Investing№ 83Nasdaq: CLSK

CleanSpark

CleanSpark, a bitcoin miner, signed a $6.6B Meta-guaranteed lease for 175 MW of AI data center, but the lease cash goes first to $2.3B of notes and the price needs about 1,170 MW more.

Updated Fiscal year ends 30 September29 min readPedrum Shokouhi

Can be disrupted

Research, not investment advice. Figures as of .

Key numbers

  • Revenue$679M (calculated)TTM Jun 2026; down 11% on FY2025 [2][3]
  • Owner cash flow−$82M (calculated)TTM Jun 2026, bitcoin counted as cash, after stock pay; net loss $998M [2][3]
  • Sandersville lease$6.6B (reported)175 MW, 20 years, Meta subsidiary as tenant, Meta guarantee; rent from Nov 2027 [4][5]
  • Project notes$2.276B (reported)7.875% senior secured notes due 2031, issued 25 Sep 2026 at 98.5 [6][7]
  • Bitcoin held13,924 (reported)Coins incl. collateral at 30 Jun 2026, $815M then; about $1.07B at today’s price [8][9]
  • Convertible notes$1.8B (reported)Zero coupon; $650M put in June 2028, $1,150M due Feb 2032 [3]

The answer

  1. CleanSpark has been a bitcoin miner and is turning into a landlord: in July it signed a 20-year, $6.6B lease with a Meta subsidiary for a 175 MW AI data center in Georgia, while in the twelve months to June 2026 it took in $679M of revenue, lost $998M mostly on bitcoin it holds, and paid out $82M more than it earned after stock pay (calculated).4532
  2. I value it at $3 a share, in a range of $0 to $14, because the new lease leaves little for shareholders for fifteen years after its own $2.276B of notes, mining loses money once the miners wear out and the 2028 halving arrives, and the big prize, 885 MW in Texas, is a letter of intent and not yet a contract (estimate).6310
  3. At $7.67 the price is 193% above my base value and 45% below my bull; to justify it CleanSpark would have to build and lease about 1,170 MW on Sandersville’s terms, more than the whole Texas block, and my margin-of-safety price is $1 (estimate).14

Six questions, one line each

Why
AI buyers need power and land fast, CleanSpark controls about 1.8 GW of contracted power, and one 175 MW site is already leased to Meta’s subsidiary for 20 years.43 →
The moat
Thin: mining is a commodity where it holds 4.4% of the network, and the scarce thing, connected power, is also being sold by every other miner that has pivoted.311 →
The advantage
Power already contracted at about 5.3 cents a kilowatt-hour, a signed tenant guaranteed by Meta, and a bitcoin treasury of 13,924 coins that can fund the equity for the next sites.35 →
Management
The chairman and CEO was paid $44.9M for the year to September 2025 and held 1.2% of the shares in September 2026; new share awards pay out on megawatts signed, not on cash per share.12133 →
Margin of safety
Below $1, where the Texas option costs nothing and the bear value is zero; the stock is 8 times that now (estimate).1 →
The price
$7.67 at the close in Q4 2026, 49% below its September high of $15.14, 193% above my base value and about 2.1B of market value on 279M shares and awards (calculated).13 →

The business

CleanSpark is a Nevada company, run from Henderson, that until this year did one thing: it mined bitcoin. It owns and runs data centers in Georgia, Tennessee, Mississippi and Wyoming, fills them with machines that guess numbers for the bitcoin network, and gets paid in bitcoin by a mining pool.3 Its fiscal year ends on 30 September. At 30 June 2026 it owned about 326,530 machines, 225,137 of them running, with an average age of 23 months. The machines it runs produced 42.6 exahashes a second in June, 4.36% of the network.3 The pool operator, Foundry Digital, is its only customer and can end the contract at any time.3

It calls itself a data center developer now. At 30 June it had about 1,817 MW of contracted power capacity, up from about 1,027 MW nine months earlier, because it bought land and power rights in Texas.32 A megawatt is the unit that matters in this business. A modern AI data center uses a lot of power in a small space, and electricity connected to the grid is the scarce input. Machines can be bought. Grid connections take years.

The old business, in numbers

In the nine months to June 2026 CleanSpark mined 5,545 bitcoin at its own sites and booked $455.6M of revenue, which is the bitcoin valued on the day it was mined.3 In the June quarter a bitcoin sold, on that basis, for an average of $71,692. Energy cost $44,406 a coin, 61.8% of revenue. Depreciation of the machines added $51,871, so the all-in cost of $96,277 was 134% of revenue (calculated).3 A year earlier the same quarter showed revenue of $98,753 a coin and an all-in cost of $86,428. The business made money then and does not now.

What a bitcoin sells for, and what it costs to mine

US$ thousands per bitcoin mined, owned sites, quarter to 30 June

  • Revenue, Q3 FY26 $71.7k
  • Energy $44.4k
  • Miner depreciation $51.9k
What a bitcoin sells for, and what it costs to minePer bitcoin mined at owned sites, quarter to 30 June. Revenue per bitcoin fell from $98,753 to $71,692. Direct energy cost was about $44,400 in both. Miner depreciation rose from $41,601 to $51,871, so the all-in cost, $96,277, was 134% of revenue.$0k$25k$50k$75k$100kQ3 FY25Q3 FY26Revenue per bitcoin, Q3 FY25: $98,753Revenue per bitcoin, Q3 FY26: $71,692Energy, Q3 FY25: $44,806Energy, Q3 FY26: $44,406Miner depreciation, Q3 FY25: $41,601Miner depreciation, Q3 FY26: $51,871What a bitcoin sells for, and what it costs to minePer bitcoin mined at owned sites, quarter to 30 June. Revenue per bitcoin fell from $98,753 to $71,692. Direct energy cost was about $44,400 in both. Miner depreciation rose from $41,601 to $51,871, so the all-in cost, $96,277, was 134% of revenue.$0k$25k$50k$75k$100kQ3 FY25Q3 FY26Revenue per bitcoin, Q3 FY25: $98,753Revenue per bitcoin, Q3 FY26: $71,692Energy, Q3 FY25: $44,806Energy, Q3 FY26: $44,406Miner depreciation, Q3 FY25: $41,601Miner depreciation, Q3 FY26: $51,871What a bitcoin sells for, and what it costs to minePer bitcoin mined at owned sites, quarter to 30 June. Revenue per bitcoin fell from $98,753 to $71,692. Direct energy cost was about $44,400 in both. Miner depreciation rose from $41,601 to $51,871, so the all-in cost, $96,277, was 134% of revenue.$0k$25k$50k$75k$100kQ3 FY25Q3 FY26Revenue per bitcoin, Q3 FY25: $98,753Revenue per bitcoin, Q3 FY26: $71,692Energy, Q3 FY25: $44,806Energy, Q3 FY26: $44,406Miner depreciation, Q3 FY25: $41,601Miner depreciation, Q3 FY26: $51,871
Energy alone was 61.8% of revenue in the quarter (45.3% a year earlier). Counting depreciation, mining lost about $24,600 on each bitcoin. Source 10-Q June 2026, MD&A cost of mining table [3]. Figures as reported.
Show the numbers
What a bitcoin sells for, and what it costs to mine
Q3 FY25Q3 FY26
Revenue per bitcoin (reported)$98,753$71,692
Energy cost per bitcoin (reported)$44,806$44,406
Miner depreciation per bitcoin (reported)$41,601$51,871
All-in direct cost (reported)$86,428$96,277
All-in cost as % of revenue (reported)87.5%134.3%

Two facts matter for what comes next. First, the machines wear out. The company depreciates them over three years, and the average age is nearly two.3 Depreciation of $333M in nine months is what the fleet costs to replace, and the company bought almost none: miner purchases were $32M in the nine months against $382M a year earlier.3 Second, the next halving, in about April 2028, cuts the bitcoin paid per block from 3.125 to 1.5625. Unless the price doubles, revenue per machine halves while the power bill stays the same (estimate).

The new business: Sandersville

On 10 July 2026 CleanSpark signed a lease for 175 MW of critical IT load at a new campus next to its Sandersville, Georgia site. The term is 20 years, with two five-year extensions for the tenant and a further 12-month option. It is triple net: the tenant pays all costs of operating the building. Rent escalates 3.0% a year.105 The company says it is worth about $6.6B over the initial term, $11.6B with both extensions, and about $330M a year of net operating income on average, close to 100% of rent.4 In September it named the tenant: Anviran, LLC, a wholly owned subsidiary of Meta, with Meta guaranteeing rent and operating expenses.5 Rent is to start on 30 November 2027, after the first network hall is built.5

That is a strong counterparty. Meta had $117B of revenue in the first half of 2026 and a market value of about $1.7 trillion, according to CleanSpark’s own presentation.5 The risk in this lease is not whether Meta pays. It is whether CleanSpark builds on time. The lease sets financing, construction and delivery milestones, and failing them “may result in rent abatements or termination.”10 A third party leads the construction, equipment is on long lead times, and CleanSpark has given the noteholders a completion guarantee: if the money runs out, CleanSpark has to put in more.37

The company puts the cost at $10M to $12M a megawatt, and its September presentation says about $11.9M, or about $2.08B for the 175 MW (calculated).45 To pay for it, a subsidiary, CSDC Finance I, sold $2.276B of 7.875% senior secured notes due October 2031 at 98.5% of face on 25 September, for about $2.24B before costs.67 The proceeds finish the build, repay CleanSpark’s own earlier contributions and fund reserves. The principal amortizes from rent income, so the notes are paid down from the lease, not at maturity.7 I read this as a project financed almost entirely with debt, secured on the lease. That is why the next table matters.

