−$575M$0M$0M$0M$0M
Owner cash before debt (estimate)−$1.3B−$1.3B−$939M−$800M−$84M$589M$574M$582M$521M
Building spending includes the 191 MW, AMD and the new leases. Owner cash is before interest and before the debt that pays for the building. Source Model in this page’s method; 10-Q Q2 2026 [2]. All values are my estimates.

Net operating income from the two signed leases

US$ millions a year, my base estimates

  • 191 MW lease, 2029 $289M
  • AMD, 2029 $51M
Net operating income from the two signed leasesMy base estimate of net operating income from the AMD lease and the 191 MW lease, by year. It reaches $340M in 2029 and $492M in 2047, before overhead, tax and any new lease.$0$200M$400M$600M’26’28’30’32’34’36’38’40’42’44’46191 MW lease, 2026: $0M191 MW lease, 2027: $12M191 MW lease, 2028: $214M191 MW lease, 2029: $289M191 MW lease, 2030: $298M191 MW lease, 2031: $307M191 MW lease, 2032: $316M191 MW lease, 2033: $325M191 MW lease, 2034: $335M191 MW lease, 2035: $345M191 MW lease, 2036: $355M191 MW lease, 2037: $366M191 MW lease, 2038: $377M191 MW lease, 2039: $388M191 MW lease, 2040: $400M191 MW lease, 2041: $412M191 MW lease, 2042: $424M191 MW lease, 2043: $437M191 MW lease, 2044: $450M191 MW lease, 2045: $464M191 MW lease, 2046: $478M191 MW lease, 2047: $492M191 MW lease, 2048: $250MAMD, 50 MW, 2026: $13MAMD, 50 MW, 2027: $43MAMD, 50 MW, 2028: $50MAMD, 50 MW, 2029: $51MAMD, 50 MW, 2030: $53MAMD, 50 MW, 2031: $49MAMD, 50 MW, 2032: $51MAMD, 50 MW, 2033: $52MAMD, 50 MW, 2034: $54MAMD, 50 MW, 2035: $55MAMD, 50 MW, 2036: $57MAMD, 50 MW, 2037: $29MAMD, 50 MW, 2038: $0MAMD, 50 MW, 2039: $0MAMD, 50 MW, 2040: $0MAMD, 50 MW, 2041: $0MAMD, 50 MW, 2042: $0MAMD, 50 MW, 2043: $0MAMD, 50 MW, 2044: $0MAMD, 50 MW, 2045: $0MAMD, 50 MW, 2046: $0MAMD, 50 MW, 2047: $0MAMD, 50 MW, 2048: $0MNet operating income from the two signed leasesMy base estimate of net operating income from the AMD lease and the 191 MW lease, by year. It reaches $340M in 2029 and $492M in 2047, before overhead, tax and any new lease.$0$200M$400M$600M’26’28’30’32’34’36’38’40’42’44’46191 MW lease, 2026: $0M191 MW lease, 2027: $12M191 MW lease, 2028: $214M191 MW lease, 2029: $289M191 MW lease, 2030: $298M191 MW lease, 2031: $307M191 MW lease, 2032: $316M191 MW lease, 2033: $325M191 MW lease, 2034: $335M191 MW lease, 2035: $345M191 MW lease, 2036: $355M191 MW lease, 2037: $366M191 MW lease, 2038: $377M191 MW lease, 2039: $388M191 MW lease, 2040: $400M191 MW lease, 2041: $412M191 MW lease, 2042: $424M191 MW lease, 2043: $437M191 MW lease, 2044: $450M191 MW lease, 2045: $464M191 MW lease, 2046: $478M191 MW lease, 2047: $492M191 MW lease, 2048: $250MAMD, 50 MW, 2026: $13MAMD, 50 MW, 2027: $43MAMD, 50 MW, 2028: $50MAMD, 50 MW, 2029: $51MAMD, 50 MW, 2030: $53MAMD, 50 MW, 2031: $49MAMD, 50 MW, 2032: $51MAMD, 50 MW, 2033: $52MAMD, 50 MW, 2034: $54MAMD, 50 MW, 2035: $55MAMD, 50 MW, 2036: $57MAMD, 50 MW, 2037: $29MAMD, 50 MW, 2038: $0MAMD, 50 MW, 2039: $0MAMD, 50 MW, 2040: $0MAMD, 50 MW, 2041: $0MAMD, 50 MW, 2042: $0MAMD, 50 MW, 2043: $0MAMD, 50 MW, 2044: $0MAMD, 50 MW, 2045: $0MAMD, 50 MW, 2046: $0MAMD, 50 MW, 2047: $0MAMD, 50 MW, 2048: $0MNet operating income from the two signed leasesMy base estimate of net operating income from the AMD lease and the 191 MW lease, by year. It reaches $340M in 2029 and $492M in 2047, before overhead, tax and any new lease.$0$200M$400M$600M’26’28’30’32’34’36’38’40’42’44’46191 MW lease, 2026: $0M191 MW lease, 2027: $12M191 MW lease, 2028: $214M191 MW lease, 2029: $289M191 MW lease, 2030: $298M191 MW lease, 2031: $307M191 MW lease, 2032: $316M191 MW lease, 2033: $325M191 MW lease, 2034: $335M191 MW lease, 2035: $345M191 MW lease, 2036: $355M191 MW lease, 2037: $366M191 MW lease, 2038: $377M191 MW lease, 2039: $388M191 MW lease, 2040: $400M191 MW lease, 2041: $412M191 MW lease, 2042: $424M191 MW lease, 2043: $437M191 MW lease, 2044: $450M191 MW lease, 2045: $464M191 MW lease, 2046: $478M191 MW lease, 2047: $492M191 MW lease, 2048: $250MAMD, 50 MW, 2026: $13MAMD, 50 MW, 2027: $43MAMD, 50 MW, 2028: $50MAMD, 50 MW, 2029: $51MAMD, 50 MW, 2030: $53MAMD, 50 MW, 2031: $49MAMD, 50 MW, 2032: $51MAMD, 50 MW, 2033: $52MAMD, 50 MW, 2034: $54MAMD, 50 MW, 2035: $55MAMD, 50 MW, 2036: $57MAMD, 50 MW, 2037: $29MAMD, 50 MW, 2038: $0MAMD, 50 MW, 2039: $0MAMD, 50 MW, 2040: $0MAMD, 50 MW, 2041: $0MAMD, 50 MW, 2042: $0MAMD, 50 MW, 2043: $0MAMD, 50 MW, 2044: $0MAMD, 50 MW, 2045: $0MAMD, 50 MW, 2046: $0MAMD, 50 MW, 2047: $0MAMD, 50 MW, 2048: $0M
The 191 MW lease is spread so that its base rent adds to $9.1B over 20 years with a 3% yearly step, the step in the AMD lease. The step is my assumption. NOI is 85% of rent for the 191 MW lease, inside the company’s 80% to 90%. The 2048 bar is half a year because the lease ends in June 2048. Source 10-Q Q2 2026, Note 3; Q2 2026 release and presentation [2][5][6]. NOI margin, step and timing are my estimates.
Show the numbers
Net operating income from the two signed leases
20262027202820292030203120322033203420352036203720382039204020412042204320442045204620472048
191 MW lease NOI (estimate)$0M$12M$214M$289M$298M$307M$316M$325M$335M$345M$355M$366M$377M$388M$400M$412M$424M$437M$450M$464M$478M$492M$250M
AMD NOI (estimate)$13M$43M$50M$51M$53M$49M$51M$52M$54M$55M$57M$29M$0M$0M$0M$0M$0M$0M$0M$0M$0M$0M$0M

