Investing№ 32NYSE: ORCL
Oracle
Oracle sells databases and business software to large companies, and it has bet the balance sheet on renting AI computing: cloud infrastructure grew 121% last quarter, the backlog is $664B, and free cash flow over twelve months was −$28.7B.43
Updated Fiscal year ends 31 May41 min readPedrum Shokouhi
Can be disrupted
Research, not investment advice. Figures as of .
Key numbers
- Revenue$71.8B (calculated)TTM Aug 2026; up 22% on a year earlier 2319
- Cloud infrastructure$7.4B (reported)Quarter to 31 Aug 2026; up 121% 4
- Backlog (RPO)$664B (reported)31 Aug 2026; 13% due within 12 months 3
- Free cash flow−$28.7B (calculated)TTM; $46.9B of operating cash less $75.7B of capital spending 23
- Owner cash, to stand still$16.7B (estimate)TTM; 88% of net income, a 4.0% yield at the price 23
- Net debt$88.3B (calculated)31 Aug 2026; plus $288B of leases signed, not started 3
The answer
- Oracle turned a steady software business into the builder of AI data centers, and in the twelve months to August 2026 revenue was $71.8B, up 22%, capital spending was $75.7B, and S&P estimates that about half of the $664B backlog rests on one customer, OpenAI, a share Oracle does not confirm.3421
- I value it at $122 a share, in a range of $44 to $195; the top of that range is roughly what Oracle’s own FY2030 targets are worth at my 11.0% rate, and the bottom is what is left if OpenAI pays for only part of what it signed (estimate).67
- At $130.67 the price is 7% above my base value and my base returns 10.3% a year, so the price pays for about $205B of FY2030 revenue where I model $190B and Oracle targets $225B or more; the odds are unusually wide, and my margin-of-safety price is $70 (estimate).16
Six questions, one line each
- Why
- Because a 49-year-old database company now holds $664B of signed contracts, 9.3 times its revenue, mostly for AI computing it has yet to deliver. Cloud was 60% of revenue last quarter.34 →
- The moat
- Two different answers. The database and the ledgers are very hard to remove. The AI halls are not protected by much beyond speed, and they are paid on a cost-plus basis.28 →
- The advantage
- It delivered 850 MW in a quarter and runs GPUs at 97.9% utilization. Its cost of money is the weak point: Press reports say S&P rates it BBB-, one notch above junk; I did not open S&P's report, and I did not check Moody's or Fitch.9421 →
- Management
- Paid on revenue and operating income, neither of which charges for capital. The founder owns 38.2% and has 413M shares pledged. The new CEOs hold options struck at $308.46.12 →
The business
Oracle has three businesses and reports them as cloud and software, hardware, and services. Cloud and software was 88% of revenue over the last four quarters.3 That label hides what matters. Inside it sit an old annuity, a good software business and a new capital-heavy one, and they have almost nothing in common financially.
Revenue in the twelve months to 31 August 2026 was $71.8B, up 22% on a year earlier (calculated). Operating income was $23.1B and net income $18.9B (calculated). TTM on this page means those four quarters. Fiscal years end on 31 May, so FY2030 ends in May 2030.2319
Revenue and net income
Fiscal years to May, US$ billions
- Revenue $67.4B in FY2026
- Net income $17.1B
Show the numbers
| FY2016 | FY2017 | FY2018 | FY2019 | FY2020 | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 | TTM | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Revenue (calculated) | $37.0B | $37.8B | $39.4B | $39.5B | $39.1B | $40.5B | $42.4B | $50.0B | $53.0B | $57.4B | $67.4B | $71.8B |
| Net income (calculated) | $8.9B | $9.5B | $3.6B | $11.1B | $10.1B | $13.7B | $6.7B | $8.5B | $10.5B | $12.4B | $17.1B | $18.9B |
What it sells
- Software support, $19.8B in FY2026. Customers who bought a database or application license pay every year for updates and help. Oracle says substantially all of them renew. This line has been flat for three years and fell 1% last quarter.23
- Cloud applications, $15.9B. Fusion for finance and HR, NetSuite for smaller companies, and industry suites, including Oracle Health. Up 10% last quarter, with Fusion up 14%.249
- Cloud infrastructure, $18.1B in FY2026 and $7.4B last quarter alone, up 121%. This is rented computing. It includes AI capacity sold to model builders, and it also includes the cloud database, which management says is growing well above 50%.248
- Software licenses, $4.7B, falling. Hardware, $3.1B. Services, $5.7B.2
Revenue by line, quarter by quarter
Fiscal quarters, US$ billions
- Cloud infrastructure
- Cloud applications
- Software, hardware and services
Show the numbers
| Q1 ’26 | Q2 ’26 | Q3 ’26 | Q4 ’26 | Q1 ’27 | |
|---|---|---|---|---|---|
| Cloud infrastructure (reported) | $3.35B | $4.08B | $4.89B | $5.79B | $7.39B |
| Cloud applications (reported) | $3.84B | $3.90B | $4.03B | $4.13B | $4.22B |
| Software, hardware and services (calculated) | $7.74B | $8.08B | $8.28B | $9.27B | $7.74B |
The backlog
Remaining performance obligations, or RPO, are contracted revenue not yet earned. They were $46.6B in May 2022, $137.8B in May 2025 and $664B in August 2026.203 More than 90% is infrastructure.8 That is 9.3 times TTM revenue (calculated). Oracle calls it one of the largest in the industry. It cuts both ways: it is an order book, and it is also a very large promise by a small number of counterparties.
Remaining performance obligations
US$ billions at period end
- RPO $664B
Show the numbers
| May 2021 | May 2022 | May 2023 | May 2024 | May 2025 | May 2026 | Aug 2026 | |
|---|---|---|---|---|---|---|---|
| RPO (reported) | $41.3B | $46.6B | $67.9B | $97.9B | $137.8B | $638.0B | $664.0B |
When the backlog turns into revenue
Oracle’s schedule at 31 August 2026, and what it means per year.
| Window | Share | Amount | Per year |
|---|---|---|---|
| Next 12 months (reported) | 13% | $86B | $86B |
| Months 13 to 36 (reported) | 37% | $246B | $123B |
| Months 37 to 60 (reported) | 34% | $226B | $113B |
| After that (reported) | 16% | $106B | Not stated |
Read that table slowly, because it answers a question the headlines skip. FY2030 runs from month 34 to month 45 of this schedule. The two windows around it average $123B and $113B a year (calculated). Even if the backlog peaks there, it probably covers something like $115B to $150B of that year (estimate). Oracle’s target is $225B or more.36 The rest has to come from three places: support, applications and other business that sits outside a long contract, which I put near $55B (estimate); contracts not yet signed; and any repricing under the cost-plus terms. The target is reachable. It is also more than the backlog alone delivers.
How it got here
For a decade this was a business that returned cash. Revenue barely moved between FY2016 and FY2021, and Oracle spent $101.7B on buybacks in those six years (calculated).20 The change came in steps. In June 2022 it closed Cerner. In FY2025 capital spending jumped to $21.2B. In September 2025 Safra Catz stepped aside, and Clay Magouyrk, who ran the cloud, and Mike Sicilia, who ran industries, became co-CEOs. In the same month the RPO reached $455B on what press reports described as a roughly $300B agreement with OpenAI, a figure Oracle’s filings do not state.2015324
The stock went with it, both ways. It closed at $328.33 on 10 September 2025, fell to $114.99 on 24 July 2026 and closed the last session at $130.67. It rose 10.7% on 28 October, the day of the Investor Day, and gave back all but 14 cents of that in two sessions.1
The moat
The honest way to read this business is in two halves, and they deserve different grades.