Sandersville: rent, debt service and what is left

US$ millions a year, calendar years. NOI from the company’s presentation; debt service on $2.276B at 7.875%; tax is my estimate

  • NOI, 2029 $254M
  • Debt service, 2029 $217M
  • Left for CleanSpark, 2029 $37M
Sandersville: rent, debt service and what is leftIllustrative annual figures for the Sandersville lease in my model, calendar years 2028 to 2047, $ millions. Net operating income rises from $220M in 2028 to $420M in 2046. Debt service takes most of it until 2043. Cash left for CleanSpark after debt service and tax is $24M to $66M a year to 2042, then $176M to $332M.$0$100M$200M$300M$400M’28’30’32’34’36’38’40’42’44’46Net operating income, 2028: $220MNet operating income, 2029: $254MNet operating income, 2030: $262MNet operating income, 2031: $269MNet operating income, 2032: $278MNet operating income, 2033: $286MNet operating income, 2034: $294MNet operating income, 2035: $303MNet operating income, 2036: $312MNet operating income, 2037: $322MNet operating income, 2038: $331MNet operating income, 2039: $341MNet operating income, 2040: $352MNet operating income, 2041: $362MNet operating income, 2042: $373MNet operating income, 2043: $384MNet operating income, 2044: $396MNet operating income, 2045: $408MNet operating income, 2046: $420MNet operating income, 2047: $395MDebt service, 2028: $154MDebt service, 2029: $217MDebt service, 2030: $223MDebt service, 2031: $230MDebt service, 2032: $236MDebt service, 2033: $243MDebt service, 2034: $251MDebt service, 2035: $257MDebt service, 2036: $270MDebt service, 2037: $275MDebt service, 2038: $274MDebt service, 2039: $287MDebt service, 2040: $297MDebt service, 2041: $305MDebt service, 2042: $313MDebt service, 2043: $322MDebt service, 2044: $139MDebt service, 2045: $0MDebt service, 2046: $0MDebt service, 2047: $0MLeft for CleanSpark, 2028: $66MLeft for CleanSpark, 2029: $37MLeft for CleanSpark, 2030: $38MLeft for CleanSpark, 2031: $40MLeft for CleanSpark, 2032: $41MLeft for CleanSpark, 2033: $43MLeft for CleanSpark, 2034: $44MLeft for CleanSpark, 2035: $43MLeft for CleanSpark, 2036: $36MLeft for CleanSpark, 2037: $36MLeft for CleanSpark, 2038: $43MLeft for CleanSpark, 2039: $35MLeft for CleanSpark, 2040: $30MLeft for CleanSpark, 2041: $27MLeft for CleanSpark, 2042: $24MLeft for CleanSpark, 2043: −$12MLeft for CleanSpark, 2044: $176MLeft for CleanSpark, 2045: $322MLeft for CleanSpark, 2046: $332MLeft for CleanSpark, 2047: $312MSandersville: rent, debt service and what is leftIllustrative annual figures for the Sandersville lease in my model, calendar years 2028 to 2047, $ millions. Net operating income rises from $220M in 2028 to $420M in 2046. Debt service takes most of it until 2043. Cash left for CleanSpark after debt service and tax is $24M to $66M a year to 2042, then $176M to $332M.$0$100M$200M$300M$400M’28’29’30’31’32’33’34’35’36’37’38’39’40’41’42’43’44’45’46’47Net operating income, 2028: $220MNet operating income, 2029: $254MNet operating income, 2030: $262MNet operating income, 2031: $269MNet operating income, 2032: $278MNet operating income, 2033: $286MNet operating income, 2034: $294MNet operating income, 2035: $303MNet operating income, 2036: $312MNet operating income, 2037: $322MNet operating income, 2038: $331MNet operating income, 2039: $341MNet operating income, 2040: $352MNet operating income, 2041: $362MNet operating income, 2042: $373MNet operating income, 2043: $384MNet operating income, 2044: $396MNet operating income, 2045: $408MNet operating income, 2046: $420MNet operating income, 2047: $395MDebt service, 2028: $154MDebt service, 2029: $217MDebt service, 2030: $223MDebt service, 2031: $230MDebt service, 2032: $236MDebt service, 2033: $243MDebt service, 2034: $251MDebt service, 2035: $257MDebt service, 2036: $270MDebt service, 2037: $275MDebt service, 2038: $274MDebt service, 2039: $287MDebt service, 2040: $297MDebt service, 2041: $305MDebt service, 2042: $313MDebt service, 2043: $322MDebt service, 2044: $139MDebt service, 2045: $0MDebt service, 2046: $0MDebt service, 2047: $0MLeft for CleanSpark, 2028: $66MLeft for CleanSpark, 2029: $37MLeft for CleanSpark, 2030: $38MLeft for CleanSpark, 2031: $40MLeft for CleanSpark, 2032: $41MLeft for CleanSpark, 2033: $43MLeft for CleanSpark, 2034: $44MLeft for CleanSpark, 2035: $43MLeft for CleanSpark, 2036: $36MLeft for CleanSpark, 2037: $36MLeft for CleanSpark, 2038: $43MLeft for CleanSpark, 2039: $35MLeft for CleanSpark, 2040: $30MLeft for CleanSpark, 2041: $27MLeft for CleanSpark, 2042: $24MLeft for CleanSpark, 2043: −$12MLeft for CleanSpark, 2044: $176MLeft for CleanSpark, 2045: $322MLeft for CleanSpark, 2046: $332MLeft for CleanSpark, 2047: $312MSandersville: rent, debt service and what is leftIllustrative annual figures for the Sandersville lease in my model, calendar years 2028 to 2047, $ millions. Net operating income rises from $220M in 2028 to $420M in 2046. Debt service takes most of it until 2043. Cash left for CleanSpark after debt service and tax is $24M to $66M a year to 2042, then $176M to $332M.$0$100M$200M$300M$400M’28’29’30’31’32’33’34’35’36’37’38’39’40’41’42’43’44’45’46’47Net operating income, 2028: $220MNet operating income, 2029: $254MNet operating income, 2030: $262MNet operating income, 2031: $269MNet operating income, 2032: $278MNet operating income, 2033: $286MNet operating income, 2034: $294MNet operating income, 2035: $303MNet operating income, 2036: $312MNet operating income, 2037: $322MNet operating income, 2038: $331MNet operating income, 2039: $341MNet operating income, 2040: $352MNet operating income, 2041: $362MNet operating income, 2042: $373MNet operating income, 2043: $384MNet operating income, 2044: $396MNet operating income, 2045: $408MNet operating income, 2046: $420MNet operating income, 2047: $395MDebt service, 2028: $154MDebt service, 2029: $217MDebt service, 2030: $223MDebt service, 2031: $230MDebt service, 2032: $236MDebt service, 2033: $243MDebt service, 2034: $251MDebt service, 2035: $257MDebt service, 2036: $270MDebt service, 2037: $275MDebt service, 2038: $274MDebt service, 2039: $287MDebt service, 2040: $297MDebt service, 2041: $305MDebt service, 2042: $313MDebt service, 2043: $322MDebt service, 2044: $139MDebt service, 2045: $0MDebt service, 2046: $0MDebt service, 2047: $0MLeft for CleanSpark, 2028: $66MLeft for CleanSpark, 2029: $37MLeft for CleanSpark, 2030: $38MLeft for CleanSpark, 2031: $40MLeft for CleanSpark, 2032: $41MLeft for CleanSpark, 2033: $43MLeft for CleanSpark, 2034: $44MLeft for CleanSpark, 2035: $43MLeft for CleanSpark, 2036: $36MLeft for CleanSpark, 2037: $36MLeft for CleanSpark, 2038: $43MLeft for CleanSpark, 2039: $35MLeft for CleanSpark, 2040: $30MLeft for CleanSpark, 2041: $27MLeft for CleanSpark, 2042: $24MLeft for CleanSpark, 2043: −$12MLeft for CleanSpark, 2044: $176MLeft for CleanSpark, 2045: $322MLeft for CleanSpark, 2046: $332MLeft for CleanSpark, 2047: $312M
The lease pays CleanSpark about $6.6B over 20 years, but the notes take most of it for the first 15. The company’s own table shows $2.69B left after debt service, before tax, over the whole life. Source Investor presentation, 17 Sep 2026; 8-Ks of 18 and 25 Sep 2026 [5][6][7]. Net operating income as presented; debt service and tax are my calculations.
Show the numbers
Sandersville: rent, debt service and what is left
20282029203020312032203320342035203620372038203920402041204220432044204520462047
Net operating income (estimate)$220M$254M$262M$269M$278M$286M$294M$303M$312M$322M$331M$341M$352M$362M$373M$384M$396M$408M$420M$395M
Interest (estimate)$131M$177M$174M$170M$166M$160M$154M$146M$137M$127M$115M$103M$88M$72M$53M$33M$10M$0M$0M$0M
Principal (estimate)$24M$40M$49M$59M$71M$83M$97M$111M$133M$148M$158M$184M$208M$233M$260M$289M$129M$0M$0M$0M
Tax (estimate)$0M$0M$0M$0M$0M$0M$0M$2M$6M$10M$15M$20M$25M$30M$37M$74M$81M$86M$88M$83M
Left for CleanSpark (estimate)$66M$37M$38M$40M$41M$43M$44M$43M$36M$36M$43M$35M$30M$27M$24M−$12M$176M$322M$332M$312M

The company’s own table in the September presentation shows $2.69B left over the life of the lease after debt service, before tax.5 But it arrives late. Using the same net operating income and the actual 7.875% coupon, I get $24M to $66M a year for CleanSpark through 2042, then $176M to $332M a year from 2044 once the notes are repaid (estimate). Meta’s rent is safe. CleanSpark’s share of it is small for fifteen years.

Texas and the rest

With the lease, the tenant signed a letter of intent and exclusivity covering CleanSpark’s whole Texas portfolio: 718 acres and up to 885 MW of “secured and planned” power. That is about 271 acres and nearly 300 MW at Sealy and 447 acres at Brazoria, where transmission supports an initial 300 MW of demand that could grow to 600 MW.4 A letter of intent is not a lease. It sets no rent, no date and no price. The company paid about $65.7M for the Austin County land and option, including 1,788,834 shares, and $38.2M for Brazoria, so CleanSpark has little invested in the land compared with the value it implies.3 The rest of the 1.8 GW sits in Georgia, Tennessee, Mississippi and Wyoming, where today it runs miners.3

The bitcoin on the balance sheet

At 30 June CleanSpark held 12,205 bitcoin, and 1,719 more were lent out as collateral, 13,924 in all, worth $814.9M at the June price of about $58,500.38 At $77,200 on 30 October that would be about $1.07B (calculated).9 The cost was $90,188 a coin, so the company is underwater on its holding, and it posts the swings in its income statement: a $587M loss in nine months.3 It sells covered calls and puts against the holding and booked $25.8M of premiums in nine months.3 I do not know what it holds today. The next count is in the annual report, due in late November.

The notes it owes

CleanSpark owes $1.8B in zero-coupon convertible notes: $650M due June 2030, which holders can make it repay in June 2028, convertible at $14.80, and $1,150M due February 2032, convertible at $19.16.3 It raised each by selling the notes and using part of the money to buy back shares: $145M in December 2024 and $460M in November 2025.3 With the shares at $7.67, neither conversion price is near, so I treat the notes as debt. Separately, the Sandersville notes belong to the project and are secured on it. I treat them there.