Owner cash in my three cases

US$ millions a year, before debt: bear to bull, with the base marked

  • Bear to bull, 2040 $165M to $1,876M
  • Base, 2040 $582M
Owner cash in my three casesOwner cash flow before financing, by year. In the base it is −$1,283M in 2027 and −$1,301M in 2028 while the 191 MW is built, then turns positive in 2032 and reaches $582M in 2040. The bear reaches $165M; the bull $1,876M.−$3B−$2B−$1B$0$1B$2B’26’28’30’32’34’36’38Owner cash in my three casesOwner cash flow before financing, by year. In the base it is −$1,283M in 2027 and −$1,301M in 2028 while the 191 MW is built, then turns positive in 2032 and reaches $582M in 2040. The bear reaches $165M; the bull $1,876M.−$3B−$2B−$1B$0$1B$2B’26’28’30’32’34’36’38Owner cash in my three casesOwner cash flow before financing, by year. In the base it is −$1,283M in 2027 and −$1,301M in 2028 while the 191 MW is built, then turns positive in 2032 and reaches $582M in 2040. The bear reaches $165M; the bull $1,876M.−$3B−$2B−$1B$0$1B$2B’26’28’30’32’34’36’38
Negative years are capital spending that debt or new shares would have to fund. Everything after the first half of 2026 is my estimate. Source 10-Q Q2 2026; Q2 2026 release and presentation [2][5][6]. Assumptions and values are my estimates.
Show the numbers
Owner cash in my three cases
202620272028202920302031203220332034203520362037203820392040
Bear (estimate)−$153M−$522M−$1,265M−$694M$174M$174M$179M$185M$190M$196M$202M$180M$156M$161M$165M
Base (estimate)−$450M−$1,283M−$1,301M−$939M−$800M−$84M$575M$589M$604M$596M$574M$566M$556M$570M$582M
Bull (estimate)−$410M−$1,121M−$1,471M−$1,905M−$2,439M−$2,289M−$222M$1,565M$1,612M$1,660M$1,710M$1,739M$1,768M$1,821M$1,876M

What my base value is made of

Dollars a share, my base case

  • Sum of the parts $3.34
What my base value is made ofBase value per share by part: Signed leases $3.81; New leases $2.68; Mining $0.53; Engineering $0.29; Overhead and stock pay −$4.87; Tax −$0.65; Cash and bitcoin, net $1.53. They add to $3.34.−$6−$4−$2$0$2$4$6SignedMiningOverheadCashValue per share, Signed leases: $3.81Value per share, New leases: $2.68Value per share, Mining: $0.53Value per share, Engineering: $0.29Value per share, Overhead and stock pay: −$4.87Value per share, Tax: −$0.65Value per share, Cash and bitcoin, net: $1.53What my base value is made ofBase value per share by part: Signed leases $3.81; New leases $2.68; Mining $0.53; Engineering $0.29; Overhead and stock pay −$4.87; Tax −$0.65; Cash and bitcoin, net $1.53. They add to $3.34.−$6−$4−$2$0$2$4$6SignedNewMiningEng.OverheadTaxCashValue per share, Signed leases: $3.81Value per share, New leases: $2.68Value per share, Mining: $0.53Value per share, Engineering: $0.29Value per share, Overhead and stock pay: −$4.87Value per share, Tax: −$0.65Value per share, Cash and bitcoin, net: $1.53What my base value is made ofBase value per share by part: Signed leases $3.81; New leases $2.68; Mining $0.53; Engineering $0.29; Overhead and stock pay −$4.87; Tax −$0.65; Cash and bitcoin, net $1.53. They add to $3.34.−$6−$4−$2$0$2$4$6SignedNewMiningEng.OverheadTaxCashValue per share, Signed leases: $3.81Value per share, New leases: $2.68Value per share, Mining: $0.53Value per share, Engineering: $0.29Value per share, Overhead and stock pay: −$4.87Value per share, Tax: −$0.65Value per share, Cash and bitcoin, net: $1.53
The two signed leases and new leases are worth about $6.50 a share together, and overhead and stock pay take back $4.87. Cash and bitcoin are counted at the 30 October bitcoin price, net of the convertible notes and bank debt. Source Model in this page’s method; 10-Q Q2 2026 [2]. Values are my estimates.
Show the numbers
What my base value is made of
Signed leasesNew leasesMiningEngineeringOverhead and stock payTaxCash and bitcoin, net
Dollars a share (estimate)$3.81$2.68$0.53$0.29−$4.87−$0.65$1.53

The discount rates. I use three, and the page’s numbers rest on them. The ten-year Treasury yield was 4.94% at the price date and Damodaran’s implied equity risk premium 4.20%.2425 On Riot’s five-year weekly beta of 2.84 against the S&P 500, its cost of equity would be 16.9%.26 That is a miner’s beta, driven by bitcoin, and it overstates the risk of a signed lease. So I use 9.5% for cash under the two signed leases, 11% for new leases that are not yet signed, and 13% for mining, engineering, overhead and tax (estimate). The lease rate sits above what investment-grade tenants command because the tenant is unrated, the buildings are not built, and the builder is new at it. The tables show what other rates do.