The old half
An Oracle database holds the records a bank or an airline cannot lose. Applications are built on it over decades, and moving off means rewriting them and accepting the risk of being wrong. Support customers pay a fixed percentage of what they once paid for the license. That is why $19.8B a year renews with so little effort, and why Oracle spends relatively little to keep it.2
The same holds for the ledger. A company’s finance system has its close calendar, its audit trail and its tax logic inside. Management said on stage that about half of its ERP customers are still on-premises, and that moving one to its cloud brings three to four times the revenue. It also claims AI agents cut migration time by 50% to 70%. I treat those as company claims, but the direction fits the 10% to 14% growth the filings show.89
What protects this half is switching cost. What threatens it is slower. Software support fell 1% in the latest quarter, licenses fell 15%, and SaaS growth has settled near 10%.4 An owner has to ask what a world of AI agents does to seat-based software. Oracle argues agents run on top of its systems of record. I think that is more likely right than wrong for finance and for the database, and less sure for everything else. I cannot judge this with precision, so my cases keep this half at 4% to 5% growth a year and change little across them.
The new half
The AI halls are a different kind of asset. Oracle does not own land or buildings; it leases the shell and the power, and it buys the chips, memory and network, which it runs for a customer on a contract averaging five years.7 Management says effectively all large AI contracts are cost-plus or similar. If memory prices rise, revenue rises and margin holds.8 That protects the margin. It also tells you who holds the power in the deal. A cost-plus contract is how a contractor is paid. A franchise sets its own price.
Is there any lasting edge? Three things are real. The network design lets Oracle split a cluster among many tenants or run it as one. It runs 70 multicloud database regions inside other companies’ clouds, so the database goes where the customer already is, and that business grew 353% last quarter.9 And a customer that has run on Oracle’s database for 20 years will often buy Oracle’s compute next to it. That last link is the best argument for the new half. It applies to enterprises, though, and most of the backlog comes from model builders, who are the most capable buyers on earth and will move for price when their contract ends.
So the table below is my view. The company earns very good returns on the old half, and on the new half it earns a contract return, which is the subject of the valuation section.
Three business models, one income statement
Slide 12 of the Investor Day, with my reading of how durable each one is.
| Growth | Capital needed | Gross margin | What protects it | |
|---|---|---|---|---|
| Cloud applications (reported) | Double digit | Low | Very high | Switching cost; a system of record |
| Cloud database (reported) | Well above 50% | Moderate | Very high | Decades of data; now sold inside rival clouds |
| Infrastructure (reported) | Hypergrowth | Very high | Lower; about 35% on a project | Speed of delivery and a contract, with little else after year five |
Oracle’s slide shows operating margins closing to a similar level across the three. That is true of a fully ramped project, before the charge for the capital tied up in it. A business that earns 34% on revenue with $2.30 of capital per dollar of revenue is a very different thing from one that earns 34% on almost no capital.7
The competitive advantage
Where Oracle beats its competitors today is execution. It delivered 850 MW of AI capacity in the first quarter, which it says is 73% of everything it delivered in the prior fiscal year, and more than 300,000 GPUs. OpenAI accepts capacity at Abilene within about 24 hours, and availability is above 99%.498 GPU utilization was 97.9%.9 Oracle has told investors these figures for several quarters, and revenue has followed: cloud infrastructure growth went from 55% to 68%, 84%, 93% and 121% in five quarters.4
The advantage on the customer side is also real. Oracle can price a cluster as a site and fit a customer’s own chips into it. It says it runs AMD, Intel, NVIDIA and Ampere processors today, and analysts at the Investor Day asked about its news on hosting Google’s TPUs.8 Bring-your-own-hardware deals mean a customer pays for the GPUs and Oracle provides the hall, the network and the operation. In June it said prepaid and customer-supplied hardware in its large contracts totaled $75B.5
Where it loses is the price of money. Compare the same dollar of capital spending at three kinds of owner. A hyperscaler funds a data center from its own cash flow and sells the capacity to itself first. A smaller specialist borrows against its contracts. Oracle sits between them, with investment-grade bonds at the lowest rung, a 6.70% coupon on 30-year notes issued in February, and its entire free cash flow going the other way.1721 In a business where the product is similar and the customer negotiates hard, the lowest cost of capital tends to win over a long enough period. That is a structural disadvantage, and I would not expect execution to erase it.
Where Oracle stands against the alternatives
My reading, from filings and the Investor Day. Not a ranking of companies.
| Oracle | What a rival has | |
|---|---|---|
| Data gravity | Oracle Database and the ledgers | Microsoft and AWS have their own databases, and SAP has its own ledger base |
| AI capacity speed | 850 MW in a quarter, 97.9% utilization9 | Scale in every region and in-house chips at the largest rivals |
| Chip choice | NVIDIA, AMD, TPUs, customer-owned8 | Several rivals build their own silicon, which lowers their cost |
| Cost of capital | BBB- per press reports of S&P21; 30-year debt issued at 6.70%17 | Stronger ratings and positive free cash flow at the largest rivals |
| Who pays | Roughly half of RPO from one customer, on S&P’s estimate21 | Thousands of customers and their own internal demand |
The 10-K states that no single customer accounted for 10% of revenue in FY2026.2 That was true of the revenue already earned. The backlog looks nothing like the revenue, and Oracle’s filing adds that in certain infrastructure offerings it is more concentrated among a number of large customers.2 Management said it has diversified the backlog in each of the past four quarters and that it has more than 1,000 AI customers.78 It does not publish the shares. S&P’s figure of about half is an estimate, repeated widely, and I use it for that reason only. Oracle has never confirmed it.21
Management
Three people run Oracle, and one of them owns it. Larry Ellison founded the company in 1977, is Executive Chair and Chief Technology Officer, and holds 38.2% of the shares. Clay Magouyrk, 40, came from Amazon’s cloud team in 2014 and built Oracle’s. Mike Sicilia came through the industry applications. They became co-CEOs in September 2025. Hilary Maxson joined as CFO in April 2026 from Schneider Electric, so the funding plan presented this month is the work of someone six months in the seat.121516
How they are really paid
What the pay plan rewards
From the 2026 proxy. Pay pays for what it measures; neither main measure charges for capital.
| Person | FY2026 award | Strike or test | What it pays for |
|---|---|---|---|
| Clay Magouyrk (reported) | $250M of options, $621.7M on the accounting value | $308.46; 80% time-based, 20% on revenue | Staying, and a share price 136% above today (calculated) |
| Mike Sicilia (reported) | $100M of options, $248.7M on the accounting value | $308.46; same split | Same |
| Larry Ellison (reported) | $50M of options, $117.8M on the accounting value; salary raised from $1 to $950,000 | $280.07; same split | Staying, and a share price 114% above today (calculated) |
| Hilary Maxson (reported) | $26M of equity intended, 80% time-based | $185.35 on the options | Staying, and a share price 42% above today (calculated) |
| Top team bonus (reported) | $5M target; $4.85M paid | Growth in non-GAAP operating income | Profit before stock pay, before interest, before any charge for capital |
Follow the incentive. The performance options test one number: FY2028 non-GAAP revenue. At $100B, 80% vest. At $125B, 100% vest. At $250B, 200% vest.12 Oracle’s own plan last October was $130B for FY2028, and this year it guides at least $90B for FY2027.104 So the full target sits below the company’s published plan, and the threshold sits about 11% above this year’s guidance.
Revenue here can be bought with capital. Nothing in the plan looks at return on that capital, free cash flow, debt or dilution. The bonus is the same: operating income growth, which is untouched by interest cost, and which leaves out stock pay.12 I am not saying anyone has behaved badly. I am saying that if you wanted a pay plan that pushed managers to build as fast as they could with other people’s money, it would look a lot like this one. The cushion is the option strike. At $308.46 the CEOs do badly unless the stock more than doubles, and that makes them care about the share price, which depends on the funding.