The moat

I ask two questions. Can a rival take the customer at the same price, and would the customer want to move? CleanSpark has two different answers, one for each business.

Mining has none

Bitcoin mining sells a commodity at a price the miner cannot set. The business is a race on power cost and machine efficiency. CleanSpark is good at it: its fleet runs at 15.8 joules per terahash and it pays about $0.053 a kilowatt-hour.3 But its share of the network fell from 5.14% to 4.36% in a year, from 45.3 to 42.6 exahashes a second, as it stopped buying machines.3 Efficiency is available to anyone who buys the next machine, and the halving takes the margin from everyone. The whole network ran at about 1,006 exahashes a second in late October, so 42.6 would be about 4.2% of it.14 Whatever edge it had does not show in the June quarter: all-in cost was 134% of revenue.

Power is the scarce thing

What is hard to copy now is connected power near a grid that will give it. The 10-Q says the company controls about 1,817 MW. Sandersville is an example: rent is to start about 13 months after today.5 That is worth something, and the price is visible. Hut 8 signed 245 MW at River Bend with Fluidstack for $7.0B over 15 years, backstopped by Google, which is about $1.9M a MW-year. CleanSpark’s lease is $6.6B over 20 years for 175 MW, also about $1.9M a MW-year (calculated).114 Cipher’s Amazon lease, as announced in its 8-K, is about $5.5B over 15 years for 300 MW, about $1.2M a MW-year on a gross-capacity basis, which is not the same measure.15 I read this as a market with several sellers and a similar price.

What protects the lease

Once signed, a 20-year triple-net lease with Meta behind it is a strong asset. The tenant has put its own equipment in a purpose-built building; moving costs a lot. If CleanSpark builds on time, the cash is contracted to 2047. That is the moat, and it is narrow: it covers 175 MW out of 1,817.

Evidence it is narrowing

Hut 8 and Cipher each announced a lease of this kind in the past year, so the supply of powered land for AI is growing.1115 A moat is something a competitor cannot match. Here the competitors are matching it with the same pitch. The test is Texas: whether the tenant chooses to sign 885 MW of it, on what rent, in what time.

The competitive advantage

What CleanSpark has is speed and an early start. It owned land, power rights and a skilled crew before the AI buyers came looking. In July its chief executive said the company had always believed in a “second-mover advantage”: grow the portfolio as the market matures, then execute on excellent terms.4 I take that as a fair description. The lease terms look no worse than Hut 8’s.

Three real things

First, power cost and quantity: about 5.3 cents a kilowatt-hour across its sites, and about 1.8 GW contracted.3 Second, a hyperscaler with a guarantee: Meta stands behind rent and operating costs.5 Third, a treasury that can fund equity. At the 30 October bitcoin price the 13,924 coins are worth about half the company’s market value (calculated).91 Developers that lack that have to issue shares to build.

Against the alternatives

The table puts the price of CleanSpark’s power next to what the market pays for similar leases. It is what the buyer pays for the power, building and the tenant’s credit, not what the stock is worth.

Three leases, one price band

Contract value per megawatt of IT capacity per year. Each company’s own measure of capacity and term.

Lease comparison
CleanSpark, SandersvilleHut 8, River BendCipher, Amazon
Tenant (reported)Meta subsidiary, Meta guaranteeFluidstack, Google backstopAWS
Capacity (reported)175 MW critical IT245 MW IT300 MW gross
Term (reported)20 years, two 5-year options15 years15 years
Contract value (reported)$6.6B$7.0BAbout $5.5B
Per MW-year (calculated)$1.9M$1.9M$1.2M
Average NOI (reported)About $330M a year$454M a yearNot shown
Hut 8 and Cipher figures are from their 8-K exhibits; Cipher’s capacity is gross, not critical IT, so the last column is not like for like. Source Sandersville lease release; Hut 8 and Cipher 8-Ks [4][11][15]

The lesson: CleanSpark is not getting a better price than peers. It is getting similar terms and, in the guarantee, similar credit. Its edge is in how soon it can build and how little equity it must put in. Both have to be proved by delivering rent in November 2027.

Management

S. Matthew Schultz is chairman and chief executive. Gary Vecchiarelli is president and chief financial officer. Zachary Bradford, who ran the company through its mining years, left as CEO on 10 August 2025.12 The same people signed the lease, raised the notes and ran the buybacks, so I follow what they are paid to do.

How they are paid

Schultz’s pay for the year to September 2025 was $44.9M: $0.86M in salary, $5.5M in bonus and $37.1M in stock awards. The median employee earned $91,263.12 Each executive also gets bitcoin every month, 1.2 BTC for Schultz, which stops if the company stops mining.12 That is a small point today and a large one later: the company plans to end mining at Sandersville in fiscal 2028.3

In March 2026 the board made two new grants. The 2026 long-term plan gave 5,411,148 awards to 22 leaders, 40% time-based units and 60% performance units. Half the performance units pay on megawatts under executed AI leases by 20 March 2027: nothing below 600 MW, half at 700 MW, all at 800 MW or more. The other half pay if the 20-day average share price reaches twice $9.40.3 Then a one-time award of 7,698,000 units went to three executives. Half pay on AI capacity ready for service by 30 September 2030, from 25% at 1.0 GW to 100% at 2.5 GW. The other half pay only if the shares reach five times $9.40, $47.00, with full payout at $94.3 The company expects half, 3,849,000 units, not to vest.3

What does that pay them to do? To sign and energize megawatts, quickly, and for the highest paid, to make the share price much higher than today’s. It does not pay for cash left to shareholders per share. Sandersville is a lease whose notes take most of the cash for 15 years. It counts toward the 800 MW target in full (estimate). I do not say the board is wrong to want leases. I say the pay rewards the thing that is easiest to do and does not penalize the thing that matters, the return on each dollar.

What they own, and what they have done with it

At 9 September 2026 Schultz held 3,039,089 shares, about 1.2% of the common stock and $23M at $7.67.13 At January 2026 all current directors and officers together held 2.08%.12 The Forms 4 I read from October 2025 to October 2026 show share awards, tax withholding and sell-to-cover sales. They show one director sale, 85,315 shares at $11.69 on 23 December 2025. I found no open-market purchase by any insider.13 Insiders have chosen not to add to their holdings as the price fell from $23.20 in mid-October 2025.1

One more fact about control. The 1,750,000 Series A preferred shares carry 45 votes each, 78.75M votes, about 23.5% of the vote at the record date, and are held by Schultz, a director (Larry McNeill), their company and Bradford.1612 Until March the preferred earned a quarterly dividend of 2% of earnings before interest, tax and amortization. Schultz received $3.07M of it in fiscal 2025.12 On 20 March 2026 the board, without the two interested directors, ended that dividend in return for a one-time payment of $17.14 a share, $30.0M in all, paid on about 24 March.173 The preferred still votes with the majority of its own holders.17

What they did with capital

Since 2021 the company has raised about $2.2B from selling shares, $271M, $125M, $376M, $1.23B and $187M in fiscal 2021 to 2025, and about $1.66B of it has gone into new miners.18219 Weighted shares went from 102.7M in fiscal 2023 to 282.2M in fiscal 2025.2 In fiscal 2024 it wrote off $197M of fixed assets.220 Then it sold zero-coupon convertible notes twice and used part of the proceeds to buy back stock: 11.76M shares for $145M in December 2024, about $12.33 a share, and 30.6M for $460M in November 2025, about $15.03.3 That is $605M for 42.4M shares worth about $325M at $7.67 (calculated). The buybacks were funded by borrowed money that does not have to be repaid until 2028 and 2032, and by the sale of convertibles that now sit far out of the money.

My read: this is a management that raises capital easily and spends it quickly. The test of the new plan is a different one, whether it earns more than its cost on each lease. The Sandersville structure suggests it may: it put in little equity, kept a long contract and got a guarantor. The pay plan suggests it will be paid for more of the same whether or not it does.

Financials

CleanSpark began mining bitcoin in December 2020. Before that it sold energy software and microgrids, with revenue of $10M in fiscal 2020 and less before.19 So there are six full fiscal years and the twelve months to June 2026, not ten, and only the last five are the mining company. Revenue rose from $39M in fiscal 2021 to $766M in fiscal 2025, then fell to $679M over the twelve months to June 2026 (calculated).1823

Revenue and net income

Fiscal years to 30 September, US$ millions

  • Revenue, TTM $679M
  • Net income, TTM −$998M
Revenue and net incomeRevenue and net income by fiscal year to September, FY2020 to FY2025, and the twelve months to June 2026. Revenue rose from $10M to $766M in FY2025 and $679M over the twelve months. Net income was a $364M gain in FY2025 and a $998M loss over the twelve months, driven by bitcoin marked to market.−$1B−$500M$0$500M$1BFY20FY22FY24TTMRevenue, FY20: $10MRevenue, FY21: $39MRevenue, FY22: $132MRevenue, FY23: $168MRevenue, FY24: $379MRevenue, FY25: $766MRevenue, TTM: $679MNet income, FY20: −$23MNet income, FY21: −$22MNet income, FY22: −$57MNet income, FY23: −$138MNet income, FY24: −$146MNet income, FY25: $364MNet income, TTM: −$998MRevenue and net incomeRevenue and net income by fiscal year to September, FY2020 to FY2025, and the twelve months to June 2026. Revenue rose from $10M to $766M in FY2025 and $679M over the twelve months. Net income was a $364M gain in FY2025 and a $998M loss over the twelve months, driven by bitcoin marked to market.−$1B−$500M$0$500M$1BFY20FY21FY22FY23FY24FY25TTMRevenue, FY20: $10MRevenue, FY21: $39MRevenue, FY22: $132MRevenue, FY23: $168MRevenue, FY24: $379MRevenue, FY25: $766MRevenue, TTM: $679MNet income, FY20: −$23MNet income, FY21: −$22MNet income, FY22: −$57MNet income, FY23: −$138MNet income, FY24: −$146MNet income, FY25: $364MNet income, TTM: −$998MRevenue and net incomeRevenue and net income by fiscal year to September, FY2020 to FY2025, and the twelve months to June 2026. Revenue rose from $10M to $766M in FY2025 and $679M over the twelve months. Net income was a $364M gain in FY2025 and a $998M loss over the twelve months, driven by bitcoin marked to market.−$1B−$500M$0$500M$1BFY20FY21FY22FY23FY24FY25TTMRevenue, FY20: $10MRevenue, FY21: $39MRevenue, FY22: $132MRevenue, FY23: $168MRevenue, FY24: $379MRevenue, FY25: $766MRevenue, TTM: $679MNet income, FY20: −$23MNet income, FY21: −$22MNet income, FY22: −$57MNet income, FY23: −$138MNet income, FY24: −$146MNet income, FY25: $364MNet income, TTM: −$998M
TTM is the four quarters to 30 June 2026. FY2025 net income of $364M includes a $426M gain from marking bitcoin up; the twelve months to June include a $587M mark-down in the first nine months of FY2026. Source 10-K FY2025; 10-K FY2022; 10-Q June 2026; SEC XBRL [2][18][3][19]. Figures as reported or calculated from reported data.
Show the numbers
Revenue and net income
FY2020FY2021FY2022FY2023FY2024FY2025TTM Jun 2026
Revenue (reported)$10M$39M$132M$168M$379M$766M$679M
Net income (reported)−$23M−$22M−$57M−$138M−$146M$364M−$998M

Quality of earnings

Net income is a poor guide here. In fiscal 2025 the company reported $364M of net income. It included a $425.6M gain from valuing bitcoin at its year-end price and a $92.2M gain on bitcoin lent out as collateral.2 Take the first out and operating income was about −$107M (calculated). In the nine months to June 2026 the same two items were losses of $587.2M and $159.0M.3 Without the first one, the operating loss was $307M against $41M a year earlier (calculated).3 So the earnings are the price of bitcoin, with a business under them that was losing more.

