Investing№ 85Nasdaq: HIVE
HIVE Digital Technologies
HIVE, a Canadian bitcoin miner, signed about $600M of GPU cloud contracts this year, but its mining margin ends at the 2028 halving, loans take most of the early contract cash, and the price needs about 17 more clusters than my base.
Updated Fiscal year ends 31 March38 min readPedrum Shokouhi
Thin moat
Research, not investment advice. Figures as of .
Key numbers
- Revenue$331M (calculated)TTM Jun 2026; $115M in FY2025 [2][3]
- Owner cash flow−$232M (calculated)TTM Jun 2026, after $53M of bitcoin paid for equipment and stock pay [2][3]
- GPU contracts signedAbout $600M (reported)Company figure for three contracts this year; $225M with Cohere and Bell, $350M with an unnamed customer [4][5]
- Exchangeable notes$245M (reported)0% notes due 2031, $115M put April 2029 and $130M put July 2030 [6][7]
- Swedish VAT provision$84.7M (reported)SEK 822M, booked in the June quarter; counsel calls success remote [3]
- Cash$208M (reported)At 30 June 2026, before $174.5M of equipment commitments and a $186.9M order in July [3]
The answer
- HIVE is a Canadian bitcoin miner that is turning part of its power into AI cloud: since February it has signed three GPU contracts worth about $600M in total, while in the twelve months to June 2026 it took in $331M of revenue, lost $326M, and spent $232M more than it earned after stock pay (calculated).423
- I value it at $0.20 a share, in a range of $0.00 to $4.90, because mining stops paying once the April 2028 halving arrives, the two large GPU contracts earn about their cost of capital, a Swedish tax bill of $85M and $245M of exchangeable notes come ahead of shareholders, and the pipeline of new data centers is mostly a plan (estimate).358
- At $1.91 the price is 855% above my base value and 61% below my bull; to justify it HIVE would have to sign about 19 further GPU contracts of the August type, against the two in my base, and my margin-of-safety price is $0.10 (estimate).19
Six questions, one line each
- Why
- AI buyers want chips running in a hurry on cheap power, HIVE owns about 440 MW of power in three countries, and three customers have signed for 7,800 GPUs.94 →
- The moat
- Thin: mining is a commodity, and renting GPUs is a business with many sellers where HIVE has 29 employees and no named customer on its largest contract.25 →
- The advantage
- Power at about 4.5 cents in Paraguay and 5 cents in Canada, a site with 320 MW of allocated grid power, and lenders who will lend 80% of the cost of a contracted cluster at 9%.2104 →
- Management
- The executive chairman and the CEO each took $4.4M of stock for the year to March 2026 and own 1.1% and 0.7% of the shares; four insiders sold 894,200 shares since April and none bought.1112 →
The business
HIVE Digital Technologies is a British Columbia company run from San Antonio, Texas. It began in 2017 as a bitcoin miner and still earns nine dollars in ten that way.23 It rents out computing power to a mining pool, which pays it in bitcoin. It operates data centers in Paraguay, Canada and Sweden, fills them with machines made by Bitmain, and sells the result. Its fiscal year ends on 31 March, so the quarter to 30 June 2026 is what the company calls its “first quarter of fiscal 2027”. On this page I call it the June quarter. It has 29 employees.23
Since 2023 it has also rented out graphics chips, first old ones through online marketplaces and now the newest NVIDIA systems on long contracts. That unit is called BUZZ High Performance Computing, or BUZZ. The company says its aim is to use cash from mining to build BUZZ.3 The shares trade on Nasdaq and, since 12 May 2026, on the Toronto Stock Exchange.2 The company now files 10-Ks and 10-Qs in US dollars. It used to file annual reports on Form 40-F, as a foreign issuer.2
The old business: bitcoin mining
At 31 July 2026 HIVE had about 25.2 exahashes a second of installed mining power, 24.5 as it actually runs them, using about 393 MW of electricity at 16.1 joules a terahash.3 Paraguay holds 19 of the 24.5, in two plants, Yguazú and Valenzuela, that it bought and built in 2025. The rest sits in New Brunswick, Quebec and Sweden.3 Most of the machines were bought between December 2024 and November 2025, so they are young.3 In the June quarter the company earned 1,004 bitcoin worth $72.1M, at an average price of $71,682.3 Electricity cost $45.9M, or about 5.3 cents a kilowatt-hour (calculated), and all mining costs together were $51.0M, so the mining margin before depreciation was $21.1M, or 29%.3 Depreciation of the machines was $53.7M in the quarter.3
Two dates matter. The first is the next halving, in about April 2028, when the bitcoin paid for each block falls from 3.125 to 1.5625. The chain was at block 973,948 on 31 October, and the halving comes at block 1,050,000, about 528 days away at ten minutes a block.13 Revenue for the same machines falls by about half, and the power bill stays the same. The second is 31 December 2027. The contracts that supply the two Paraguayan plants, 300 MW out of 393, run only to that date, and after it the company has to negotiate new ones.2 Paraguay’s state utility raised tariffs by 14% in June 2024, and the company reports a further unexpected increase in the summer of 2025.2 I could not find in the 10-K or 10-Q whether the contracts oblige HIVE to buy a minimum amount of power. If they do, switching the machines off is not free.