How much of their own money is in
Ellison’s stake is worth about $151B at the close (calculated). That is alignment on a scale few companies can show, and it is why I take his judgment seriously. There are two details. He has pledged 413M shares, 36% of his holding, against personal loans, and the board says he could repay them without selling.12 And on 22 June 2026, with the stock at $175.07, he adopted a plan to sell up to 50M shares. On 12 September Oracle announced that he had cancelled it, that none had been sold, and that he has no other plan to sell.313 The stock was at $150.28 on the last close before that. I read the cancellation as a reassurance to the market, and the adoption as evidence that even he wanted some liquidity in June. I do not know why he adopted it.
The others own far less. The proxy lists Magouyrk at 898,530 shares and Sicilia at 467,499, each including options due to vest, and Maxson at none, as she was new. That is about $117M and $61M at the close, against option awards several times larger (calculated).12 Directors and officers as a group, excluding Ellison, are under 0.3%. With 38.2% of the vote, Ellison cannot be outvoted in practice. The two directors who retired in January were 86 and 87.14
What they did with capital over a full cycle
Oracle’s record gives a real test, because it has now done both sides of the trade. From FY2019 to FY2022 it spent $92.6B to retire 1.61B shares, at an average of about $57.50 each (calculated). Diluted shares fell from 4,238M in FY2018 to 2,786M in FY2022.20 This was a very good use of money for anyone who stayed. In the first quarter of FY2027 it sold 141M shares through the market at about $142.3 Buying at $57.50 and selling at $142 is a fine result on those shares, and the buyers of those shares are now under water.
The other side of that record is the balance sheet it left. The buybacks were partly paid with debt, which rose from $60.6B in FY2018 to $75.9B in FY2022, and shareholders’ equity went negative, at −$5.8B in FY2022.20 Then came Cerner for about $28B in cash and more debt.20 So Oracle entered the largest investment in its history having already spent its cushion. It stopped buying back stock in FY2023. Had it kept half of that $92.6B, the funding question that took the stock from $328 to $115 would be much smaller. Hindsight is cheap, but this is what a full cycle means.
Where the cash went
Fiscal years to May, US$ billions
- Capital spending
- Buybacks
- Dividends
Show the numbers
| FY2016 | FY2017 | FY2018 | FY2019 | FY2020 | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 | TTM | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Capital spending (calculated) | $1.2B | $2.0B | $1.7B | $1.7B | $1.6B | $2.1B | $4.5B | $8.7B | $6.9B | $21.2B | $55.7B | $75.7B |
| Buybacks (calculated) | $10.4B | $3.6B | $11.3B | $36.1B | $19.2B | $20.9B | $16.2B | $1.3B | $1.2B | $0.6B | $0.1B | $0.0B |
| Dividends (calculated) | $2.5B | $2.6B | $3.1B | $2.9B | $3.1B | $3.1B | $3.5B | $3.7B | $4.4B | $4.7B | $5.8B | $5.9B |
Oracle has cut, too. Employees fell from about 162,000 to about 141,000 in a year, and the restructuring plan has grown to about $2.8B.1823 Management’s stated order of priorities is the investment-grade rating first, the dividend second and growth third.7 The dividend costs about $6B a year while the company raises outside money, so in practice part of it is paid with borrowed cash. Also, in June it said it did not expect to issue more debt in calendar 2026, and in October it said the $10B of new debt could come as early as calendar 2026.58 A small change, and worth watching in a management team asking for trust on a much larger number.
The promise made on 28 October is checkable, which I give them credit for: $20B of new capital and no more through FY2030. Maxson called that a real commitment.8 The record will be whether it is kept when a large new contract arrives.
Financials
Every number on this page starts from three facts about the last twelve months. Oracle earned $18.9B. It collected $46.9B of operating cash. It spent $75.7B on equipment.23
Ten years of Oracle
US$ billions unless marked. Fiscal years to May. TTM is the four quarters to 31 August 2026, calculated. Diluted shares in the TTM column are the latest quarter.
| ’16 | ’17 | ’18 | ’19 | ’20 | ’21 | ’22 | ’23 | ’24 | ’25 | ’26 | TTM | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Revenue (reported) | 37.0 | 37.8 | 39.4 | 39.5 | 39.1 | 40.5 | 42.4 | 50.0 | 53.0 | 57.4 | 67.4 | 71.8 |
| Operating income (reported) | 12.6 | 12.9 | 13.3 | 13.5 | 13.9 | 15.2 | 10.9 | 13.1 | 15.4 | 17.7 | 20.6 | 23.1 |
| Net income (reported) | 8.9 | 9.5 | 3.6 | 11.1 | 10.1 | 13.7 | 6.7 | 8.5 | 10.5 | 12.4 | 17.1 | 18.9 |
| Diluted EPS, $ (reported) | 2.07 | 2.24 | 0.85 | 2.97 | 3.08 | 4.55 | 2.41 | 3.07 | 3.71 | 4.34 | 5.83 | 6.38 |
| Operating cash flow (reported) | 13.7 | 14.1 | 15.4 | 14.6 | 13.1 | 15.9 | 9.5 | 17.2 | 18.7 | 20.8 | 32.0 | 46.9 |
| Capital spending (reported) | 1.2 | 2.0 | 1.7 | 1.7 | 1.6 | 2.1 | 4.5 | 8.7 | 6.9 | 21.2 | 55.7 | 75.7 |
| Free cash flow (calculated) | 12.5 | 12.1 | 13.6 | 12.9 | 11.6 | 13.8 | 5.0 | 8.5 | 11.8 | −0.4 | −23.7 | −28.7 |
| Stock pay (reported) | 1.0 | 1.4 | 1.6 | 1.7 | 1.6 | 1.8 | 2.6 | 3.5 | 4.0 | 4.7 | 4.8 | 4.8 |
| Depreciation (reported) | 0.9 | 1.0 | 1.2 | 1.2 | 1.4 | 1.5 | 2.0 | 2.5 | 3.1 | 3.9 | 7.6 | 9.4 |
| Interest expense (reported) | 1.5 | 1.8 | 2.0 | 2.1 | 2.0 | 2.5 | 2.8 | 3.5 | 3.5 | 3.6 | 4.6 | 5.1 |
| Dividends paid (reported) | 2.5 | 2.6 | 3.1 | 2.9 | 3.1 | 3.1 | 3.5 | 3.7 | 4.4 | 4.7 | 5.8 | 5.9 |
| Buybacks (reported) | 10.4 | 3.6 | 11.3 | 36.1 | 19.2 | 20.9 | 16.2 | 1.3 | 1.2 | 0.6 | 0.1 | 0.0 |
| Debt at year end (reported) | 43.9 | 57.9 | 60.6 | 56.2 | 71.6 | 84.2 | 75.9 | 90.5 | 86.9 | 92.6 | 129.5 | 125.3 |
| Diluted shares, M (reported) | 4,305 | 4,217 | 4,238 | 3,732 | 3,294 | 3,022 | 2,786 | 2,766 | 2,823 | 2,866 | 2,914 | 3,000 |
Revenue grew 6.2% a year over the decade, and 10.5% a year since FY2023 (calculated). Operating margin was 34.0% in FY2016 and 30.6% in FY2026 (calculated). The last line is what used to make the story work: EPS rose 10.9% a year from FY2016 to FY2026 (calculated), with a third fewer shares doing it.20
Cash, and why reported free cash flow misleads in both directions
Operating cash flow and capital spending
Fiscal years to May, US$ billions
- Operating cash flow
- Capital spending
Show the numbers
| FY2016 | FY2017 | FY2018 | FY2019 | FY2020 | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 | TTM | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Operating cash flow (calculated) | $13.7B | $14.1B | $15.4B | $14.6B | $13.1B | $15.9B | $9.5B | $17.2B | $18.7B | $20.8B | $32.0B | $46.9B |
| Capital spending (calculated) | $1.2B | $2.0B | $1.7B | $1.7B | $1.6B | $2.1B | $4.5B | $8.7B | $6.9B | $21.2B | $55.7B | $75.7B |
The reported −$28.7B overstates the damage, because most of that spending is growth. It also understates it, because operating cash flow includes $16.0B of prepayments that are really customers lending Oracle money against future service.34 They count as cash now and revenue later, with no cash then. On the balance sheet, deferred revenue doubled in one quarter to $30.8B.3 So I rebuild the number.