CleanSpark, six fiscal years and the latest twelve months

Fiscal years to 30 September, US dollars. TTM is the four quarters to 30 June 2026. Owner cash flow is operating cash flow, with mined bitcoin counted as cash, less capital spending on miners and equipment, less stock pay. FY2020 is mostly the former energy business.

Financial summary by year
FY2020FY2021FY2022FY2023FY2024FY2025TTM Jun 2026
Revenue (reported)$10M$39M$132M$168M$379M$766M$679M
Net income (reported)−$23M−$22M−$57M−$138M−$146M$364M−$998M
Stock pay (reported)$2M$8M$32M$24M$30M$45M$73M
Depreciation (reported)n/a$9M$49M$121M$155M$348M$442M
Capital spending (calculated)n/a$228M$190M$301M$806M$563M$160M
Owner cash flow (calculated)n/a−$222M−$146M−$290M−$691M−$303M−$83M
Weighted shares, basic (reported)n/an/an/a103M217M282M273M
Source 10-K FY2025; 10-K FY2022; 10-Q June 2026; SEC XBRL [2][18][3][19]. Figures as reported or calculated from reported data.

What an owner could really take out

Nothing so far. Over the twelve months to June 2026, operating cash flow was −$529M, because mined bitcoin is not cash until sold. Counting the bitcoin as cash gives +$151M. Capital spending was $160M and stock pay $73M, so owner cash flow was −$82M (calculated).23 Over fiscal 2021 to 2025 the total was −$1.65B (calculated). The reported net income in those five years added up to about +$2M, a gap of $1.65B between the accounts and the cash an owner put in.

How much of the capital spending is needed just to stand still? Depreciation was $442M over the twelve months, and $333M of it in nine months was on miners.3 If the fleet were to be kept at the June size, the cost would be near that, not $160M. At that spending owner cash would be about −$365M (estimate). This is why I do not value the mining business as a going concern. It is a fleet running down.

What an owner put in after each year

US$ millions. Owner cash flow = operating cash flow + bitcoin mined (counted as cash) − capital spending − stock pay

  • Owner cash flow, TTM −$82M
  • Capital spending, TTM $160M
What an owner put in after each yearOwner cash flow by fiscal year: operating cash flow with mined bitcoin counted as cash, less capital spending on miners and equipment, less stock pay. FY2021 to FY2025 were each negative, from −$146M to −$691M. The twelve months to June 2026 were −$82M, after capital spending fell to $160M.−$800M−$600M−$400M−$200M$0FY21FY22FY23FY24FY25TTMOwner cash flow, FY21: −$222MOwner cash flow, FY22: −$146MOwner cash flow, FY23: −$290MOwner cash flow, FY24: −$691MOwner cash flow, FY25: −$303MOwner cash flow, TTM: −$83MCapital spending, FY21: −$228MCapital spending, FY22: −$190MCapital spending, FY23: −$301MCapital spending, FY24: −$806MCapital spending, FY25: −$563MCapital spending, TTM: −$160MWhat an owner put in after each yearOwner cash flow by fiscal year: operating cash flow with mined bitcoin counted as cash, less capital spending on miners and equipment, less stock pay. FY2021 to FY2025 were each negative, from −$146M to −$691M. The twelve months to June 2026 were −$82M, after capital spending fell to $160M.−$800M−$600M−$400M−$200M$0FY21FY22FY23FY24FY25TTMOwner cash flow, FY21: −$222MOwner cash flow, FY22: −$146MOwner cash flow, FY23: −$290MOwner cash flow, FY24: −$691MOwner cash flow, FY25: −$303MOwner cash flow, TTM: −$83MCapital spending, FY21: −$228MCapital spending, FY22: −$190MCapital spending, FY23: −$301MCapital spending, FY24: −$806MCapital spending, FY25: −$563MCapital spending, TTM: −$160MWhat an owner put in after each yearOwner cash flow by fiscal year: operating cash flow with mined bitcoin counted as cash, less capital spending on miners and equipment, less stock pay. FY2021 to FY2025 were each negative, from −$146M to −$691M. The twelve months to June 2026 were −$82M, after capital spending fell to $160M.−$800M−$600M−$400M−$200M$0FY21FY22FY23FY24FY25TTMOwner cash flow, FY21: −$222MOwner cash flow, FY22: −$146MOwner cash flow, FY23: −$290MOwner cash flow, FY24: −$691MOwner cash flow, FY25: −$303MOwner cash flow, TTM: −$83MCapital spending, FY21: −$228MCapital spending, FY22: −$190MCapital spending, FY23: −$301MCapital spending, FY24: −$806MCapital spending, FY25: −$563MCapital spending, TTM: −$160M
Capital spending of $160M over the twelve months is well below the $442M of depreciation, because the company stopped buying miners. Standing still would cost far more. Source 10-K FY2025; 10-K FY2022; 10-Q June 2026 [2][18][3]. Calculated from reported figures.
Show the numbers
What an owner put in after each year
FY2021FY2022FY2023FY2024FY2025TTM Jun 2026
Owner cash flow (calculated)−$222M−$146M−$290M−$691M−$303M−$83M
Capital spending (calculated)$228M$190M$301M$806M$563M$160M
Stock pay (reported)$8M$32M$24M$30M$45M$73M

The balance sheet

At 30 June 2026 the company had $202.6M of cash, $814.9M of bitcoin and collateral receivable, $1.81B of debt at face, almost all zero-coupon converts, and $761M of book equity.38 Book equity was $2.18B nine months earlier. The fall is the $997M net loss and the $463M of buybacks.3 It has no coupon to pay on the converts. It does have two dates: June 2028, when holders of the 2030 notes can demand $650M, and February 2032, when $1,150M falls due.3

The new debt came after the quarter. The $2.276B notes belong to a subsidiary, are secured on the Sandersville lease and are not guaranteed by CleanSpark, except for the completion guarantee.7 A company-wide stress would not trigger them, but a failed build would reach the parent. Other claims: the Customs agency has billed tariffs on miners and if it loses, the total bill could rise to about $130M, plus interest. It has not set aside any money.3 A securities class action filed in 2021 is still open, though the court on 30 June 2026 excluded the plaintiffs’ expert on loss and damages.3

The share price since October 2020

Last close of each calendar quarter, log scale

  • Close, Q4 2026 $7.67
The share price since October 2020Quarter-end closes on a log scale, from $29.05 at December 2020 to $7.67 at 30 October 2026. The highest close was $40.39 on 7 January 2021 and the close on 30 October 2026 is the lowest in the past year.$1$3$10$30$100’21’22’23’24’25’26The share price since October 2020Quarter-end closes on a log scale, from $29.05 at December 2020 to $7.67 at 30 October 2026. The highest close was $40.39 on 7 January 2021 and the close on 30 October 2026 is the lowest in the past year.$1$3$10$30$100’21’22’23’24’25’26The share price since October 2020Quarter-end closes on a log scale, from $29.05 at December 2020 to $7.67 at 30 October 2026. The highest close was $40.39 on 7 January 2021 and the close on 30 October 2026 is the lowest in the past year.$1$3$10$30$100’21’22’23’24’25’26
The shares fell 49% from $15.14 on 22 September 2026 to $7.67 over five weeks. Source Nasdaq historical [1]. Calculated from reported closes.

Valuation

First, how this goes badly wrong

Before any number, I ask what would most likely hurt an owner, and work back from there. I see three ways.

The build slips or costs more, and the parent pays. CleanSpark has promised the noteholders it will cover any shortfall in finishing Sandersville, and the lease lets the tenant cut rent or end it if milestones are missed.710 A 15% overrun on $2.08B is about $312M, or $1.12 a share (calculated). A longer delay does more harm, because the notes accrue interest from the day they were sold and rent has not started.

The cash from the lease is spoken for. In my base, Sandersville leaves $37M in 2029, against overhead and stock pay of $113M in FY2029, while mining winds down (estimate). So until Texas signs, the company lives on its bitcoin and cash. That is $1.28B at today’s price, against $1.8B of convertible notes that come due in 2028 and 2032. If Texas never turns into a lease, the treasury runs down and the notes need a new lender.

Bitcoin falls further or stays here. The treasury is about half the market value. At $55,000 it loses $0.3B. And mining at today’s price loses money once the machines wear out, so no help comes from there.

What an owner gets today

Nothing. Over the twelve months to June the reported net loss was $998M, but owner cash was −$82M, because most of the loss was bitcoin marks and depreciation, not cash. Treat that as luck: the fleet is being run without replacement. If it were replaced the cost would be near $440M a year (estimate). In my base, owner cash is −$119M in FY2027 and −$327M in FY2028, before the convertible notes, because the first Texas leases need their equity put in before they pay.

What I can’t judge

Five things. What bitcoin the company holds today, since the last count was 30 June and it sells coins to fund itself. What rent Texas will pay: the letter of intent sets none. What the extensions pay: the lease says “annual escalators” and I assumed the 3.0% in the presentation continues. What overhead will be after mining ends: if it is half my number, the base is higher by $1.52 a share (calculated). And how much of Sandersville’s power today runs miners, so how fast the fleet shrinks. I use ranges. The wide gap between bear and bull is the honest answer.