What a unit of hash power earns, and what it costs
US$ per PH/s per day. Revenue after the halving is my estimate; cost is HIVE’s June quarter
- Revenue, base after halving $24
- Cost, all in $22.8
Show the numbers
| Revenue | Cost | |
|---|---|---|
| Apr to Jun 2026 (estimate) | $33.0 | $22.8 |
| Today, $77k (estimate) | $33.5 | $22.8 |
| Bear, after halving (estimate) | $16.0 | $22.8 |
| Base, after halving (estimate) | $24.0 | $22.8 |
| Bull, after halving (estimate) | $34.0 | $22.8 |
The chart is the whole mining case. A petahash-second earned $33.0 a day in the June quarter and costs about $22.8 to run, so the margin is nearly a third. At $77,200 bitcoin it is about the same. After the halving, with the network the same size, it earns about half. Miners with higher costs will switch off and revenue per machine tends to rise again. How far, nobody knows. I use $24 a day in my base, $16 in the bear and $34 in the bull (estimate). At $24 the machines cover power and little else, and they are close to worn out by the time anything better arrives.
The new business: GPU cloud
BUZZ rents out graphics chips. In August it had about 5,500 GPUs live, many of them old, earning about $97,000 a day, or $35M a year, and revenue from the unit was $7.1M in the June quarter.93 The company said on 10 September that since 21 August it had produced about 12 bitcoin a day and about $100,000 a day from GPUs, over $1M a day together. That is a preliminary, unaudited figure.16 Since February it has signed three large contracts. The company puts them at about $600M of total contract value.4 I show them in the table, with the figures I could work out from the company’s own releases.
Three GPU contracts
Revenue a year is total contract value divided by term. Revenue per GPU-hour is that divided by GPUs and 8,760 hours; it includes whatever else the company counts in the contract.
| Manitoba, B200 | Cohere and Bell, GB200 | Unnamed customer, GB300 | |
|---|---|---|---|
| GPUs (reported) | 504 | 2,304 | 2,016 |
| Term (reported) | 2 years | 3 years | 5 years |
| Total contract value (reported) | About $30M | About $225M | About $350M |
| Revenue a year (calculated) | About $15M | About $75M | About $70M |
| Revenue per GPU-hour (calculated) | $3.40 | $3.72 | $3.96 |
| Capital cost (reported) | Not stated | $165M | About $185M |
| Capital cost per GPU (calculated) | Not stated | $71,600 | $91,800 |
| How it is funded (reported) | Not stated | $129M loan, 9.0%, 3 years; the rest from the notes | 10% deposit from the customer; the loan is not announced |
| Live or due (reported) | Live since May 2026 | Delivery expected near the end of calendar 2026 | Delivery expected in calendar Q4 2026 |
The figures need two warnings. First, the company describes the same Cohere contract two ways: $220M in June, $225M in the August results and in October.894 The October release says the earlier figure counted only GPU rental and the new one includes connectivity and storage. Second, the “annual recurring revenue” the company quotes was $110M in the August results and $180M two days later in the release on the enterprise contract, with a target of $200M by the end of the year. It simply annualizes signed contracts and live revenue. The company itself warns that it does not allow for cancellations.9 I work from the contract values, not those figures.
Who is the customer? On the first contract, the company says it entered an agreement “with Bell Canada and Cohere”. The press release is headed “with Bell AI Fabric for Cohere Inc.” and the October release calls it “the Cohere 3-year fixed-term sovereign AI customer contract”.1884 Bell is the owner of the data center where the chips will sit. Cohere is the AI company that will use them. None of the documents says which of them signs and pays, or whether Bell guarantees the rent. I cannot judge the credit of the party that pays, and I do not assume that Bell’s does. The second contract is with “an enterprise customer having a high investment grade credit profile”, unnamed.17 I cannot check that either.