What an owner can really take out
Ask one question: if the building stopped today, how much cash could the owner carry away each year and leave the business as it stands? Take operating cash flow, remove the prepayments, charge stock pay as the cost it is, and charge depreciation as the floor for replacing what wears out.
From net income to owner cash
TTM to 31 August 2026, US$ billions.
| Line | Amount | Why |
|---|---|---|
| Net income (calculated) | $18.9B | As reported; includes a $2.7B gain on selling Ampere in Q2 FY2026 |
| Operating cash flow (calculated) | $46.9B | Larger than net income mostly on depreciation and deferred revenue |
| Less customer prepayments (calculated) | −$16.0B | Financing from customers, on Oracle’s own separate line |
| Less stock pay (calculated) | −$4.8B | Paid in shares, and the shares are real |
| Less depreciation, the replacement floor (estimate) | −$9.4B | Equipment wears out in about six years, and the run rate is already $12.6B |
| Stand-still owner cash (estimate) | $16.7B | 88% of net income; a 4.0% yield on diluted market value |
| Less growth spending above depreciation (calculated) | −$66.2B | What the build actually costs this year |
| Owner cash today, after the build (calculated) | −$33.5B | Free cash flow less stock pay; the prepayments are in here |
So reported earnings of $18.9B are not far from what the business could pay out if it stopped growing, $16.7B. What it actually pays out is nothing. Outside money covers the dividend and the build. The stand-still figure uses a $9.4B depreciation that lags: on the latest quarter’s run rate it would be $12.6B (calculated). If that is the true cost of standing still, the number is closer to $13.5B (estimate). I show $16.7B as the top of a range I cannot narrow further.3
Debt, leases and what sits off the balance sheet
Debt
Notes and other borrowings at period end, US$ billions
- Debt $125.3B
Show the numbers
| FY2021 | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 | Aug 2026 | |
|---|---|---|---|---|---|---|---|
| Debt (calculated) | $84.2B | $75.9B | $90.5B | $86.9B | $92.6B | $129.5B | $125.3B |
Who has a claim ahead of the shareholder
At 31 August 2026.
| Claim | Amount | Note |
|---|---|---|
| Notes and other borrowings (reported) | $125.3B | Fair value of $105.7B on $125.0B of notes, about 85 cents on the dollar; 89 cents in May (calculated) |
| Cash and marketable securities (reported) | $37.1B | Plus $2.6B of restricted cash |
| Net debt (calculated) | $88.3B | 2.6 times TTM EBITDA of about $34B (calculated) |
| Finance leases (reported) | $9.2B | On the balance sheet |
| Operating leases (reported) | $34.6B | On the balance sheet; $48.1B undiscounted |
| Leases signed, not yet started (reported) | $288B | Off the balance sheet; start between Q2 FY2027 and FY2029; 15 to 19 years |
| Purchase commitments (reported) | $34.2B | Up from $13.3B in May |
| Deferred revenue (reported) | $30.8B | Of which $16.0B is hardware prepayments (calculated) |
| Series D mandatory convertible (reported) | $5.0B | Converts in January 2029 into 25M to 31M shares; 6.50% dividend |
The line that matters most is the one that does not appear on the balance sheet. Oracle has signed $288B of leases on data centers, for 15 to 19 years, to serve contracts averaging five years.37 That is about $17B of rent a year once they start (calculated). It went up $28B in a single quarter. The contract with the customer ends long before the contract with the landlord.
Interest cover is fine today. EBITDA was about 6.6 times TTM interest of $5.1B, against the 3.0 times in the new $10B credit line (calculated).23 Interest expense rose 55% on a year earlier in the last quarter, to $1.4B.3 Bondholders have already moved: the notes were at 89 cents in May and 85 cents in August on the 10-Q’s fair-value disclosure (calculated).23
Valuation
Start with what would ruin it
Before any value, I want to know how an owner loses most of the money here. Three ways stand out, and the valuation is built backward from them.
First, the largest customer cannot pay.
S&P estimates OpenAI at roughly half of the $638B of RPO it measured in May, as the press reports it; Oracle does not state the share.21 Applied to August's $664B, half is about $330B (calculated), and NPR reports a promise of about $300B over five or so years.24 The Financial Times reported OpenAI's annualized revenue at about $50B at the end of September, a figure Eisman cited.23 A presentation reported by the Financial Times shows $856B of compute and $278B of negative free cash flow from 2026 to 2030, on the assumption that revenue reaches $350B in 2030. It raised $122B in March, which the FT reports would last until 2028.25 These are press accounts of a private company, and I cannot audit them. The plain arithmetic is that one customer with $50B of revenue owes one supplier something like $60B a year at peak (estimate), and that same customer has commitments to several others. If it renegotiates, Oracle holds the rent.
Second, the funding door shuts before the cash turns.
The worst stretch is the next 18 months. Press accounts say S&P cut Oracle to BBB- on 9 July, with a stable outlook, and said it could cut again if leverage stays above 4.5 times on its measure, or if Oracle is not on a path to positive free operating cash flow by FY2029.21 That is secondhand: I read it in the press and did not open S&P's report. Moody's and Fitch also rate Oracle, and I left their ratings out because I did not open their own releases. A cut below investment grade would raise the cost of debt, and the 10-K warns it could affect data center leases and bring collateral calls.2 Oracle’s $20B cap depends on vendor financing, prepayments and customer-owned hardware doing about half the work.7 Those three depend on suppliers and customers that have their own balance sheets to mind.
Third, a five-year contract meets a nineteen-year lease.
At year five the customer can leave. The hardware is old, the rent runs for another decade or more, and a rival may have newer chips in a cheaper hall. Management argues the opposite: in its view, today’s data centers will look cheap in five years, because replacing them will cost more.8 I think that is plausible for power and shells, and less sure for GPUs.
Each of the three is a way to lose most of the equity, and they share a cause, so they are likely to arrive together. Anything that hurts OpenAI also hurts the funding and the second contract. Keep that in mind when the numbers below look tidy.
What a gigawatt really earns
On 28 October Oracle published the economics of one gigawatt, which is the most useful page it has released in years. About $80B of contract value over five years, $37B of capital spending in the first two years, $16B of revenue a year once ramped, 35% gross margin, 34% operating margin, and what it calls a return on investment of about 28%.7
That 28% needs reading. The footnote defines it as after-tax operating profit plus depreciation, divided by capital spent. Adding back depreciation means counting the return of your money as a return on it. On those figures, after-tax operating profit is about $4.5B a year on $37B, or 12.1% (calculated). The 28% is a cash payback rate: $10.4B a year pays back the $37B in about 3.6 years (calculated). Management’s reason for adding depreciation back is that upkeep spending is limited until the hardware is replaced, which is true, and that is exactly the point. The replacement comes.78
The return on one gigawatt, depending on how long it earns
Yearly return on $37B, my calculation from Oracle’s slide. No value after the last year.