How I value it

I add up the parts, because the company is now several things at once. Each is the present value of cash after stock pay and after the capital needed to stand still, discounted at 13% for mining, overhead and new leases, 10% for the Meta-guaranteed Sandersville cash and 9.5% for the convertible notes, which I subtract at present value. Years are fiscal, to September, from 2027 to 2057, the end of the extensions. Taxes use 15-year depreciation on the buildings, which keeps cash taxes near zero until the notes are paid. The odds are mine and are not used in the values. I do not forecast bitcoin: base holds it at today’s price, bear at $55,000, bull at $110,000.

Bear, base and bull

Assumptions behind each case. The bear model value is below zero; equity cannot be worth less than nothing, so I show $0.

Bear, base and bull cases
BearBaseBull
Bitcoin price held flat (estimate)$55,000$77,000$110,000
Network hash rate growth a year (estimate)10%15%20%
Share of today’s fleet still mining, FY2028 (gone by) (estimate)50% (FY2031)65% (FY2032)80% (FY2034)
Sandersville cost overrun; CleanSpark cash in (estimate)10%; $300M5%; $150M0%; $100M
Sandersville extensions exercised (estimate)No extensionsHalfBoth
New leases built on Sandersville’s terms (estimate)0 MW400 MW by FY20311,285 MW by FY2033
First-year rent a MW on new leases (estimate)$1.45M$1.45M$1.55M
Overhead after FY2030, with stock pay, plus 5% of rent (estimate)$40M$45M$55M
Customs tariff claim charged (estimate)$100M$30M$0
Value per share, model (calculated)−$2.84$2.62$13.95
Value per share, shown (estimate)$0$3$14
Source 10-Q June 2026; Sandersville presentation and filings; model in this page’s method [3][5][6]. Assumptions are my estimates.

Where the value comes from

Present value per share in each case, on 279.0M shares: 256.8M common, 15.0M unvested stock units and 7.2M performance units expected to vest.

Where the value comes from
BearBaseBull
Bitcoin mining, existing fleet (estimate)$0.13$0.62$1.55
Sandersville, after notes, tax and cash put in (estimate)$0.51$1.71$2.43
New leases, after their debt and equity put in (estimate)$0.00$3.26$12.68
Overhead and stock pay, all years (estimate)−$2.19−$3.04−$4.53
Cash and bitcoin at 30 June count, at the case price (estimate)$3.47$4.57$6.22
Convertible notes, at present value (estimate)−$4.37−$4.37−$4.37
Tariff claim and other (estimate)−$0.39−$0.14−$0.04
Value per share (calculated)−$2.84$2.62$13.95
Source 10-Q June 2026, Notes 9, 11, 13 [3]. Values are my estimates.

Read the base column down. The new leases are worth $3.26 a share, Sandersville $1.71, mining $0.62. Overhead takes −$3.04. The bitcoin and cash, $4.57, nearly offset the notes, −$4.37. So almost all of the base value is the lease business after its own costs, and most of that is leases not yet signed (estimate).

The base path

Owner cash by source, $ millions, fiscal years. The convertible notes ($650M in FY2028, $1,150M in FY2032) are not in these rows.

The base path
FY2027FY2028FY2029FY2030FY2031FY2032FY2033FY2034FY2035FY2036
Mining margin (estimate)$178M$18M$0M$0M$0M$0M$0M$0M$0M$0M
Overhead and stock pay (estimate)−$150M−$128M−$113M−$105M−$89M−$91M−$94M−$96M−$99M−$102M
Sandersville, after notes and tax (estimate)−$147M$50M$44M$38M$39M$41M$43M$44M$44M$38M
New leases, after debt and equity (estimate)$0M−$268M−$210M−$52M$193M$210M$225M$239M$253M$267M
Owner cash (calculated)−$119M−$327M−$279M−$119M$143M$159M$173M$186M$197M$203M
Source Model in this page’s method [3][5]. All figures are my estimates.

Owner cash in my three cases

US$ millions a year, fiscal years to September: bear to bull, with the base marked

  • Bear to bull, FY2041 −$40M to $1,046M
  • Base, FY2041 $253M
Owner cash in my three casesYearly owner cash (mining, leases, development equity, overhead), before the convertible notes fall due. Base: -119 in FY2027, 143 in FY2031, 253 in FY2041, in $ millions. Bear -40; bull 1046 in FY2041.−$500M$0$500M$1B$1.5B’27’29’31’33’35’37’39’41Owner cash in my three casesYearly owner cash (mining, leases, development equity, overhead), before the convertible notes fall due. Base: -119 in FY2027, 143 in FY2031, 253 in FY2041, in $ millions. Bear -40; bull 1046 in FY2041.−$500M$0$500M$1B$1.5B’27’29’31’33’35’37’39’41Owner cash in my three casesYearly owner cash (mining, leases, development equity, overhead), before the convertible notes fall due. Base: -119 in FY2027, 143 in FY2031, 253 in FY2041, in $ millions. Bear -40; bull 1046 in FY2041.−$500M$0$500M$1B$1.5B’27’29’31’33’35’37’39’41
The convertible notes, $650M in FY2028 and $1,150M in FY2032, come on top of these figures. Everything here is my estimate. Source Model in this page’s method; inputs from 10-Q June 2026 and the Sandersville filings [3][5][7]. Assumptions and values are my estimates.
Show the numbers
Owner cash in my three cases
202720282029203020312032203320342035203620372038203920402041
Bear (estimate)−$405M−$104M−$57M−$30M−$14M−$14M−$14M−$14M−$15M−$21M−$25M−$21M−$27M−$34M−$40M
Base (estimate)−$119M−$327M−$279M−$119M$143M$159M$173M$186M$197M$203M$213M$230M$237M$244M$253M
Bull (estimate)$130M−$482M−$451M−$266M$51M$171M$703M$746M$787M$825M$867M$918M$960M$1,001M$1,046M

What the price says

At $7.67 the market is paying for much more than my base. Holding my other base inputs, the price needs about 1,170 MW built and rented on Sandersville’s terms, or about $101,000 bitcoin with all 885 Texas MW built (estimate). The Texas letter covers 885 MW at most. The company would need to find another 285 MW or more beyond it, and also put in $2.1B of equity at 15% of cost, from a treasury of $1.1B of bitcoin and $0.2B of cash.43

Reverse discounted cash flow

What the price needs, one input at a time.

Reverse discounted cash flow
What the price of $7.67 needsHolding my other base inputs
New leases built and rented on Sandersville’s terms (estimate)About 1,170 MW, against 400 in my base and 885 in the Texas letter of intent
Or bitcoin, with the 885 MW built (estimate)About $101,000, against $77,200 today
Or lower rates alone, at 400 MW (estimate)Not enough: at 10%, 8% and 10% the value is $4.64
Equity put in for the new leases (estimate)About $2.1B at 15% of cost, against $1.1B of bitcoin and $0.2B of cash
Source Model in this page’s method; price from Nasdaq [1]. Estimates.

How much the answers move

The discount rate matters, but not enough to explain the price. Cutting every rate by three points gives $4.64, below the price. The bigger swing is how many megawatts get leased, and what bitcoin does. The grid is below.

Base value by discount rate

Value per share in the base case at three sets of rates.

Base value by discount rate
Low ratesBase ratesHigh rates
Mining, overhead and new leases (estimate)10%13%16%
Sandersville (estimate)8%10%12%
Value per share (calculated)$4.64$2.62$1.38
Source Model in this page’s method [3][5]. Estimates.

Base value by bitcoin price and new leases built

Value per share; the 400 MW column is my base at $77,000.

Base value by bitcoin price and new leases built
Bitcoin price0 MW400 MW885 MW1,285 MW
$45,000 (estimate)−$2.23$0.40$3.58$6.21
$55,000 (estimate)−$1.61$1.01$4.20$6.82
$77,000 (estimate)−$0.01$2.62$5.80$8.43
$100,000 (estimate)$1.82$4.44$7.63$10.25
$130,000 (estimate)$4.22$6.84$10.03$12.65
Source Model in this page’s method [3][5]. Estimates.

The margin of safety

My margin-of-safety price is $1. The bear case is zero in the model, so I set it where the market would pay only about $0.3B for a company with a signed Meta lease, 1.8 GW of power and a treasury that nearly covers its notes. In my base, the treasury net of the notes is worth almost nothing, so at $1 the market is paying for part of Sandersville and giving Texas away. That is not a floor. If Sandersville fails the equity can go to zero.

What it is worth, against the price

Value per share, my estimates, against the close in Q4 2026

  • Bear to bull $0 to $14
  • Base $3
  • Price $7.67
  • Margin of safety below $1
What it is worth, against the priceValue per share: bear $0, base $3, bull $14. Price in Q4 2026: $7.67, 193% above the base value and 45% below the bull. Margin-of-safety price $1.BEAR$0BASE$3BULL$14Price $7.67What it is worth, against the priceValue per share: bear $0, base $3, bull $14. Price in Q4 2026: $7.67, 193% above the base value and 45% below the bull. Margin-of-safety price $1.BEAR$0BASE$3BULL$14Price $7.67What it is worth, against the priceValue per share: bear $0, base $3, bull $14. Price in Q4 2026: $7.67, 193% above the base value and 45% below the bull. Margin-of-safety price $1.Margin-of-safety zone: below $1$0$5$10$15$20Bear to bull: $0 to $14Bear case: $0 per shareBEAR$0Base case: $3 per shareBASE$3Bull case: $14 per shareBULL$14Price in Q4 2026: $7.67Price $7.67Close, Q4 2026
The weighted value, 25% bear, 50% base and 25% bull, is $5. Source Nasdaq historical; model in this page’s method [1]. Values are my estimates.

The price against the range

At $7.67 the price is 193% above my base value of $3 (the model gives $2.62 before rounding) and 45% below my bull of $14. The market is paying for a good part of the bull case. Its case is that Meta’s tenant signs all of Texas soon, that CleanSpark builds at Sandersville’s cost, and that debt stays available at 8%. Each has happened once, at one site. I give the full set a 7% chance together, in the table below. The market may know more than I do about the tenant’s plans. I cannot see them.