The company’s own hosting costs are mostly one thing. Both big clusters go into Bell’s data center in Merritt, British Columbia. HIVE signed a ten-year lease there. The lease added $69.3M to its assets and $66.3M to its debts in the June quarter, and about $3.0M a quarter of lease expense already sits in overhead because the site is not yet running.3 That is about $12M a year for a site that must hold about 60 racks of chips drawing roughly 8 MW (estimate). The 10-Q gives no separate figure for electricity or staff there. For the older, smaller GPU business, the gross margin after hosting and marketplace fees was 44% in the June quarter.3 For the new clusters I assume 25% of revenue goes to hosting and running them in my base, because there are no marketplace fees and the contracts are fixed (estimate). At the old business’s costs the new contracts would be worth far less.
The pipeline: Tier-III data centers
The company’s larger plan is to build or convert data centers that can hold GPUs for other people. It has three pieces.3 A 32 MW site it leases in Boden, Sweden, which the town council has approved it buying, and a non-binding letter of intent to lease about 25 MW of it for up to ten years.1819 A 70 MW site in New Brunswick that it calls a candidate for conversion, with $85M a year of potential revenue.3 And a 320 MW site near Toronto, on land it bought for $46M plus $12M, with a power allocation of 320 MW, which it puts at about C$3.5 billion to build for 100,000 GPUs.103 The company targets $700M of HPC annual revenue by the end of 2028.9 Nothing in this paragraph is signed except the land.
What it owes
HIVE owes $245M of zero-interest exchangeable notes. It sold $115M in April, exchangeable at $2.57 a share, and $130M in June, exchangeable at $4.83.67 Holders can ask for their money back on 15 April 2029 and 1 July 2030, so I treat both as debt.3 At $1.91 neither exchange price is close. HIVE also took out a $129M loan on 27 October at 9.0% for three years to pay for the Cohere cluster.20 Add $108M of leases, $18.5M of mortgages on Ontario land, a $10.9M Swedish loan and a small term loan. The 10-Q puts all the company’s listed obligations at $477M. The $85M Swedish tax charge, a current liability, is not in that figure.3
The tax claims
In the June quarter HIVE booked an $84.7M charge, SEK 822 million, for value-added tax in Sweden. The tax agency says the company’s Swedish plants were not entitled to refunds of tax paid on machines, and the Court of Appeal ruled against HIVE on the earliest decisions. The company has applied for leave to appeal to the Supreme Administrative Court, but its Swedish lawyers have told it that success is “remote”.3 Interest continues to accrue, and the company says its exposure may be larger.3 It also says its Swedish assets may be seized if it loses.3 In Canada, the tax authority has proposed adjustments of C$50.5 million on sales between group companies, which HIVE disputes and has not provided for, and two Canadian subsidiaries have claimed C$48.6 million of consumption tax credits that remain unpaid, against which the company has booked only a small provision.2 I treat the Swedish money as a cash cost and the Canadian items as risks on both sides.
The moat
I ask two questions. Can a rival take the customer at the same price, and would the customer want to move? HIVE has a different answer for each business.
Mining has none
Bitcoin mining sells a commodity at a price the miner cannot set. It is a race on power cost and machine efficiency. HIVE is decent at it: its fleet runs at 16.1 joules a terahash and it pays about 5.3 cents a kilowatt-hour.3 But it holds a little over 2% of the network, about 24.5 exahashes of roughly 1,024, and the network was about 8% smaller in October 2026 than in October 2025 (calculated).314 Anyone who buys the next generation of machine matches its efficiency. The halving then takes the margin from every miner at once. What decides who survives is the electricity contract, and HIVE’s main ones are up for renewal in 14 months.2
GPU rental has a thin one
HIVE does not make chips or software. It buys NVIDIA systems and sells time on them. That makes it a reseller of capacity with a contract. A customer that wants Blackwell GPUs in Canada has other places to go, and the prices of GPU hours fall as each new generation arrives. HIVE does not say who its biggest customer is, and its largest contract is with an unnamed party.5 A two-year contract on 504 B200 GPUs is sold for about $3.40 an hour.9 That price is for the chip HIVE can buy now. A buyer may well pay less in two years.