Base value by discount rate

Dollars a share. Rows: the rate on cash under the signed leases. Columns: the rate on mining, overhead and tax; new leases use that rate minus two points.

Base value by discount rate
Rate on the signed leasesOther rate 11%13%, my rate15%
7.5% (estimate)$6.88$5.52$4.64
8.5% (estimate)$5.70$4.34$3.46
9.5%, my rate (estimate)$4.70$3.34$2.47
10.5% (estimate)$3.86$2.49$1.62
11.5% (estimate)$3.14$1.77$0.90
One point on the signed-lease rate moves the base by about $1.0 a share, because the cash arrives over twenty years. Source Model in this page’s method [2]. All values are my estimates.

What the price says

Turn it round. At $12.81 the market values the company at about $4.8B on fully diluted shares, and about $4.3B after the net cash and bitcoin (calculated). The two signed leases will earn about $340M a year in 2029 by my numbers, for $2.3B more of building. Divide: that is 5.2% on the enterprise value plus the money still to be spent (calculated). The 191 MW lease earns about 13% on cost in its first year on my numbers, so the market is paying for more than the two leases.

Reverse discounted cash flow

What the price needs, at my base assumptions.

Reverse discounted cash flow
Market value on fully diluted shares (calculated)$4.84B: $12.81 on 377.5M shares
Cash and bitcoin, less the convertible notes and bank debt (calculated)$0.58B, with bitcoin at $77,180
Enterprise value at the price (calculated)$4.3B
Still to spend on the two signed leases (estimate)$2.3B ($2.2B for the 191 MW, $0.08B for AMD)
Run-rate NOI from the two leases in 2029, base (estimate)$340M
Their yield on enterprise value plus the spending to come (calculated)5.2%, against 13% to 18% earned on cost on the new lease
What the company is worth to me with no new lease, per share (estimate)$1.21, my base with no new lease
What the price leaves for new leases, per share (calculated)$11.60, or $4.4B
New MW that needs, at my base 13.0% yield (calculated)About 1,781 MW, against my 300 MW
Or at the 1,000 MW of the Corsicana letter of intent, yield needed (calculated)15.3% in year one, against 13.0% on the signed lease and my bull 14.5%
Source Nasdaq; Coinbase; 10-Q Q2 2026; Q2 2026 presentation [1][8][2][6]. Derived values are my calculations on my base case.

My base with no new lease is worth about $1.21 a share, so the price leaves about $4.4B for leases not yet signed (calculated). At my base economics that means about 1.8 GW of new space, 6 times my base, and about $20B of building. Riot has about 2.0 GW of gross power available, which at a typical 1.3 gross-to-IT ratio would host roughly 1.5 GW of computing load (estimate).6 So at my base economics the price asks for more than Riot has power for. The way out is better terms: at the 1,000 MW of the Corsicana letter of intent, the first-year yield needed is 15.3%, against 13.0% on the signed lease and 17.7% averaged over its term (calculated).6 That is not absurd. It means the price needs the Corsicana letter to become a lease at least as rich as the one just signed, and nothing to go wrong in the building of the first.

Base value by new MW leased and first-year yield

Dollars a share, my base case otherwise unchanged.

Base value by new MW leased and first-year yield
New MW leased \ first-year NOI on cost10.0%11.5%13.0%, my base14.5%16.0%
0 MW (estimate)$1.21$1.21$1.21$1.21$1.21
300 MW, my base (estimate)$1.36$2.35$3.34$4.32$5.30
600 MW (estimate)$1.37$3.32$5.28$7.22$9.17
1,000 MW, the Corsicana letter of intent (estimate)$1.35$4.59$7.84$11.07$14.30
1,500 MW (estimate)$1.31$6.17$11.02$15.78$20.15
The price is reached at 1,000 MW and a 15.3% first-year yield, or at about 1,800 MW and 13.0%. Source Model in this page’s method [2]. All values are my estimates.

How much the answers move

More than on most pages. The table that matters is the grid above: the same company is worth about $1.2 a share if it signs nothing and about $11 a share if it signs 1,500 MW on the terms of the signed lease. Beyond that, overhead is the lever I did not expect. Each $50M a year in 2029 moves the base by about $1.0 a share, so the difference between a company that runs at $150M and one that runs at $250M is about $2 a share (estimate).

Base value by overhead

Dollars a share. Overhead is cash G&A plus stock pay in 2029; earlier years scale with it.

Base value by overhead
Overhead and stock pay in 2029$100M$150M$200M, my base$250M$300M$400M
Value per share (estimate)$5.38$4.37$3.34$2.29$1.23−$1.03
In the twelve months to June 2026 the equivalent figure was about $310M. Source Model in this page’s method; 10-Q Q2 2026 [2]. All values are my estimates.

Bitcoin matters less than its reputation. In my base, bitcoin at $150,000 with hash price rising in line is worth about $10.83 a share, and at $40,000 about $1.75. The reason is the halving: most of the mining income in my base is gone by 2029 whatever the price, so bitcoin moves the treasury, about $2.33 a share at the current price, more than it moves the mining.

Base value by bitcoin price

Dollars a share. Treasury at the stated price; hash price moves in line with bitcoin.

Base value by bitcoin price
Bitcoin price$40,000$60,000$77,180, 30 October$100,000$150,000
Value per share, with hash price moving in line (estimate)$1.75$2.52$3.34$5.41$10.83
Source Model in this page’s method [8]. All values are my estimates.

Base value by the 191 MW lease terms

Dollars a share, one term changed at a time.