Against the alternative

The next best use of the same dollar is a business that already collects rent on power for data centers. The closest on this site are Constellation Energy, whose base value implies +7.7% a year to year 10, and Vertiv at +3.7%. My base for CleanSpark gives +1.1% a year on the same method, below both, and it needs more things to go right (estimate).

Quality and price, separately

The quality question is whether the business earns more than the capital it uses. Mining does not at today’s price. The Sandersville lease does, on a project basis, with a strong tenant. Whether the whole company does depends on Texas and on how much of the lease income it pays out in overhead and stock. The price question is separate: $7.67 sits above my base and below my bull. A good lease at an unclear price is not a good purchase by default. I leave the decision to the reader.

How the odds multiply

The price needs several things at once. Multiplying my guesses gives 7%. The odds are mine and are not used in the values.

How the odds multiply

Each step is a separate risk; the product is the chance all hold.

How the odds multiply
Needed for the priceMy chance
Sandersville built and rented on time, no large overrun (estimate)85%
Meta’s tenant signs the Texas block, not only a letter (estimate)50%
At rents near $1.9M a MW-year and with debt at or below 8% (estimate)70%
A further 285 MW or more leased beyond Texas (estimate)40%
Bitcoin and the treasury stay up through the build (estimate)60%
All of it together (calculated)7%
Source My estimates; no source.

Where this could be in 5 and 10 years

These are my estimates of value, not forecasts of the price.

Value per share in 5 and 10 years
Year 5, to October 2031Year 10, to October 2036Cash paid to owners to 2036Yearly return from $7.67 to year 10
Bear (estimate)$0$0$0.00−100%
Base (estimate)$3.72$8.53$0.00+1.1%
Bull (estimate)$22.82$41.23$0.00+18.3%

The table gives the model’s value per share at each date: the cash and bitcoin kept by then (bitcoin at today’s price), plus the present value of owner cash after it, less the notes still owed, per 279M shares today, in each year’s dollars. The model pays nothing to owners before 2036: cash stays in the company to meet the notes and fund new leases. The bear falls below zero in both years because the treasury is spent before the notes fall due, so I show $0.

For the base to be right at five years, Sandersville must be paying rent, 400 MW of new leases must be signed and under construction, and the 2028 notes must have been repaid from the treasury. It rises from $3.72 at five years to $8.53 at ten because the new leases come into rent and their debt is paid down. It needs rents near $1.45M a MW-year, 3% escalators, debt at about 8% and a discount rate near 13%. The most likely way it is wrong is that Texas is smaller or later, or that the rent is lower; each 100 MW is worth about $0.65 a share today, $1.39 at five years and $2.59 at ten.

The bull is the same business with 1,285 MW leased and bitcoin at $110,000. The bear is Sandersville alone and bitcoin at $55,000. A reader’s guide: the market price can sit above or below these values for years.

The case for the price

What most people miss

Three things cut in CleanSpark’s favour and are easy to overlook. First, the tenant is not a start-up renting from a miner. Meta, through a subsidiary, signed, and Meta guarantees rent and operating costs.5 Second, CleanSpark has put in little of its own money. The September notes pay for the remaining build, repay its earlier contributions and fund reserves, so the company says the equity for Sandersville is fully funded.78 Third, the convertible notes cost nothing in cash. They carry no coupon, and the first date that matters is June 2028.3 So there is time to sign Texas.

The bull case

In plain words: AI buyers are short of powered land, CleanSpark has it, and one signed lease proves buyers will pay a fair price for it. The chairman and CEO said on 14 July that the lease validates the land-and-power strategy, and that the company had always believed in a second-mover advantage: grow as the market matures, then execute on excellent terms.4 If Texas follows on the same terms, the company is a landlord with 1,285 MW and 3% rent escalators, and 20-year contracts. That is my bull, $14 a share.

Holders say it with money more than words. Situational Awareness LP, the fund run by Leopold Aschenbrenner, held 12,276,139 CleanSpark shares, worth $178.6M, at 30 June 2026, according to its 13F-HR filed on 14 August 2026.21 That is a dated fact. The 13F does not show shorts or holdings outside the United States, and I do not read it as saying what the fund holds now or will do. Not everyone agrees: no insider bought shares in the market in the past year.13

Against reality

Today, one 175 MW lease is signed and 885 MW of exclusivity is not a lease. If CleanSpark builds Sandersville on time, Texas converts at about $1.9M a MW-year, and bitcoin holds, then a price near $8 is possible only if it also finds a further 285 MW of customers. My base is 400 MW and $3. The distance between them is 2.9 times the Texas I have in my base, or $101,000 bitcoin (calculated).

What a 10x would take. Ten times $7.67 is $76.70. At that price the convertible notes would convert and the count would rise to about 377M shares, a market value near $29B (calculated). On my model that needs about 15,138 MW rented on Sandersville’s terms, 8 times CleanSpark’s whole contracted capacity of 1,817 MW, and about $29B a year of rent (estimate).3 The shares have done it before. They rose 13 times from $1.78 on 19 December 2022 to $23.40 on 25 March 2024, and the highest close ever, $40.39, was on 7 January 2021.1 That was off a low base. A tenfold move from here is a new, much larger company, and I would not build a case on it.

What they have to hit

Six numbers on a fixed schedule. Thresholds come from my base case and agree with the signposts below.

What they have to hit
IndicatorTodayWhat the case needsWhere to track itNext check
Sandersville deliveryRent to start 30 November 2027; long-lead equipment ordered and pre-paid85First hall delivered on time, no rent abatement (estimate)10-K and 10-Q, subsequent events and the lease note; 8-KsFY2026 Form 10-K, expected late November 2026 (last year 25 November)
Texas leaseLetter of intent and exclusivity on 885 MW, no rent or date4A signed lease for at least 400 MW at $1.9M a MW-year or more by end of 2027 (estimate)8-K Item 1.01 and press releases20 March 2027, the date the 800 MW target in the 2026 plan runs out3
Treasury13,924 bitcoin including collateral, $814.9M at 30 June8At least 12,500 coins, about $1B at today’s price, held through the build (estimate)10-K, Note on Bitcoin; 10-Q liquidityFY2026 Form 10-K, late November 2026
Owner cash and overheadOwner cash −$82M over twelve months; cash overhead about $148M a year3Overhead with stock pay under $115M by FY2029 as mining ends (estimate)10-K and 10-Q: payroll, G&A, professional fees, stock payFY2026 Form 10-K; Q1 FY2027 10-Q, February 2027
Share count256.8M common; 279M with units3Under 300M through 2028, meaning no large equity sale before leases are signed (estimate)10-Q cover page and Note 11Q1 FY2027 10-Q, February 2027
Sandersville notes$2.276B at 7.875%, with a completion guarantee7No call on the guarantee, overrun under 5% (estimate)10-K liquidity and guarantees; indenture reportsFY2026 Form 10-K, late November 2026
Source 10-Q June 2026; Sandersville filings; Form 4s [3][8][5][7][4][13]. Thresholds are my estimates.

Where I come down

The Meta guarantee and the way the notes were structured moved me: Sandersville needs little of the company’s own cash. The buybacks at $12 and $15 and a pay plan that rewards megawatts did not. A signed Texas lease at or above $1.9M a MW-year, with debt near 8%, would raise my values most, and I would need a lower overhead to move the base toward the price.

Risks, and what would change my view

The three ways this goes badly wrong are at the start of Valuation. These are the rest.

  • One tenant. All the contracted rent comes from one Meta subsidiary. The guarantee covers rent and operating expenses, but the lease still lets the tenant cut rent or end it if CleanSpark misses its milestones.510
  • Construction and equipment. A third party leads the build, equipment has long lead times, and the project needs regulatory approvals and power.3
  • Dilution and financing. The company says it will need to raise substantial additional capital for Sandersville and any other site, perhaps equity or equity-linked.3 It sold $1.23B of stock in fiscal 2024 and $187M in fiscal 2025, and could sell more if the treasury ran short.2
  • Bitcoin. The treasury and the mining margin both depend on it, and the company has lent coins out as collateral.3
  • Mining wind-down. The company is still assessing impairment on the Sandersville miners and cannot estimate the charge.3 If the company stopped mining altogether, the executives’ monthly bitcoin pay would end.12
  • Legal. A securities class action from 2021 is open, a shareholder derivative case is open, and Customs says the total tariff bill on its 2024 miners could rise to about $130M.3
  • Control and pay. About 23.5% of the vote sits with insiders through the preferred shares.16 Pay is built on megawatts and high share-price hurdles.3
  • Demand. The 10-Q lists a change in AI infrastructure needs as a risk to the value of the project.3

Culper Research short reports on CleanSpark

Who and what. Culper Research, a short seller, says in both reports that it is short CleanSpark, so it gains if the price falls.2526 The reports are “Cleanspark (CLSK): Back to the Trash Can” (14 January 2021) and “CleanSpark, Inc. (CLSK): Mining Operations Don’t Add Up” (18 June 2021). Culper’s site blocks automated access, so I read a court copy of the first and an Internet Archive copy of the second.2526

What it alleges. The January report says ATL Data Centers, a College Park, Georgia site CleanSpark bought in December 2020, was the rebranded assets of a bankrupt operation, and that Marathon dropped a bid in September 2020 because ATL’s “subsidized” power rate would end in three years, undisclosed by CleanSpark (pp. 2 to 6).2532 It also says CleanSpark overstated or fabricated customers and contracts in its energy business and had undisclosed related-party deals (pp. 7 to 12).25 The June report says reported mining costs for the March 2021 quarter, $611,863, do not reconcile with $693,144.70 of ATL power bills, that city emails call out a rate change “starting in 2024”, and that a “strategic contract” is spread over five years, not three (pp. 2 to 6).26

The response. On 21 January 2021 CleanSpark filed an 8-K press release calling the accusations false, saying it “stands behind its prior statements and disclosures” and that the publisher was hidden and short the stock. It names no claim and does not address ATL’s power rate. I found no reply to the June report.2729

Established, and not. Marathon said on 17 September 2020 that it withdrew its bid for Fastblock Mining over a subsidized power rate ending in three years; the link to ATL is Culper’s.32 CleanSpark’s filings call its ATL “strategic contract” a critical-input supply “at significantly low prices compared to market”, amortized over five years18 to nil by 30 June 2026.3

The suit is Hasthantra v. CleanSpark, Inc., No. 1:21-cv-00511 (S.D.N.Y.), filed 20 January 2021 as Bishins.28 It alleges CleanSpark misled investors about ATL and cites the January report as a corrective disclosure.30 The motion to dismiss was denied on 5 January 2023, taking the complaint’s facts as true.29 A class of CleanSpark buyers was certified on 24 September 2025.30 The plaintiffs’ loss-causation and damages expert was excluded on 30 June 2026 and an amended report refused on 14 October 2026.313 The docket shows no settlement, judgment or appeal; I could not read entries 128 to 130: two letters and a memo endorsement, 28 October to 9 November.28 CleanSpark says the claims are without merit and it cannot estimate a loss; its 10-K says they appear derived from a short seller report.32 None of these rulings decides whether a Culper claim is true; I found no finding that does.