Show the numbers
| Return | |
|---|---|
| Oracle’s stated ROI (reported) | 28% |
| After-tax profit on capital (calculated) | 12.1% |
| 4 years of service, nothing after (estimate) | 3.3% |
| 5 years of service, nothing after (estimate) | 9.0% |
| 6 years of service, nothing after (estimate) | 12.7% |
| 7 years of service, nothing after (estimate) | 15.3% |
| 8 years of service, nothing after (estimate) | 17.2% |
| My discount rate (estimate) | 11.0% |
Here is the simple version. The first contract alone returns about 9% (estimate). That is above what Oracle pays on its 30-year debt and below what I ask of the equity. So the whole question for an owner is the sixth, seventh and eighth years. If the hardware earns for six years the project clears my 11.0% rate. Eight years gives 17.2% (estimate). The best evidence is on Oracle’s side: it said GPUs up for renewal in the first quarter, the majority four years or older, renewed at a 20% premium.9 The evidence is thin, though, since those are small fleets from a shortage, and the first very large contracts do not come up until after 2030. Nobody can know this yet, so I show the range instead of one number.
What the price implies
At $130.67 my base case returns 10.3% a year, a little below the 11.0% I require. The bear returns 1.1% and the bull 15.4% (estimate). I compare each with my own rate first and the 4.94% ten-year Treasury yield second.128
Ways to read the price
What $130.67 needs to be true. Multiples and returns are my estimates on the company’s outlook and my cash flows.
| Reading | What the price needs |
|---|---|
| Price to FY2030 target (calculated) | 6.2 times $21, Oracle’s non-GAAP target6 |
| Price to FY2027 guidance (calculated) | 16.1 times $8.10 non-GAAP4 |
| Price to consensus (calculated) | 19.4 times Nasdaq’s FY2027 mean of $6.72, 14.2 times FY2028 at $9.21 and 10.1 times FY2029 at $12.98; basis not stated, and FY2030 has only one estimate31 |
| Trailing earnings (calculated) | 20.5 times TTM GAAP EPS of $6.38 |
| Stand-still owner cash (estimate) | A 4.0% yield on $16.7B and a diluted market value of $414B, against a 4.94% Treasury28 |
| Enterprise value (estimate) | About $518B, 7.2 times TTM revenue, before the rent that is coming |
| FY2030 revenue (estimate) | About $205B at my base margins and capital, against $190B in my base and $225B or more in Oracle’s target |
| Odds between my bull and bear (estimate) | If those were the only two outcomes, the price says 57% for the bull |
The 6.2 times is the number bulls quote, and it deserves an answer. Earnings in FY2030 would come from hardware bought in FY2027 and FY2028, in contracts that end around FY2032 to FY2033. They carry a depreciation charge that understates the next cycle’s bill if prices rise, and they sit on debt and leases that come first. A multiple of 6 on those earnings is low. Compare it with the 4.0% stand-still yield today and the picture changes: the buyer is paying for four years of a build that has to go right, and then a low multiple on what comes out. If the $21 arrives on time, the price will have been low for those earnings, and my bull value of $195 reflects that. On about $8B of yearly interest and today's diluted share count, my bull earnings come to about $20.90 a share in FY2030 and $16.00 in FY2029, which match Oracle’s published path (estimate).10 So the disagreement is about the odds of $21, and only a little about what it is worth.
The reverse DCF starts from the $16.7B of stand-still owner cash. First I take off $150B, the present cost of what my base spends above depreciation through FY2029. Then I solve for one growth rate for ten years, at 11.0%, with 3.0% growth after that. The price needs 18.0% a year (calculated). Stand-still cash grew 2.4% a year from FY2016 to FY2026 (calculated), and my base grows 14.7% a year from the same start (estimate).203
What the price assumes
Growth in owner cash a year for ten years, from a start of $16.7B.
Show the numbers
| Growth a year | |
|---|---|
| What the price implies (calculated) | 18.0% |
| History (calculated) | 2.4% |
| My base (estimate) | 14.7% |
The discount rate
I use 11.0%, above the 10.5% on Broadcom and Amazon and the 10.0% on Alphabet. Oracle’s beta against the S&P 500 is 1.29 on ten years of month-end returns, 1.78 on five and 2.94 on two (calculated). The capital asset pricing model, with the 4.94% ten-year Treasury and Damodaran’s 4.20% implied premium, gives 10.4% to 12.4% on the first two.282930 The recent number measures a stock caught in a funding scare, and I give it little weight. I use one rate on unlevered cash flows and deduct net debt. Oracle’s capital is about 80% equity at market, so a cost of equity near 12.4% and after-tax debt near 5.7% blend to about 11% (estimate). One point on the rate moves the base by 17% to 23%, so treat this as the largest single judgment on the page.
My base case at other rates
Value per share; discount rate down the side, growth after FY2036 across the top.
| Discount rate | 2.5% | 3.0% | 3.5% |
|---|---|---|---|
| 10.0% (estimate) | $144 | $150 | $156 |
| 10.5% (estimate) | $130 | $135 | $140 |
| 11.0%, my rate (estimate) | $118 | $122 | $127 |
| 11.5% (estimate) | $108 | $111 | $115 |
| 12.0% (estimate) | $98 | $101 | $104 |
The three cases
Bear, base and bull
Fiscal years to May. All my estimates except where the target is Oracle’s. Capital spending is charged in full when bought, however it is financed.
| Bear | Base | Bull | Oracle’s target | |
|---|---|---|---|---|
| The story | OpenAI pays for part; capacity is re-let for less; rent stays | The contracted build arrives about three quarters late; OpenAI pays, slowly | Oracle hits its targets, and hardware recontracts near par | |
| FY2027 revenue (estimate) | $87B | $90B | $92B | At least $90B4 |
| FY2028 revenue (estimate) | $106B | $120B | $130B | $130B, October 2025 plan10 |
| FY2029 revenue (estimate) | $121B | $155B | $185B | $185B, October 2025 plan10 |
| FY2030 revenue (estimate) | $130B | $190B | $225B | $225B or more6 |
| FY2036 revenue (estimate) | $137B | $274B | $372B | None given |
| Infrastructure margin, FY2030 (estimate) | 12% | 30.5% | 34.5% | About 34% on a ramped project7 |
| Non-GAAP margin, FY2030 (estimate) | 27% | 38% | 40% | 40% or more6 |
| Capital spending, FY2027 to FY2029 (estimate) | $196B | $260B | $260B | FY2027 $90B to $95B; about $220B illustrative for 6 GW97 |
| Owner cash, FY2029, before interest (estimate) | $33B | $24B | $40B | $30B or more of free cash flow, on Oracle’s definition6 |
| Value per share (estimate) | $44 | $122 | $195 | |
| Return a year at the price (estimate) | 1.1% | 10.3% | 15.4% |
Revenue in my three cases
Fiscal years to May, US$ billions
- Bull
- Base
- Bear
Show the numbers
| 2027 | 2028 | 2029 | 2030 | 2031 | 2032 | 2033 | 2034 | 2035 | 2036 | |
|---|---|---|---|---|---|---|---|---|---|---|
| Bull (estimate) | $92B | $130B | $185B | $225B | $258B | $286B | $311B | $334B | $354B | $372B |
| Base (estimate) | $90B | $120B | $155B | $190B | $212B | $228B | $242B | $254B | $265B | $274B |
| Bear (estimate) | $87B | $106B | $121B | $130B | $132B | $131B | $130B | $131B | $134B | $137B |
How I built the base. Oracle says about 10 GW by the end of FY2028, of which five are the large sites.7 Fully ramped at about $16B a gigawatt on its own hardware and $11B on a customer’s, against the roughly $9B of revenue per gigawatt that today’s fleet earns (estimate), that supports something like $120B to $140B of infrastructure revenue (estimate). Oracle’s $225B needs about $166B, the figure it gave for FY2030 last year, because the other businesses add up to near $59B (estimate).11 So the headline number needs $16.6B on every gigawatt in the fleet, older ones included, or more gigawatts than the 10 (calculated). Maxson said some additional growth would come mainly after FY2028.8 My base has $190B for FY2030, and it reaches $274B in FY2036.