Base value by the 191 MW lease terms
WorstNextNextBest
Build cost a MW: $13.5M, $12.5M, $11.5M (my base), $10.5M (estimate)$2.38$2.86$3.34$3.82
NOI margin: 75%, 80%, 85% (my base), 90% (estimate)$2.38$2.86$3.34$3.82
Exit multiple: 6, 8, 10 (my base), 12 times (estimate)$1.94$2.64$3.34$4.04
Delivery: two years late, one year late, on time (my base) (estimate)$2.85$3.12$3.34–
Each row changes one term and leaves the rest at my base. Source Model in this page’s method [2]. All values are my estimates.

The margin of safety

I set it from the bear case: the price at which my $0.06 bear value is three quarters of what is paid, so $0.08. That is not a price I expect to see. It tells you how wide the range is. In my bear the equity is worth almost nothing, because the signed leases are built late and dear and their income is then used up by overhead. In my base there is a gap of $9.47 between value and price that only a larger company would close. My bear is so close to zero that a small change in one input would push it below, so the margin-of-safety price has almost no use as a trigger. What does is the grid: at $12.81 the price is mostly a bet on the Corsicana lease, and what matters is the terms of that lease.

What it is worth, against the price

Value per share, my estimates, against the close in Q4 2026

  • Bear to bull $0.06 to $13.73
  • Base $3.34
  • Price $12.81
  • Margin of safety below $0.08
What it is worth, against the priceValue per share: bear $0.06, base $3.34, bull $13.73. Price in Q4 2026: $12.81, 284% above the base value and 7% below the bull. Margin-of-safety price $0.08.BEAR$0.06BASE$3.34BULL$13.73Price $12.81What it is worth, against the priceValue per share: bear $0.06, base $3.34, bull $13.73. Price in Q4 2026: $12.81, 284% above the base value and 7% below the bull. Margin-of-safety price $0.08.BEAR$0.06BASE$3.34BULL$13.73Price $12.81What it is worth, against the priceValue per share: bear $0.06, base $3.34, bull $13.73. Price in Q4 2026: $12.81, 284% above the base value and 7% below the bull. Margin-of-safety price $0.08.Margin-of-safety zone: below $0.08$0$5$10$15$20Bear to bull: $0.06 to $13.73Bear case: $0.06 per shareBEAR$0.06Base case: $3.34 per shareBASE$3.34Bull case: $13.73 per shareBULL$13.73Price in Q4 2026: $12.81Price $12.81Close, Q4 2026
The weighted value, 25% bear, 50% base and 25% bull, is $5.12. Source Nasdaq historical; model in this page’s method [1]. Values are my estimates.

The price against the range

The price is 284% above my base and 7% below my bull. At $12.81 my base cash flows return 5.5% a year, my bull 10.5%, and my bear −0.4% (estimate). Weighting the cases 25%, 50% and 25% gives $5.12 a share, and the price is 150% above it.

Against the alternative

Every dollar here could go somewhere else. A ten-year Treasury pays 4.94%.24 My base return here is 5.5%, a little above that, and with much more risk. The nearer comparisons are on this site. My Oracle page finds its price 7% above my base, with a customer concentration like Riot’s but a business that already pays its overhead. My Constellation Energy page finds its price 20% above my base, with power as the scarce asset. Both sit much closer to my base values than Riot does (estimate).1718 I do not have a page on the other converted bitcoin miners and I cannot say whether any of them is cheaper.

Quality and price, separately

How good is the business? Better than its record. It has found the one thing a landlord needs, power, built a team that delivered a lease on time, and signed $9.8B of rent in seven months. It is not yet good in the sense of paying its owners: the head office costs more than the leases will earn for a while, and mining covers its power and not its machines. How good is the price? Well above what I can support. A good business at the wrong price is a poor purchase, and that is what this looks like on my numbers.

How the odds multiply

The case for the price needs several things to go right together. My guesses at each are in the table. They are not independent, since a landlord that delivers on time wins the next tenant, so the true chance of all five is somewhat higher than the product. But it is nowhere near even.

How the odds multiply

My guesses, not facts.

How the odds multiply
StepMy odds
The tenant pays on time and the investment-grade backstop arrives (estimate)70%
The 191 MW is delivered by mid-2028 at or near $11.5M a MW (estimate)75%
The Corsicana letter of intent becomes a lease for about 1 GW (estimate)35%
Financing for the new MW comes at 80% or more of cost and under 7.5% (estimate)70%
Overhead falls from about $310M to $200M a year while the business grows (estimate)55%
All five together (calculated)7%
Source My estimates.

Where this could be in 5 and 10 years

My value in five and ten years

Dollars a share (estimate), same model and rates, on today’s 377.5M shares

My value in five and ten years
CaseValue per share, October 2031Value per share, October 2036Owner cash to October 2036, per shareReturn a year to October 2036
Bear (estimate)$0.00*$0.08−$4.07−39.9%
Base (estimate)$5.35$10.10−$6.60−2.3%
Bull (estimate)$21.99$39.28−$12.0211.9%

Value at a date is the present value of the owner cash after it, plus the cash or debt built up by then. It includes the signed leases to 2048, new leases, mining while it pays, overhead and tax. Owner cash is before debt, so negative means money put in. The return buys at $12.81 and sells at the 2036 value. *−$0.04 on the model, shown as zero. The returns in the valuation hold the cash to 2048; these sell at my 2036 value, which discounts later cash at 9.5% to 13%, so they are lower: the base shows 5.5% there and −2.3% here.

For the base to hold at five years, the 191 MW has to be delivered by June 2028 at about $11.5M a MW, Riot has to sign about 300 MW more by 2031 at a 13.0% first-year yield on cost, and overhead has to fall to about $200M a year (estimate). The value rises from $3.34 to $5.35 and $10.10 as the building is paid for and the rent arrives. At ten years the base also needs owner cash near $574M a year before debt.

The cases differ on the new leases. The bear signs none and builds a year late; it stays under $0.20. The bull signs about 1,000 MW and reaches $22 and $39. Three numbers drive it: megawatts signed, first-year yield on cost, and overhead. A point on the signed-lease discount rate is worth about $1 a share.

The most likely way the base is wrong is the new leases. With none, the base is $1.21 today, $1.40 at five years and $1.93 at ten, and the return from the price is −17.2% a year (estimate).

A reader’s guide: these are estimates of value, not forecasts of the share price. The price can sit above or below value for years.