Where each claim stands

From the documents I could read. The latest court entry I could see is dated 9 November 2026.

Culper claims and status
ClaimCompany responseStatusTrack
ATL was a rebranded failed site; Marathon left over powerGeneral denial, 21 Jan 2021Marathon’s withdrawal is on record. In the suit, taken as pleaded, no findingCourt docket
Subsidized power ends in 2024None foundPleaded with the Marathon claim, no ruling. CleanSpark still owns a College Park site but gives only an average across owned facilities: $0.048, $0.046 and $0.057 a kilowatt-hour in fiscal 2023, 2024 and 2025210-K, average power price
Q1 2021 mining costs do not match power billsNone foundReported cost matches the 10-Q; the bills I cannot check. No fiscal 2021 10-K or 10-Q amended. Not in the court’s 2025 summary of the plaintiff’s claimsAny amended filing
Customers and contracts overstated; related-party dealsGeneral denial, 21 Jan 2021Mostly the energy business, held for sale in 2022. Not in the court’s 2025 summary of the plaintiff’s claimsCourt docket
Source Culper reports, 8-K of 21 January 2021, court record [26][27][30][33][34]. Status is my reading of those documents.

In my model. Only the power claim reaches an input, my 5.3 cents a kilowatt-hour; existing mining is $0.62 of my $2.62 base. ATL drew about 10 MW in 2021 on Culper’s bills, about 1.5% of today’s 670 MW fleet (calculated). Doubling its rate takes about 2.5 cents off the base; if College Park is now 5% of the fleet, about 8 cents (estimate). No filing I read gives its size. The class action has no line in my base; each $100M paid is about $0.36 a share (calculated). The customer and related-party claims concern 2017 to 2020 deals, mostly in the energy business held for sale in 2022, so sit outside it.18

So what

These are 2021 claims about one site and an old business; my value rests on the Sandersville lease, Texas and bitcoin. Culper is right if College Park’s power cost rose sharply from 2024 and 2021 costs were understated; CleanSpark is right if the costs reconcile through items outsiders cannot see and College Park’s power stayed cheap. Culper gains if the price falls; management and insiders are paid in the stock. The court record and filings are knowable now; what College Park pays, why the 2021 figures differ and what the parties told the court after 14 October are not. Watch the fiscal 2026 10-K, due by 30 November, for its legal note and owned-facility power price, and the docket.

Geopolitical risk, and what it means for the value

CleanSpark has no foreign plants, customers or currency. Its exposure is to American power rules, American trade policy and the bitcoin price. I rerun my base for each case below and show the value per share.

Power. The Texas land is in Austin and Brazoria counties. In July Austin County put a temporary moratorium on data centers and battery storage, and on 3 August Governor Abbott told ERCOT and the Public Utility Commission to audit every data center in the interconnection queue before it moves on. The company says it is still weighing both.3 Texas law since June 2025 also lets ERCOT cut large new loads in an emergency.22 In Georgia, a new Georgia Power customer above 100 MW can be given longer contracts and minimum bills, and the contract goes to the state commission.23 I could not confirm which utility serves Sandersville, so I do not know whether that rule applies. The Meta guarantee covers rent and operating costs, but the lease still lets the tenant cut rent or end it if CleanSpark misses a milestone, and a late power connection misses one as easily as a late builder.10 Tennessee matters less: those sites mine, and my base already runs mining down.

Tariffs and rules on mining. Customs says some miners CleanSpark imported in 2024 came from China, not where the seller said; if it wins, the total could reach about $130M.3 In August 2025 the gap between origins was large, 57.6% against 21.6% for Southeast Asia, and I did not check today’s schedule.24 My base charges $30M. Tariffs on new machines matter little because the base buys almost none; tariffs on electrical equipment would raise build cost while rent stays fixed. The filing calls mining largely unregulated, expects more rules, and describes Georgia, Mississippi and Tennessee as favorable.2

Odds, with my basis. Texas two years late or smaller: about one in three, because two government actions arrived within four months. Sandersville rent a year late: about one in five, with equipment already paid for but a third party building. Meta ending the lease: under one in ten, because it is the tenant and the guarantor. Customs winning in full: about one in four, because some protests were approved. I do not forecast bitcoin. These are judgements, not forecasts of events.

The price needs about 1,170 MW, so it assumes none of these delays. My base holds only the $30M Customs charge, so each case below widens the gap between value and price.

What each case does to the base value

Value per share, my base with one change at a time.

Geopolitical cases
CaseWhat changesBase value
My base (calculated)Nothing$2.62
Texas two years late (estimate)Each Texas lease starts two years later$1.99
Texas half the size and a year late (estimate)200 MW instead of 400 MW$1.14
No Texas lease (estimate)0 MW−$0.01
Sandersville rent a year late (estimate)CleanSpark pays the extra year of interest, $179M$1.84
Meta ends the Sandersville lease (estimate)Sandersville cash is lost; before any call on the completion guarantee$0.41
Customs wins in full (estimate)$130M charge instead of $30M$2.26
Build cost 10% higher on new leases (estimate)Equipment tariffs; rent fixed$1.79
State rule stops mining now (estimate)Mining value removed$1.99
Bitcoin at $55,000 (estimate)Regulation or other shock$1.01
Source My model, base case; rules and claims from [3][22][23][24]. Estimates.

What would change my view

Signals that move my values, in either direction.

Signposts
SignalTodayRaises my valueLowers my value
Texas leaseLetter of intent, 885 MW4A signed lease for 400 MW or more on Sandersville’s termsNo lease by the end of 2027
Sandersville rentStarts 30 November 20275On time, no abatementA missed milestone or a call on the guarantee
Bitcoin held13,924 coins at 30 June8At least 12,500 held through 2027Below 8,000 or lent out further
OverheadAbout $148M cash a year3Under $115M with stock pay by FY2029Above $150M after mining ends
Share count256.8M common3Flat to 2028Equity sale before a Texas lease
Financing cost7.875% on project notes6Next project debt at 7.5% or lowerAbove 9% or not available
Source 10-Q June 2026; Sandersville filings [3][5][4][8][6]. Thresholds are my judgement.