The margin check is reassuring. In the bull, $58B of other business at a 55.5% margin and $167B of infrastructure at 34.5% give 39.9%, which is the 40% target, so that target needs nothing heroic from the operating lines (estimate).6 In the base I hold infrastructure near 31% in FY2030 because I expect the later contracts to be tighter and some hardware to be idle during ramp-ups. Last quarter’s overall figure was 42%, and my base is 41% for the year and 37% to 38% from FY2028.9
The funding check is harder. From 1 September 2026 to 31 May 2028 my base burns $68B before interest. Add about $10B of after-tax interest and $11B of dividends and the need is near $89B (estimate). Sources: about $22B from cash, taking it to $15B, and the $20B of new capital. That leaves about $47B for vendor financing and prepayments (estimate), which fits inside the 50% cut Oracle describes on about $220B of spending.7 So the plan works on my base. It has limited room if prepayments stop, since one quarter’s prepayment was $11.4B and I cannot see how much more is contracted.3
A word on $30B. Before the event, data compiled by Bloomberg and FactSet showed analysts expecting this measure to stay deeply negative, so the target was a surprise.27 Oracle’s target is operating cash flow less capital spending. Its slide says vendor financing principal is a separate payment; the footnote places the interest in operating cash flow.7 If that principal sits in financing, as similar short-term items do today on its cash flow statement, the $30B is before those repayments, and before stock pay of about $6B (estimate).3 My base gets to about $23B for FY2029 on Oracle’s definition, and $17B after stock pay and interest (estimate). I cannot size the vendor repayments, because Oracle would not give the split. At one third of about $110B over five years they would be near $7B a year (estimate).8
What it is worth, against the price
Value per share in US dollars
Show the numbers
| Per share | Against the price | |
|---|---|---|
| Bear value (estimate) | $44 | −66% |
| Base value (estimate) | $122 | −6% |
| Bull value (estimate) | $195 | +49% |
| Weighted value (estimate) | $109 | −16% |
| Margin-of-safety price (estimate) | $70 | −46% |
From cash flows to a value per share
Base case, US$ billions unless marked.
| Line | Amount |
|---|---|
| Value of cash flows, Sep 2026 to FY2036 (estimate) | $193B |
| Value of everything after (estimate) | $298B |
| Debt, net of cash (calculated) | −$88.3B |
| Finance leases (reported) | −$9.2B |
| Hardware prepayments, treated as debt (calculated) | −$16.0B |
| Minority interests less investments, net (estimate) | −$0.6B |
| New equity, the $10B Oracle has committed to (estimate) | +$10.0B |
| Value of the equity (estimate) | $387B |
| Diluted shares (estimate) | 3.166B |
| Value per share (estimate) | $122 |
Shares are the 3,023.7M outstanding on 7 September, plus 34M for stock awards, 31.2M for the mandatory convertible at its maximum rate, and 76.5M for the $10B of equity at today’s price.32 Operating leases are not deducted, because the rent is in the margin. The $288B of unstarted leases are not deducted either, for the same reason; the cases pay that rent as they use the space. In the bear, some of it is rent on idle halls, which is why the infrastructure margin falls to 12%.
How the odds shrink
The strongest case for this stock needs several things to go right at once. Multiply them out, with my own rough odds.
What the top of the range needs
My judgment, not a measurement. Each line assumes the ones above it went right.
| Needs to happen | My odds |
|---|---|
| OpenAI pays in full, through FY2031 (estimate) | 60% |
| The large sites arrive within two quarters of plan (estimate) | 75% |
| Vendor financing and prepayments hold, with no new capital beyond the $20B (estimate) | 80% |
| Hardware recontracts near par in years six to eight (estimate) | 60% |
| All four (calculated) | 22% |
Four good-odds bets multiply to about one in five. That is why I weight the bull at 20%, the base at 45% and the bear at 35%, which gives $109 (estimate). The price, as noted, pays for 57% on the two-outcome view. The odds are mine, and a reasonable person could say 35% for the bull and 20% for the bear. Do that and the weighted value is about $132, about the price.
A stress with no probability
The bear keeps OpenAI as a partial payer. The stress removes it. Revenue from it stops in FY2029, infrastructure falls to about $50B in FY2030, and the margin there goes below zero for a year because the rent continues. Oracle cuts capital spending to $10B and lives on the older business. It is worth about $33 a share (estimate). It has no weight in the value. It also leaves out what such an event would do to the rating, the refinancing of $10.1B due in FY2028 and the terms of the leases, which I cannot model. The equity could be worth less. The older half of the business is the reason it is worth something: about $50B of revenue at a margin near 50% (estimate).2
My margin-of-safety price
My margin-of-safety price is $70, 43% below my base value. A flat 30% does not suit a company where the outcomes are this wide and debt sits on top. So I set it as the price at which the stress case, with the largest customer gone, still returns the 4.94% Treasury yield (estimate). At $70 the bear returns 7.1% and the base 16.4%. The price sits 87% above it. The lowest close in the past year was $114.99.1
What the price buys in each case
Value against the price, and the yearly return my cash flows give at that price.
| At a price of | Bear value | Base value | Bull value | Bear, base, bull return |
|---|---|---|---|---|
| $130.67, the price (reported) | −66% | −6% | +49% | 1.1%, 10.3%, 15.4% |
| $114.99, the lowest close of the past year (reported) | −62% | +6% | +70% | 2.4%, 11.6%, 16.7% |
| $70, the margin-of-safety price (estimate) | −37% | +75% | +179% | 7.1%, 16.4%, 21.8% |
The next best use of the same dollar
A dollar in this stock has to beat what else it could do. A Treasury pays 4.94% with no risk.28 Oracle’s own bonds are a better comparison than people admit. The 30-year notes issued in February carry 6.70%, and the book’s fair value has fallen since, so the yield today is higher, with a claim ahead of the shareholder.173 My base gives the shares only about 3.6 points more than that coupon, and my bear gives about 5.6 points less.
The same dollar elsewhere
Base returns at each page’s price. Each page has its own rate and method, so read these as rough.
| Use of the dollar | Bear return | Base return | Bull return |
|---|---|---|---|
| Ten-year Treasury (reported) | 4.94% | 4.94% | 4.94% |
| Oracle 30-year notes (reported) | Depends on recovery | 6.70% coupon, more at today’s price | Same |
| Alphabet, this site (estimate) | 5.38% | 8.27% | 10.87% |
| Oracle at $130.67 (estimate) | 1.1% | 10.3% | 15.4% |
Alphabet is the best comparison on this site, since it rents out the same capacity from its own cash. On my pages its base returns about two points less than Oracle’s, and its bear about four points more. Microsoft’s base is about 7.5%. Oracle pays you two points for a much wider spread of outcomes. Whether that is a fair trade depends on how you feel about the bear.3334
Quality and price, separately
These are two questions. The quality of the older half is high. The quality of the new half is unproven: a low-margin, capital-heavy contract business with one very large customer and a cost of money above its peers. Taken together I would call this a good business carrying a bet that may or may not be good. The price is a different matter. Against my base it is close, 7% above. It is not the clear overpayment that several pages on this site show, and it is far below where it was. It is also well above the point where you are paid for the risk of the bear. The market may well be right at $130.67, since a price near my base is what I would expect if it had read the same documents.