The case for the price

What most people miss

Three things cut in Riot’s favour and rarely come up. First, the money for the big lease is mostly not shareholders’. The plan is $1.7B to $2.1B of project debt against a $2.1B to $2.3B build, about $180M freed by refinancing the first AMD space, and a net equity need of $30M to $280M, against $1.2B of cash and bitcoin.6 Second, AMD came back within three months: it signed 25 MW in January, took another 25 MW in April, and holds a first call on up to 100 MW more.2 Third, in 2026 Riot paid for its first buildings with bitcoin, not new shares: it sold 9,665 bitcoin for $732.5M in the half, and repaid its $200M Coinbase loan in full on 21 September at no fee.214

The bull case

In plain words: the world is short of powered buildings for AI, Riot already owns approved power at two Texas sites, and it has shown it can deliver. In under seven months it signed 241 MW for about $9.8B of rent.6 Chief executive Jason Les called the August lease “a defining moment in our evolution,” in the 10 August 2026 release.5 A letter of intent covers the whole Corsicana site, and the company lists turning it into a lease as the next priority.56 The arithmetic runs like this. At the first-year income of the signed lease, about $1.5M a MW, 1,000 MW earns about $1.5B in its first year and rises 3% a year, for about $11.5B of building.6 The property is then worth far more than it cost, because the market pays more for a leased building than the building costs.

On holders, I can check one. Situational Awareness LP, the fund of Leopold Aschenbrenner, held 17,100,000 Riot shares at 30 June 2026, worth $468.2M that day, according to its 13F-HR filed 14 August 2026.27 That is 2.3% of the $20.2B it reported and about 4.5% of the 378.0M shares Riot had at that date (calculated).2 A 13F shows long positions in US-listed stocks, not shorts or holdings elsewhere, and it is a snapshot from four months ago. I cite it as a dated fact and not as a view, and I do not know what the fund holds now. I could not open a named analyst target for Riot, so I cite none.

Against reality

Today almost none of the lease income is in the results. Data-centre revenue was $56M in the first half, and of that $51M was fit-out paid back at cost, and $5M was rent.2 The 191 MW has not been built, its financing is a bank bridge, and the credit backstop is not final. If Riot builds the 191 MW on time, the backstop arrives and permanent debt replaces the bridge, my value for the two signed leases is about $3.81 a share. That is before overhead, which takes back $4.87 (estimate). If it also converts the Corsicana letter into a lease for 1,000 MW at 15.3% first-year yield, the price is possible. That is the distance between the numbers today and the case.

What a 10x would take. Ten times $12.81 is $128, about $48B of market value on today’s shares. At 12 times net operating income, the multiple my bull uses for the leases when they end, that needs about $4B a year of NOI after overhead, ignoring the debt that would build it, which makes this too kind. At about $1.75M of NOI a MW, between the first-year and the average of the signed lease, that is about 2.3 GW of leased space (calculated). Riot has about 2.0 GW of gross power, enough for roughly 1.5 GW of computing load (estimate).6 So a tenfold move needs more space than Riot has power for, leased on the best terms it has seen, built for $25B or more, and in place by about 2036. It would be 9.3 times my bull value. For Riot from here, tenfold is close to impossible, and I would not build a case on it.

What they have to hit

Six numbers on a schedule. Thresholds come from my base case and agree with the signposts below.

What they have to hit
IndicatorTodayWhat the case needsWhere to track itNext check
191 MW deliveryBridge-funded; first 96 MW due December 20275296 MW by December 2027 and 191 MW by June 2028, rent starting (estimate)10-Q, Note 3, and the Data Center segment; 8-K on lease commencementQ3 2026 10-Q, expected 4 November 2026 per Nasdaq’s calendar28
Permanent financingUp to $573M bridge, SOFR + 2.75%; 8-K maturity 31 December 2026; amount drawn not disclosed7Project debt of 80% to 90% of $2.1B to $2.3B, under about 7.5% a year (estimate)8-K Item 1.01 or 2.03; 10-Q Note 11, DebtBy 31 December 2026, the maturity date
CorsicanaNon-binding letter of intent, one tenant56A signed lease for about 1,000 MW at a 15% first-year yield or better by the end of 2027 (estimate)8-K and the earnings presentation, “Future focus” slideQ3 2026 presentation
Overhead and stock paySelling and administrative cost $158.2M in the first half, with stock pay of $74.7M2Below $260M a year in 2027 and $200M in 2029 (estimate)10-Q income statement and cash flow statement, stock-based compensation lineQ3 2026 10-Q
Share count375.3M at 7 August 20262No more than about 400M by the end of 2028 (estimate)10-Q cover page and earnings-per-share noteQ3 2026 10-Q
Hash price$34 per PH/s a day in Q2 20266At or above $26 after the April 2028 halving (estimate)Earnings presentation, hash price lineQ3 2026 presentation
Source 10-Q Q2 2026; Q2 2026 release and presentation; 8-K 14 Aug 2026 [2][5][6][7]. Thresholds are my estimates.

Where I come down

The speed moved me: 241 MW signed in under seven months, the first space delivered on time, and the early repayment of the Coinbase loan. So did the vote on pay, which went from 31.5% to 98% after the company changed the plan.1011 What did not move me: the overhead, the bridge loan and the price. A closed backstop and permanent debt on the 191 MW would remove the risk I weigh most. A Corsicana lease on terms as good as the first would raise my values most, and it is the one the price depends on.

Risks, and what would change my view

The three ways this goes badly wrong are at the start of Valuation. These are the rest.