Sources

  1. 1CLSK daily closes, Nasdaq.com historical API, 1 October 2020 to 30 October 2026 (opens in a new tab)PriceNasdaq · 30 Oct 2026 · Close/Last on 10/30/2026 = $7.67, Nasdaq Capital Market; cross-checked against the Yahoo Finance chart feed, also $7.67; high close $40.39 on 7 Jan 2021 · Accessed 30 Oct 2026↩︎
  2. 2CleanSpark Form 10-K, year ended 30 September 2025 (opens in a new tab)FilingSEC EDGAR · 25 Nov 2025 · Business; properties; statements of operations and cash flows for FY2025, FY2024 and FY2023; employees · Accessed 30 Oct 2026↩︎
  3. 3CleanSpark Form 10-Q, quarter ended 30 June 2026 (opens in a new tab)FilingSEC EDGAR · 6 Aug 2026 · Balance sheet, income statement, cash flow; Notes 3, 4, 9, 11, 12, 13, 15, 16; MD&A mining statistics; liquidity; risk factors on the data center strategy; cover share count (256,817,073 at 4 Aug 2026) · Accessed 30 Oct 2026↩︎
  4. 4CleanSpark press release: 20-year lease at Sandersville, Georgia (Ex. 99.1 to 8-K) (opens in a new tab)FilingSEC EDGAR · 14 Jul 2026 · 175 MW critical IT; $6.6B contracted revenue; average annual NOI about $330M; landlord cost $10M to $12M a MW; Texas exclusivity on 885 MW · Accessed 30 Oct 2026↩︎
  5. 5CleanSpark Sandersville investor presentation (Ex. 99.1 to 8-K) (opens in a new tab)FilingSEC EDGAR · 17 Sep 2026 · Tenant is Anviran, LLC, a wholly owned subsidiary of Meta, with Meta as guarantor of rent and operating expenses; 3.0% escalator; $11.9M a MW; rent from November 2027; illustrative annual NOI, debt service and cash after debt service · Accessed 30 Oct 2026↩︎
  6. 6CleanSpark 8-K and press release: pricing of $2.276B 7.875% senior secured notes due 2031 (opens in a new tab)FilingSEC EDGAR · 18 Sep 2026 · Issued at 98.500% of principal by CSDC Finance I, LLC · Accessed 30 Oct 2026↩︎
  7. 7CleanSpark 8-K: closing of the senior secured notes (Item 1.01) (opens in a new tab)FilingSEC EDGAR · 25 Sep 2026 · Use of proceeds; amortization; completion guarantee by CleanSpark; covenants; change-of-control put at 101% · Accessed 30 Oct 2026↩︎
  8. 8CleanSpark press release, third fiscal quarter 2026 results (Ex. 99.1 to 8-K) (opens in a new tab)FilingSEC EDGAR · 6 Aug 2026 · Results; bitcoin value $814.9M including collateral; equity portion of Sandersville described as fully funded; long-lead items pre-paid · Accessed 30 Oct 2026↩︎
  9. 9Bitcoin (BTC-USD) daily closes, Yahoo Finance chart feed; Coinbase spot (opens in a new tab)PriceYahoo Finance and Coinbase · 30 Oct 2026 · Bitcoin about $77,200 on 30 October 2026 (Yahoo); Coinbase spot for the same date $77,779 · Accessed 30 Oct 2026↩︎
  10. 10CleanSpark 8-K: Sandersville lease, Items 7.01 and 8.01 (opens in a new tab)FilingSEC EDGAR · 14 Jul 2026 · Triple net, annual escalators, 20-year term, two five-year options; financing, construction and delivery milestones, with rent abatement or termination if missed; letter of intent over 718 acres · Accessed 30 Oct 2026↩︎
  11. 11Hut 8 Form 8-K, Exhibit 99.1: 15-year, 245 MW lease at River Bend, total contract value $7.0 billion (opens in a new tab)FilingSEC EDGAR · 17 Dec 2025 · $7.0B over the 15-year base term, 245 MW of IT capacity, Google backstop, expected average annual NOI $454M · Accessed 31 Oct 2026↩︎
  12. 12CleanSpark definitive proxy statement, 2026 annual meeting (opens in a new tab)FilingSEC EDGAR · 22 Jan 2026 · Summary Compensation Table; employment agreements; CEO pay ratio; beneficial ownership at 9 Jan 2026; Series A holders · Accessed 30 Oct 2026↩︎
  13. 13CleanSpark Forms 4, October 2025 to October 2026 (EDGAR filing index) (opens in a new tab)FilingSEC EDGAR · 1 Oct 2026 · 50 Forms 4: share awards (M), tax withholding (F) and sell-to-cover (S); one director sale of 85,315 shares on 23 Dec 2025 at $11.69; no open-market purchase (P) · Accessed 30 Oct 2026↩︎
  14. 14Bitcoin network hash rate, Blockchain.com charts API (opens in a new tab)DataBlockchain.com · 30 Oct 2026 · About 1,006 EH/s in late October 2026 · Accessed 30 Oct 2026↩︎
  15. 15Cipher Mining Form 8-K, 3 Nov 2025: business update on the Amazon Web Services lease (opens in a new tab)FilingSEC EDGAR · 3 Nov 2025 · 15-year lease, about $5.5B estimated contract value, 300 MW of gross capacity, rent from August 2026 · Accessed 31 Oct 2026↩︎
  16. 16CleanSpark 8-K: results of the 2026 annual meeting (opens in a new tab)FilingSEC EDGAR · 5 Mar 2026 · Record date shares: 255,750,361 common and 1,750,000 Series A with 78,750,000 votes · Accessed 30 Oct 2026↩︎
  17. 17CleanSpark 8-K: amended Series A Preferred Stock terms and special dividend (opens in a new tab)FilingSEC EDGAR · 24 Mar 2026 · Quarterly dividend on 2% of EBITDA removed; one-time special dividend of $17.14 a share; holders are the chairman and CEO, a director, their company and the former CEO · Accessed 30 Oct 2026↩︎
  18. 18CleanSpark Form 10-K, year ended 30 September 2022 (opens in a new tab)FilingSEC EDGAR · 15 Dec 2022 · FY2022 and FY2021 cash flow statements (bitcoin mined and sold, miners, fixed assets, stock pay) · Accessed 30 Oct 2026↩︎
  19. 19CleanSpark company facts (XBRL), SEC EDGAR (opens in a new tab)DataSEC EDGAR · 30 Oct 2026 · Annual revenue, operating income, net income, stock pay, depreciation, FY2020 to FY2025 · Accessed 30 Oct 2026↩︎
  20. 20CleanSpark Form 10-K, year ended 30 September 2024 (opens in a new tab)FilingSEC EDGAR · 3 Dec 2024 · FY2024 statements; used to cross-check the FY2023 and FY2024 columns · Accessed 30 Oct 2026↩︎
  21. 21Situational Awareness LP Form 13F-HR for 30 June 2026 (opens in a new tab)FilingSEC EDGAR · 14 Aug 2026 · CleanSpark Inc common, 12,276,139 shares, $178,617,822 at 30 June 2026 (accession 0000935836-26-000418) · Accessed 30 Oct 2026↩︎
  22. 22Texas Senate Bill 6 ushers in major overhaul of large-load interconnection and grid access rules (opens in a new tab)PressBracewell LLP · 9 Jul 2025 · Law-firm summary of SB 6, signed 20 Jun 2025: loads above 75 MW, curtailment and remote disconnect for loads connecting after 31 Dec 2025, study fee and financial commitment · Accessed 31 Oct 2026↩︎
  23. 23PSC approves rule to allow new power usage terms for data centers (opens in a new tab)PressGeorgia Public Service Commission · 23 Jan 2025 · Georgia Power customers above 100 MW: extra terms, 15-year contracts, minimum bills, contracts sent to the commission · Accessed 31 Oct 2026↩︎
  24. 24Trump’s latest tariff overhaul squeezes US bitcoin miners (opens in a new tab)PressThe Block · 6 Aug 2025 · Tariffs on mining machines from 7 Aug 2025: 21.6% in total for Indonesia, Malaysia and Thailand, 57.6% for China; I did not check today’s schedule · Accessed 31 Oct 2026↩︎
  25. 25Culper Research, “Cleanspark (CLSK): Back to the Trash Can”, 14 January 2021 (opens in a new tab)ReportCopy filed as Exhibit 2 (Doc. 36-2) to the amended complaint in Hasthantra v. CleanSpark, S.D.N.Y., 28 Feb 2022 · pp. 2 to 12 of the report. Culper’s own PDF returns HTTP 403 and has no Internet Archive copy. The filed copy’s page header misdates the report 14 January 2020 · Accessed 11 Nov 2026↩︎
  26. 26Culper Research, “CleanSpark, Inc. (CLSK): Mining Operations Don’t Add Up”, 18 June 2021 (opens in a new tab)ReportInternet Archive capture of 3 Nov 2025, matching Exhibit 3 (Doc. 36-3) to the amended complaint · pp. 2 to 6 of the report · Accessed 11 Nov 2026↩︎
  27. 27CleanSpark press release, “CleanSpark Investigating Short Seller Culper Research” (Ex. 99.1 to 8-K) (opens in a new tab)FilingSEC EDGAR · 21 Jan 2021 · Calls the report false; says it stands behind its disclosures; counsel retained; says suits based on the report had been filed; names no specific claim · Accessed 11 Nov 2026↩︎
  28. 28Hasthantra v. CleanSpark, Inc., No. 1:21-cv-00511 (S.D.N.Y.), docket (opens in a new tab)FilingCourtListener (RECAP) · Docket last updated 9 Nov 2026 · Entries 1, 30, 36, 77, 80, 101, 127 to 130; entries 128 to 130 have no RECAP copy (PACER only) and 129 and 130 carry no description text · Accessed 11 Nov 2026↩︎
  29. 29Opinion & Order denying motion to dismiss, Bishins v. CleanSpark (Doc. 60) (opens in a new tab)FilingS.D.N.Y., Judge Preska · 5 Jan 2023 · Facts taken as pleaded; the Culper report adequately pleaded as a corrective disclosure · Accessed 11 Nov 2026↩︎
  30. 30Opinion and Order granting class certification, Hasthantra v. CleanSpark (Doc. 101) (opens in a new tab)FilingS.D.N.Y., Judge Preska · 24 Sep 2025 · Class period 10 Dec 2020 to 16 Aug 2021; three theories and four corrective disclosures described on pp. 2 to 3 · Accessed 11 Nov 2026↩︎
  31. 31Opinion & Order denying leave to serve an amended expert report, Hasthantra v. CleanSpark (Doc. 127) (opens in a new tab)FilingS.D.N.Y., Judge Preska · 14 Oct 2026 · Recites the preclusion of the plaintiffs’ expert (transcript of the 30 Jun 2026 conference, Doc. 123, not available; the date also appears in the June 2026 10-Q) · Accessed 11 Nov 2026↩︎
  32. 32Marathon Patent Group press release: withdraws offer to acquire Fastblock Mining (opens in a new tab)PressMarathon Patent Group · 17 Sep 2020 · Subsidized power rate to expire in three years; does not name the power provider or the site · Accessed 11 Nov 2026↩︎
  33. 33CleanSpark Form 10-Q, quarter ended 31 March 2021 (opens in a new tab)FilingSEC EDGAR · 6 May 2021 · Segment note: digital currency mining revenues $6,715,792 and total cost and expenses $611,863 · Accessed 11 Nov 2026↩︎
  34. 34SEC EDGAR filing record for CleanSpark, Inc. (CIK 827876) (opens in a new tab)DataSEC EDGAR · Filing list read 11 Nov 2026 · No 10-K/A or 10-Q/A after April 2018; last 10-Q filed 6 Aug 2026 · Accessed 11 Nov 2026↩︎

How the figures are labelled

(reported)Reported: taken from a filing or a price feed, as printed.

(calculated)Calculated: arithmetic on reported figures, such as a margin or a growth rate.

(estimate)Estimate: my judgement, such as a case value or a growth assumption.

The price

Close in Q4 2026: $7.67, from Nasdaq [1]. Retrieved in Q4 2026. The fiscal year ends on 30 September. Annual results for fiscal 2026 are not out, so the latest twelve months are the four quarters to 30 June 2026. Per-share values use 279.0M shares: 256.8M common at 4 August 2026, 15.0M unvested stock units and 7.2M performance units expected to vest. The convertible notes are not counted as shares unless the value passes their conversion price ($14.80 and $19.16), when I add the shares, less the capped call on the 2030 notes. Warrants and options are out of the money.

The valuation

Sum of the parts, each the present value of owner cash after stock pay: the existing mining fleet (revenue at my bitcoin price and the network share, less energy at 5.3 cents, to the end of the fleet’s life); the Sandersville lease (net operating income from the company’s presentation, escalated 3% a year, less interest at 7.875% on $2.276B, the principal schedule scaled from the presentation, and tax with 15-year depreciation, less my estimate of the cash CleanSpark puts in); new leases at 85% debt, 20-year amortization, $11.9M a MW cost and a first-year rent in the table; overhead and stock pay; and the treasury and notes. Discount rates: 13% for mining, overhead and new leases, 10% for Sandersville, 9.5% for the convertible notes. Years are fiscal, 2027 to 2057, each year’s cash at year end, from the price date. The treasury is the 30 June count of 13,924 bitcoin at the case price plus 30 June cash; I do not know what it holds today. I subtract the notes at present value, not face; at face the base would be lower by about $2.09 a share. The odds in the table are my guesses and are not used in the values, except that the weighted value of $5 uses 25%, 50% and 25%.

The margin-of-safety price is $1. No rating: the page states a range and the price, and leaves the decision to the reader.

Research, not investment advice. Figures as of .

Legal information and disclosures

These are my own views as of the update shown on this page. They can change without notice, and I have no duty to update them. Past performance does not indicate future results, and any investment can lose money.

This is for education only. It is not investment, legal, tax or accounting advice, and it is not an offer to sell or a solicitation to buy any security in any jurisdiction. It does not consider your goals or circumstances.

Figures from company filings and other third parties are believed to be reliable, but I have not independently verified them and cannot guarantee them. Bear, base and bull values, and anything marked as an estimate, are my own and rest on assumptions that may prove wrong.

Please do not copy or republish this material without my written consent.