What I cannot judge
- OpenAI’s ability to pay. I have press accounts of a private company, and they have already been revised. It is the largest input on this page.
- The share of the backlog that is OpenAI. S&P’s estimate is the only number, and Oracle does not give one.
- GPU life. Nobody has run these chips at this scale for eight years.
- How vendor financing appears in the accounts. Oracle’s first quarters of doing this at scale will show it.
- What AI agents do to seat-based software by 2032.
Where this could be in 5 and 10 years
Value per share, years out
Value is the present value, at that date, of the owner cash that comes after it, per share on today’s 3.166B shares, in that year’s dollars, after net debt. Net debt grows with the cash the build burns, at 5.4% after tax, and is paid back to today’s $104B before anything is paid out. Dates are fiscal year-ends: May 2031 is 4.75 years out, May 2036 is 9.75.
| Case | Value, May 2031 | Value, May 2036 | Owner cash to May 2036 | Return a year to May 2036 |
|---|---|---|---|---|
| Bear (estimate) | $73 | $66 | $61 | −0.4% |
| Base (estimate) | $201 | $227 | $105 | 11.4% |
| Bull (estimate) | $306 | $365 | $149 | 17.3% |
The base stands at five years if the build lands about three quarters late and revenue reaches $190B in FY2030 at a 30.5% infrastructure margin. By May 2031 the heavy spending is behind Oracle, and the base earns about $68B a year of owner cash. That is why it rises from $122 to $201. It stands at ten years if revenue reaches $274B and Oracle keeps spending about $74B a year to keep the capacity current. Cash after FY2036 is 61% of the base value, so year ten rests on a long tail.
The bear and the bull differ on the largest customer and on margin. In the bear, OpenAI pays for only part of what it signed, capacity is re-let for less, and the infrastructure margin falls to 12%. The bear still rises to $73 by 2031, because spending ends in 2029. In the bull, Oracle hits its own targets, $225B in FY2030 at 34.5%. All three use an 11% discount rate and 3% growth after FY2036.
The most likely way the base is wrong is that the largest customer pays less, or later, than I assume. Revenue and margin would both slip, and the answer would move toward the bear.
The return column uses the price of $130.67, the owner cash and the year-ten value, so it differs from the returns above, which use unlevered cash. These are estimates of value, not forecasts of the share price. The market price can sit above or below value for years.
The case for the price
What most people miss
Three facts cut in Oracle’s favor. The first is that the new contracts are lighter than the old ones. In the first quarter it added more than $30B of AI contracts, and management says the vast majority came through prepayment or customer hardware, so they need no extra capital from Oracle. A customer-hardware gigawatt takes about $6B of capital against $37B, on $11B of revenue and a margin at least as good.497 The second is the 20% renewal premium on four-year-old GPUs. It is early, and it goes straight at the biggest doubt about the business.9 The third is the cost-plus term. Revenue per gigawatt went from about $10B to $16B in a year, largely on memory prices, with the margin kept. Oracle has passed through that inflation.8
The bull case
The case here comes from the company and its brokers. Maxson says the $20B completes the funding, that free cash flow turns positive in the second half of FY2028, and that the mechanics are in place rather than a forecast.78 Magouyrk says the data centers coming online now will look very cheap in five years, and that memory and chip supply cap the industry’s build, so a glut is unlikely for three to five years.8 After the event, Baird’s Rob Oliver called it “very positive” with a $215 target. Oppenheimer’s Brian Schwartz, at $275, said it “somewhat dents the credit risk concerns”. RBC’s Rishi Jaluria, at $165, called it “incrementally positive rather than thesis-changing”. All three come through TipRanks, so they are secondhand.26 On the other side, Steve Eisman said on 16 October that “half of Oracle’s backlog is just OpenAI”, also secondhand.23
Against reality
If Oracle delivers 7 GW, OpenAI pays and the funding lasts, $225B and $21 follow, and my model values that at about $195. That is possible. Abilene shows the work can be done: six of eight buildings delivered, and 121% growth. Today’s numbers are a long way off, though. TTM revenue is $71.8B and must triple in under four years. Four sites have yet to deliver their first service, and New Mexico still needs an air permit.98 Free cash flow must swing about $59B from TTM −$28.7B to FY2029’s $30B (calculated). A customer with $50B of revenue must fund commitments many times that.2325
What a 10x would take
Ten times the price is $1,307 a share, or about $4.1T of diluted market value (calculated). At 20 times earnings that needs $207B of net income. At a 30% net margin it needs about $690B of revenue (calculated). My bull has $372B of revenue and $110B of after-tax operating profit in FY2036 (estimate), so a 10x by then would need nearly twice my bull’s earnings. In the ten years to October 2026, split-adjusted, Apple rose 12.1 times and Microsoft 8.7 times, and both were larger then than Oracle is now; NVIDIA rose 115 times from a much smaller base.32 Oracle rose 3.4 times.1 It has happened, a few times, to the best companies in history. For a business with this much debt and one customer of this size, inside ten years, I regard it as close to impossible.
What they have to hit
The indicators, and where to track them
Thresholds match my bull case unless marked. Dates marked expected are my reading of Oracle’s usual calendar.
| Indicator | Today | What the case needs | Where to track it | Next check |
|---|---|---|---|---|
| Cloud infrastructure revenue | $7.4B in Q1, up 121%4 | At least $41B in FY2027; about $78B in FY2028 | Quarterly release, Supplemental Analysis of GAAP Revenues, Cloud Revenues by Offerings line | Q2 FY2027 release, December (expected) |
| RPO and the 12-month share | $664B; 13% due in 12 months3 | About half converted within 36 months, as Oracle says, and the 12-month share rising above 15% during FY2028 | 10-Q, Note 1, Remaining Performance Obligations | Q2 FY2027 10-Q, December (expected) |
| Free cash flow and net cash capex | −$5.4B in Q1; $18.0B net cash capex4 | FY2027 capex at or under $95B, net cash capex at or under $70B; positive free cash flow in H2 FY2028; $30B in FY2029 | Quarterly release, Free Cash Flow table and Net Cash Outlay for Capital Expenditures table | Each quarter; first H2 FY2028 test in March 2028 |
| New capital raised | $0 of the $20B since 28 October6 | No more than $10B of equity and $10B of gross debt through FY2030 | Forms 8-K and 424B on EDGAR; cash flow statement in the 10-Q | Any filing; each 10-Q |
| Prepayments in cash flow | $11.4B in Q13 | Continuing inflows through FY2028; a fall to near zero before capex peaks would widen the gap | 10-Q cash flow statement, line for prepayments with a significant financing component | Q2 FY2027 10-Q, December (expected) |
| Credit rating | BBB-, stable outlook, per press reports of S&P21 | Stays investment grade; S&P leverage back under 4.5 times; Oracle’s net debt under 3.5 times adjusted EBITDA in FY2029 | S&P Global Ratings press releases, free; Moody's and Fitch releases; Oracle’s Q4 FY2029 release | Any time |
Where I come down
The Investor Day moved me on funding: a hard $20B and a published gigawatt are more than I expected, and they took the funding failure out of my base. It did not move me on the customer or on year six, and those decide the value. Better disclosure of OpenAI’s share, or two more years of renewals at a premium, would raise my values more than any quarter of growth could.
Risks, and what would change my view
The valuation section covers the three ways this goes badly. These are the others, and the signals I will read.