  • One tenant. The 191 MW lease would be the biggest source of income and its tenant is unnamed. A change in that tenant’s funding, a dispute, or a decision to build elsewhere would show up as late or lost rent, on a building that is hard to re-let.5
  • The bridge. The $573M facility funds equipment orders and matures on 31 December 2026 by the later 8-K; the earlier 10-Q says 15 October, extendable on a refinancing, and the credit agreement governs once filed. If the investment-grade backstop slips, refinancing could cost more or be refused. The facility is non-recourse to the parent, which limits the damage and also means lenders can take the project.72
  • Construction. Riot has never built 191 MW in one go. Delay, cost overruns, and shortages of electrical equipment would hit the first rent date, and every year late costs me about $0.22 a share in the base (estimate).
  • Bitcoin and the halving. Mining earns from a price Riot does not control, and the next halving, around April 2028, halves each block’s reward. Riot also holds bitcoin, so its balance sheet moves with the coin.2
  • Overhead and stock pay. The head office cost $310M over the past year. If it does not shrink as the leases arrive, owners see little of their income. The pay plan rewards relative bitcoin production and relative EBITDA, which do not pay for owner cash.10
  • Dilution. Shares rose from 25M to 375M since 2019, the plan authorises 15M more under the equity plan, and funding the next 1 GW at $11.5M a MW would cost more than twice Riot’s market value.411
  • Legal. A suit over bitcoin transactions and suits over immersion cooling are open; one claims more than $52M. I cannot size them.2
  • Custody. Riot is moving its bitcoin from NYDIG Trust to BitGo Bank & Trust, a transfer that carries operational risk, and its prior Coinbase loan shows how much of its balance sheet is one asset.2914

Geopolitical risk, and what it means for the value

Riot is a Texas business that buys machines made in Asia and earns from a coin mined in several countries. Most of these risks move my base by under a dollar a share. The tenant and the bitcoin price move it more.

Texas. All the leased and planned space sits on the ERCOT grid. Senate Bill 6 of 2025 lets the Public Utility Commission and ERCOT study, charge and curtail large loads. On 3 August 2026 Governor Abbott ordered an audit of every data-centre project in the interconnection queue, with failures denied a connection, and the 10-Q says this could delay or stop projects.2 The 191 MW goes into Rockdale, which already has about 700 MW developed, so I think it is less exposed than Corsicana, the site the price depends on.2

Tariffs and supply. Riot runs Bitmain and MicroBT machines and lists tariffs, sanctions and war as supply risks.3 A January 2026 proclamation put a 25% duty on certain advanced chips.30 I could not confirm which duties apply to finished mining machines today, so the table uses stated shocks, not a rate.

The tenant. AMD, which leases 50 MW, listed anticipated ratings of A1 and A for notes it priced in August 2026.31 The 191 MW tenant is unnamed and its credit backstop is not final, so the credit risk sits there.5

Bitcoin and the network. Regulation reaches Riot through the coin’s price, which I cannot forecast. One secondary estimate puts Russia near 16% to 17% of the network, Kazakhstan near 4% and the United States near 40%.32 A shift that raises total hash rate cuts what each machine earns. Mining is only $0.53 of my base and held bitcoin $2.33, so the coin’s price matters more than where it is mined.

What each scenario does to my base value

One change at a time, in my base model. Dollars a share (estimate).

Geopolitical scenarios
What happensMy odds, and the basisBase valueChange
New leases such as Corsicana come two years later than in my base, on Texas interconnection rulesAbout one in three: the audit covers every queued project, outcome unknown$2.89−$0.45
Mining power cost up 30% from higher transmission chargesAbout even: the commission must act by 31 December 2026$3.07−$0.27
Machines cost 50% more to replaceSome rise is likely; I cannot size it$3.19−$0.15
The 191 MW costs 10% more to build, from duties on electrical equipmentAbout one in four: Riot bought equipment ahead of tariffs$2.79−$0.55
AMD stops paying after 2029Under one in twenty: investment-grade ratings$2.87−$0.47
The 191 MW tenant pays nothing for a year from 2031, then 75% of rentAbout one in ten: unnamed tenant, backstop not final$1.37−$1.97
Bitcoin at $40,000, hash price in lineAbout one in five: it has halved before$1.75−$1.59
Network hash rate up 18%, so hash price down 15%About one in four: shares shift quickly$3.05−$0.29
Source 10-Q Q2 2026; 10-K 2025; AMD term sheet [2][3][31]. Odds are my judgement, not forecasts.

In my base already: discount rates of 9.5% to 13% and today’s hash price. Not in it: any of these rows. The price of $12.81 also leaves them out, and it needs about 1.8 GW of leases not yet signed on top. If the tenant row happened, my base would fall to $1.37 and the gap to the price would widen.

What would change my view

Signals that move my values, in either direction.

Signposts
SignalTodayRaises my valueLowers my value
Investment-grade backstop“In finalization”5Announced, with named credit support, and permanent debt closedNot in place by the bridge maturity, or a higher-rate refinancing
Delivery of the 191 MWDesign done, equipment ordered696 MW on time in December 2027 and 191 MW by June 2028More than six months late, or costs above $12.5M a MW
CorsicanaNon-binding letter5A signed lease of 1,000 MW or more at a 15% yieldTalks end or the lease is much smaller or cheaper
Overhead and stock pay$310M over twelve months2Below $200M a year while the leases deliverAbove $300M in 2028
Share count375.3M2Flat as the first 241 MW is builtAnother large share sale before the first rent
Hash price$34 a PH/s a day6Above $30 after the halvingBelow $22, the cost of mining it
Source 10-Q Q2 2026; Q2 2026 release and presentation [2][5][6]. Thresholds are my judgement.

Sources

  1. 1RIOT daily closes, Nasdaq.com historical API, 31 October 2016 to 30 October 2026 (opens in a new tab)PriceNasdaq · 30 Oct 2026 · Close/Last on 10/30/2026 = $12.81, Nasdaq Capital Market; cross-checked against the Yahoo Finance chart feed, also $12.81; 52-week range $11.50 to $30.32; next earnings date shown as 4 Nov 2026 · Accessed 31 Oct 2026↩︎
  2. 2Riot Platforms Form 10-Q, quarter ended 30 June 2026 (opens in a new tab)FilingSEC EDGAR · 10 Aug 2026 · Balance sheet, cash flows, Notes 3, 5, 8, 11, 16, 17, 18; MD&A; cover share count 375,258,935 at 7 Aug 2026 · Accessed 31 Oct 2026↩︎
  3. 3Riot Platforms Form 10-K, year ended 31 December 2025 (opens in a new tab)FilingSEC EDGAR · 2 Mar 2026 · Financial statements, cash flow statement, tax note (federal NOLs $778.3M), 2030 notes terms (conversion price about $14.86), shares outstanding · Accessed 31 Oct 2026↩︎
  4. 4Riot Platforms company facts (XBRL), SEC EDGAR (opens in a new tab)DataSEC EDGAR · 31 Oct 2026 · Annual revenue, net income, operating cash flow, capital spending, stock pay, shares outstanding and stock issuance, 2016 to 2025 · Accessed 31 Oct 2026↩︎
  5. 5Riot Platforms Q2 2026 press release (Form 8-K, Exhibit 99.1) (opens in a new tab)FilingRiot Platforms · 10 Aug 2026 · 191 MW lease, $9.1B contract revenue, NOI range $365M to $411M a year, $573M Morgan Stanley facility, liquid assets $1.2B · Accessed 31 Oct 2026↩︎
  6. 6Riot Platforms Q2 2026 earnings presentation (Form 8-K, Exhibit 99.2) (opens in a new tab)FilingRiot Platforms · 10 Aug 2026 · Illustrative capex $11.0M to $12.0M a MW, NOI margin 80% to 90%, financing slides, AMD economics, hash price, Corsicana letter of intent · Accessed 31 Oct 2026↩︎
  7. 7Riot Platforms Form 8-K on the $573M Morgan Stanley credit agreement (opens in a new tab)FilingSEC EDGAR · 14 Aug 2026 · Delayed-draw term loan of up to $573.0M, SOFR plus 2.75%, matures 31 December 2026, no recourse to Riot Platforms, Inc. beyond the credit parties · Accessed 31 Oct 2026↩︎
  8. 8Bitcoin (BTC-USD) daily candles, Coinbase Exchange API, 26 to 31 October 2026 (opens in a new tab)PriceCoinbase · 31 Oct 2026 · Daily close (UTC) for 30 October 2026: $77,180; cross-checked against Kraken’s XBT/USD daily close for the same day, $77,204. Coinbase is Riot’s principal market for valuing bitcoin · Accessed 31 Oct 2026↩︎
  9. 9Riot Platforms press release on the Rockdale land and the AMD lease (Form 8-K, Exhibit 99.1) (opens in a new tab)FilingRiot Platforms · 16 Jan 2026 · AMD lease: 25 MW, $311M over ten years, retrofit capex $89.8M ($3.6M a MW); $96.0M land purchase funded by about 1,080 bitcoin · Accessed 31 Oct 2026↩︎
  10. 10Riot Platforms definitive proxy statement (Schedule 14A) for the 2026 annual meeting (opens in a new tab)FilingSEC EDGAR · 30 Apr 2026 · Summary Compensation Table, 2025 say-on-pay 31.5%, 2026 incentive design, beneficial ownership, CFO transition · Accessed 31 Oct 2026↩︎
  11. 11Riot Platforms Form 8-K on the 2026 annual meeting results (opens in a new tab)FilingSEC EDGAR · 15 Jun 2026 · Say-on-pay for 2025 pay approved; 15,000,000 more shares added to the 2019 equity plan · Accessed 31 Oct 2026↩︎
  12. 12Riot Blockchain Form 10-K, year ended 31 December 2019 (opens in a new tab)FilingSEC EDGAR · 25 Mar 2020 · 2018 and 2019 statements · Accessed 31 Oct 2026↩︎
  13. 13Riot Platforms Form 10-K, year ended 31 December 2022 (opens in a new tab)FilingSEC EDGAR · 2 Mar 2023 · 2020 to 2022 statements as restated; cash flow statement with bitcoin sales inside operating cash flow · Accessed 31 Oct 2026↩︎
  14. 14Riot Platforms Form 8-K on prepayment of the Coinbase Credit facility (opens in a new tab)FilingSEC EDGAR · 25 Sep 2026 · $200M secured term loan repaid in full on 21 September 2026; no early termination fee · Accessed 31 Oct 2026↩︎
  15. 15Riot Platforms Form 10-K, year ended 31 December 2023 (opens in a new tab)FilingSEC EDGAR · 23 Feb 2024 · 2021 to 2023 statements; first year under the fair-value rule for bitcoin · Accessed 31 Oct 2026↩︎
  16. 16Riot Platforms Form 4, Jonathan Gibbs, 12 April 2026 (opens in a new tab)FilingSEC EDGAR · 14 Apr 2026 · 1,147,910 shares disposed of on 12 April, the date his employment ended, per the proxy · Accessed 31 Oct 2026↩︎
  17. 17My Oracle page on this site (opens in a new tab)PagePedrum Shokouhi · Q4 2026 · Oracle also builds data centres for AI labs; price 7% above my base value · Accessed 31 Oct 2026↩︎
  18. 18My Constellation Energy page on this site (opens in a new tab)PagePedrum Shokouhi · Q4 2026 · Power for data centres; price 20% above my base value · Accessed 31 Oct 2026↩︎
  19. 19My Rocket Lab page on this site (opens in a new tab)PagePedrum Shokouhi · Q4 2026 · Another capital-hungry company with a financing gap; price far above my base value · Accessed 31 Oct 2026↩︎
  20. 20Riot Platforms Form 4, Jason Les, sale of 175,000 shares on 11 May 2026 (opens in a new tab)FilingSEC EDGAR · 13 May 2026 · 175,000 shares sold at $25.19 on 11 May 2026 · Accessed 31 Oct 2026↩︎
  21. 21Riot Platforms Form 4, Jason Les, sale of 62,703 shares on 22 June 2026 (opens in a new tab)FilingSEC EDGAR · 24 Jun 2026 · 62,703 shares sold at $30.09 on 22 June 2026, the day of the 52-week high · Accessed 31 Oct 2026↩︎
  22. 22Riot Platforms Form 4, Jason Les, shares withheld for tax on 31 July 2026 (opens in a new tab)FilingSEC EDGAR · 4 Aug 2026 · 2,896,921 shares withheld by the company to cover tax on a vesting, at $20.17 · Accessed 31 Oct 2026↩︎
  23. 23Riot Platforms Form 8-K on declassifying the board (opens in a new tab)FilingSEC EDGAR · 1 Apr 2026 · Board stays in three classes until the 2029 meeting, then annual elections · Accessed 31 Oct 2026↩︎
  24. 24US Treasury daily par yield curve rates, 2026 (opens in a new tab)DataU.S. Department of the Treasury · 30 Oct 2026 · 10-year 4.94% on 10/30/2026 · Accessed 31 Oct 2026↩︎
  25. 25Damodaran implied equity risk premium, 1 October 2026 (opens in a new tab)ResearchAswath Damodaran, NYU Stern · 1 Oct 2026 · Implied ERP 4.20% (trailing 12 month, with adjusted payout); same basis as the other Investing pages · Accessed 31 Oct 2026↩︎
  26. 26RIOT and SPY weekly adjusted closes, Yahoo Finance chart API, five years to 30 October 2026 (opens in a new tab)PriceYahoo Finance · 31 Oct 2026 · Five-year weekly beta of RIOT against SPY, 260 weekly returns: 2.84 (my calculation) · Accessed 31 Oct 2026↩︎
  27. 27Situational Awareness LP Form 13F-HR information table, period 30 June 2026 (opens in a new tab)FilingSEC EDGAR · 14 Aug 2026 · RIOT PLATFORMS INC, common, CUSIP 767292105: 17,100,000 shares, value $468,198,000 at 30 June 2026. A 13F shows long US-listed holdings only, not shorts or other positions · Accessed 31 Oct 2026↩︎
  28. 28Nasdaq earnings calendar for RIOT (opens in a new tab)DataNasdaq · 31 Oct 2026 · Next earnings date shown as 4 Nov 2026, expected, not confirmed by the company in a filing · Accessed 31 Oct 2026↩︎
  29. 29Riot Platforms Form 8-K on the BitGo custody agreement (opens in a new tab)FilingSEC EDGAR · 14 Oct 2026 · Custody of digital assets moves from NYDIG Trust to BitGo Bank & Trust; one-year term, 14 days notice to end · Accessed 31 Oct 2026↩︎
  30. 30EY Global Tax News: US Section 232 proclamation imposes 25% tariff on certain semiconductors (opens in a new tab)DataEY · 9 Feb 2026 · A 25% duty on certain advanced chips; I could not confirm which duties apply to finished mining machines · Accessed 31 Oct 2026↩︎
  31. 31Advanced Micro Devices pricing term sheet (FWP) for senior notes, 13 August 2026 (opens in a new tab)FilingSEC EDGAR · 13 Aug 2026 · Anticipated ratings shown as A1 (Moody’s) and A (S&P); the rating line was read from a search extract because the filing text did not open for me · Accessed 31 Oct 2026↩︎
  32. 32Spark: Where are bitcoin’s miners moving? The 2026 hashrate geography map (opens in a new tab)DataSpark · Mid 2026 · Secondary estimate: United States 38% to 42%, Russia 16% to 17%, China 14% to 15%, Kazakhstan about 4%; the source says estimates differ by 5 to 10 points · Accessed 31 Oct 2026↩︎