- Delays and permits. New Mexico needs an air permit for fuel cells, and Wisconsin’s power is being arranged through the grid. Oracle’s targets allow for up to a couple of quarters on any site. Costs mostly move with the build.98
- Supply. An analyst at the Investor Day described Oracle as heavily weighted to one chip supplier, and Magouyrk would not discuss any supplier’s financing. Purchase commitments went from $13.3B to $34.2B in a quarter.832
- Prices for compute. Short-term prices are high now. Analysts at the Investor Day cited 40 GW of industry supply in 2027 and 60 GW in 2028. Magouyrk answered that memory and chip supply will cap what really gets built.8
- Stock pay and dilution. 141M shares were issued in one quarter, 5% of the count, on top of $4.8B a year of stock pay, and 77M more are implied by the $10B plan at today’s price (calculated).3
- Key people. Ellison is 82, and a co-CEO structure is new. His pledged shares tie part of his finances to the stock.12
- Litigation. A securities class action over statements about the cloud business names the company and executives; a motion to dismiss would be briefed by 18 December 2026.3
- Government and contract risk. The company holds 15% of the TikTok USDS joint venture and sells to governments across many countries.3
What would change my view
The figures I will check each quarter, today’s reading and the thresholds.
| Signal | Today | Raises my value | Lowers my value |
|---|---|---|---|
| Share of RPO from the largest customer | Not disclosed; about half on S&P’s estimate21 | Oracle states a figure below 40% | Any restructuring of a large contract |
| Infrastructure growth | 121%4 | FY2028 on $78B or better | FY2027 under $38B, or a slip in the second large site |
| Cash and funding | $37.1B of cash3 | Free cash flow positive before H2 FY2028 | Any raise above the $20B, or a structured deal on Oracle’s credit |
| Hardware renewals | 20% premium9 | Premiums repeated on five-year-old fleets | Renewals below the original price |
| Rating | BBB- per press reports of S&P21 | Outlook positive | Negative outlook, or any move to junk |
| Lease commitments | $288B3 | Growth slows while contracts grow | Growth ahead of RPO for a further year |
What would raise my base value: published proof of a diversified backlog, renewals that hold, and an extra gigawatt or two funded from cash. What would lower it: a restructured contract, new capital above the cap, or a first renewal at a discount. A lower price would not change my base. It would change the answer to whether the bear is paid for.
Sources
- 1ORCL daily closes, Nasdaq.com historical API, 31 October 2016 to 30 October 2026 (opens in a new tab)
- 2Oracle Form 10-K, year ended 31 May 2026 (opens in a new tab)
- 3Oracle Form 10-Q, quarter ended 31 August 2026 (opens in a new tab)
- 4Oracle Q1 FY2027 earnings release, Form 8-K Exhibit 99.1 (opens in a new tab)
- 5Oracle Q4 and FY2026 earnings release, Form 8-K Exhibit 99.1 (opens in a new tab)
- 6Oracle Investor Day 2026 press release, Form 8-K Exhibit 99.1 (opens in a new tab)
- 7Accelerating Shareholder Value, Hilary Maxson, Oracle Investor Day slides (opens in a new tab)
- 8Oracle Investor Day 2026 transcript (opens in a new tab)
- 9Oracle Q1 FY2027 earnings call transcript (opens in a new tab)
- 10Oracle Financial Analyst Meeting 2025, Doug Kehring slides (opens in a new tab)
- 11Oracle Financial Analyst Meeting 2025, Clay Magouyrk slides (opens in a new tab)
- 12Oracle 2026 proxy statement, Schedule 14A (opens in a new tab)
- 13Larry Ellison Cancels His Plan to Sell Oracle Stock, Form 8-K Exhibit 99.1 (opens in a new tab)
- 14Oracle Form 8-K, two directors retire (opens in a new tab)
- 15Oracle Form 8-K, new Chief Executive Officers (opens in a new tab)
- 16Oracle Form 8-K, Hilary Maxson appointed CFO (opens in a new tab)
- 17Oracle Form 8-K, equity distribution agreement and $25 billion of notes (opens in a new tab)
- 18Oracle Form 10-K, year ended 31 May 2025 (opens in a new tab)
- 19Oracle Form 10-Q, quarter ended 31 August 2025 (opens in a new tab)
- 20Oracle XBRL company facts (opens in a new tab)
- 21S&P cuts Oracle to BBB- as AI buildout widens cash deficit to $42bn (opens in a new tab)
- 22Oracle stock shrugs off S&P downgrade to BBB- (opens in a new tab)
- 23Big Short's Steve Eisman: Half of Oracle's Backlog Is Just OpenAI (opens in a new tab)
- 24Oracle's debt is growing. The tech giant's investors are concerned (opens in a new tab)
- 25OpenAI told investors in February its compute bill would be around $600bn (opens in a new tab)
- 26Oracle Stock (ORCL) Forecast: how analysts reacted to the FY30 outlook (opens in a new tab)
- 27Oracle Forecasts $30B Cash Flow By FY29 (opens in a new tab)
- 28US Treasury daily par yield curve rates, 2026 (opens in a new tab)
- 29Damodaran implied equity risk premium, 1 October 2026 (opens in a new tab)
- 30S&P 500 index daily close, Federal Reserve Bank of St. Louis (FRED series SP500) (opens in a new tab)
- 31ORCL consensus EPS forecasts, Nasdaq.com analyst API (opens in a new tab)
- 32MSFT, AAPL and NVDA daily closes, Nasdaq.com historical API (opens in a new tab)
- 33Alphabet, this site
- 34Microsoft, this site
How the figures are labelled
(reported)Reported: taken from a filing or a price feed, as printed.
(calculated)Calculated: arithmetic on reported figures, such as a margin or a growth rate.
(estimate)Estimate: my judgement, such as a case value or a growth assumption.
The price
Close in Q4 2026: $130.67, from Nasdaq's record of the NYSE listing [1]. Retrieved in Q4 2026.
Fiscal years end on 31 May. TTM is the four quarters to 31 August 2026: FY2026, plus Q1 FY2027, less Q1 FY2026. The second quarter of FY2027 reports after the price date.
The valuation
Cash flow before interest for the nine months left in FY2027 and for FY2028 to FY2036, discounted at 11.0% from 31 August 2026 at mid-period, then a normal year with 3.0% growth in perpetuity. Each year is built from infrastructure and other revenue, a margin on each, stock pay, 19% tax, depreciation, capital spending and a small working capital gain. Capital spending is charged in full when bought, however it is financed, so vendor financing is not added as debt. Rent is in the margins, so operating leases and leases not yet started are not deducted. Hardware prepayments received are treated as debt, and later revenue is counted in full. Net claims of $104.0B are debt less cash, finance leases, prepayments and minority interests, less investments and the $10B of committed new equity. Per-share values divide by 3,166M diluted shares, which count the mandatory convertible at its maximum rate and the new equity at the price. The normal year is after-tax profit less the investment needed for 3.0% growth on capital of 1.15 times revenue. The yearly returns are the rate that equates the price, with net claims, to the cash flows plus a year-ten value taken at 11.0%.
The margin-of-safety price is $70, the price at which my stress case returns the 4.94% ten-year Treasury yield. No rating: the page states a range and the price, and leaves the decision to the reader.
Research, not investment advice. Figures as of .
Legal information and disclosures
These are my own views as of the update shown on this page. They can change without notice, and I have no duty to update them. Past performance does not indicate future results, and any investment can lose money.
This is for education only. It is not investment, legal, tax or accounting advice, and it is not an offer to sell or a solicitation to buy any security in any jurisdiction. It does not consider your goals or circumstances.
Figures from company filings and other third parties are believed to be reliable, but I have not independently verified them and cannot guarantee them. Bear, base and bull values, and anything marked as an estimate, are my own and rest on assumptions that may prove wrong.
Please do not copy or republish this material without my written consent.