How the figures are labelled

(reported)Reported: taken from a filing or a price feed, as printed.

(calculated)Calculated: arithmetic on reported figures, such as a margin or a growth rate.

(estimate)Estimate: my judgement, such as a case value or a growth assumption.

The price

Close in Q4 2026: $12.81, from Nasdaq [1]. Retrieved in Q4 2026. The fiscal year is the calendar year. Third-quarter results come after the price date, so the latest twelve months are the four quarters to 30 June 2026. Per-share values use 377.5M shares: 375.26M common at 7 August 2026, which includes about 30.3M unvested restricted shares, 2.17M restricted stock units and 0.06M warrants. The $594.4M of 2030 convertible notes are debt, since they convert at about $14.86; in any case worth more than that the model adds their 40.0M shares and removes the debt. Bitcoin is valued at the Coinbase close of $77,180 on 30 October [8].

The valuation

Discounted cash flow on owner cash, after stock pay, from 1 July 2026 to 2048, with exit values for the leases at the end. Cash under the signed leases is discounted at 9.5%, new leases at 11% and everything else at 13%, each year’s cash at year end, from the price date. The 191 MW rent is solved so that 20 years of base rent add to $9.1B with a 3% yearly step, delivered 96 MW in December 2027 and 191 MW in June 2028; NOI is 80%, 85% or 90% of rent and build cost $12.0M, $11.5M or $11.0M a MW, with a year of delay in the bear; AMD uses the rent table in the 10-Q at 88% NOI and the rest of its capex as reported. New leases start in 2029 to 2032 with a first-year NOI of 13.0% or 14.5% of a $11.5M or $11.0M cost, rising 3% a year, with maintenance spending of 0.75% to 1.5% of cost. Mining is hash price times operating hash rate times 0.365, less cost to mine, with new machines bought only when they earn at least 1.2 times their yearly depreciation, and the fleet cut by 6 EH/s in 2028 in the base, 10 in the bear and 22 by 2032 in the bull, as data halls take power. Engineering is a margin of 3%, 7% or 10% on revenue of $150M to $240M. Overhead is cash selling and administrative cost plus stock pay, falling from about $310M to $260M in 2027 and $200M in 2029 in the base. Tax is 21% after $778M of federal losses used up to 80% of income, plus 0.5% of revenue for Texas. The value is the discounted cash plus the exit values, plus cash and bitcoin at 30 June (bitcoin at 30 October’s price), less the notes at face, $54.3M of revolvers and the $200M Coinbase loan. The yearly returns are the rate that equates the price to each case’s cash. The odds in Section VI are my guesses and are not used in the values, except that the weighted value of $5.12 uses 25%, 50% and 25%. The project debt that will build the leases is not modelled: cash is before financing and discounted at the rates above.

The margin-of-safety price is $0.08, set from my bear case. No rating: the page states a range and the price, and leaves the decision to the reader.

Research, not investment advice. Figures as of .

Legal information and disclosures

These are my own views as of the update shown on this page. They can change without notice, and I have no duty to update them. Past performance does not indicate future results, and any investment can lose money.

This is for education only. It is not investment, legal, tax or accounting advice, and it is not an offer to sell or a solicitation to buy any security in any jurisdiction. It does not consider your goals or circumstances.

Figures from company filings and other third parties are believed to be reliable, but I have not independently verified them and cannot guarantee them. Bear, base and bull values, and anything marked as an estimate, are my own and rest on assumptions that may prove wrong.

Please do not copy or republish this material without my written consent.