What protects a contract
Once signed, a fixed-term GPU contract is a good thing. The customer has an exclusive cluster, a place in a Canadian facility, and the company has a loan secured on the equipment at a fixed rate. If the cluster is delivered on time and works, the cash is contracted for three and five years. What is not protected is the next contract. That is where the question about a wall lies: a reseller that cannot prove its second cluster earns the same as its first.
Evidence it is narrowing
IREN makes the same trade, GPU clusters on contract with bitcoin on the side, at a much larger scale. Bitdeer and CleanSpark have also moved toward AI hosting. The market in contracted AI capacity has several sellers who can raise money quickly. HIVE’s chances depend on closing deals faster and cheaper than they do, or on a Canadian customer who wants to buy from a Canadian company. That second thing is the strongest claim the company makes, and it is one I cannot test.
The competitive advantage
What HIVE has is speed, cheap power and a record of getting machines running. Between April and November 2025 it built 300 MW of mining capacity in Paraguay and finished the last 100 MW two weeks early.3 The chief executive’s biography credits him with that build and with creating BUZZ.11 I take that as fair.
Three real things
First, power. Paraguay costs about 4.5 cents a kilowatt-hour on average, New Brunswick about 5.2 cents for the first 37.5 MW, and Quebec about 4 cents plus a monthly charge.2 It also owns a Toronto-area site with 320 MW of allocated power.10 Second, a lender: an institutional lender will fund 80% of a cluster’s cost at a fixed 9.0% for three years, secured on the chips and the contract, with only a limited guarantee from the parent.4 Third, a way to pay for the equity part. HIVE sold $245M of exchangeable notes in April and June, which brought in about $200M after the cost of the capped calls.4 At June 30 it held $208M of cash.3
Against the alternatives
The table sets HIVE’s two large contracts next to each other. Both have a high yield on cost. Neither has been run yet.
What the two big clusters earn on their cost
Annual revenue divided by capital cost, and what is left after the lender. My calculation from the company’s figures; hosting cost is my estimate.
| Cohere, GB200 | Unnamed, GB300 | |
|---|---|---|
| Revenue a year (calculated) | $75M | $70M |
| Capital cost (reported) | $165M | $185M |
| Revenue a year as a share of cost (calculated) | 45% | 38% |
| Years of revenue to repay the cost (calculated) | 2.2 | 2.6 |
| Hosting and operations at 25% of revenue (estimate) | $19M | $18M |
| Loan payment a year (calculated) | $51M (3 years, 9.0%) | $37M (my assumption, 5 years, 9.5%) |
| Cash left a year in the loan years (estimate) | $5M | $16M |
| Return on cost before the lender, with 45% re-leasing for two years (estimate) | 12% | 17% |
The lesson: the clusters pay back their cost, but on my numbers only a little more than the cost of the money. The first cluster’s loan takes two thirds of the revenue for three years. HIVE’s advantage is that the contracts exist and the loan is cheap, not that the return is wide. The return after year three depends on what the chips can earn when the contract ends, which I cannot know.
Management
Frank Holmes is executive chairman and has been on the board since 2017. Aydin Kilic is president and chief executive and has led the company since 2023. Darcy Daubaras has been chief financial officer since 2018. Craig Tavares runs BUZZ.1112 Mr. Holmes is also chief executive and chief investment officer of U.S. Global Investors, a listed fund manager.11 The same group signed the mining build, the exchangeable notes and the GPU contracts, so I follow what they are paid to do.
How they are paid
For the year to March 2026 Mr. Kilic was paid $5.30M: $0.59M of cash bonus, $4.44M in stock units and $0.27M of other pay. Mr. Holmes was paid $4.60M, of which $4.44M was stock units. The chief financial officer received $3.20M. None of them has an incentive tied to a financial target. The pay is units that vest after one year, granted each quarter, 400,000 at a time to each of Mr. Holmes and Mr. Kilic, whatever the share price or what the company has done.11 In June 2026 the company granted another 3.34M units to staff, officers and directors.3 The company says the quarterly design measures performance “across four observation windows” and says it prefers stock to salary.11
What does that pay them to do? To stay and to keep the stock price up. It does not pay for return on capital, cash per share, or avoiding dilution. A fixed number of units a quarter costs the owners more in dollars when the stock rises and less when it falls, which is mild comfort. Stock pay in the last twelve months was $27M, about 8% of revenue (calculated).3 I count it as a cost throughout.
What they own, and what they have done with it
At 27 July 2026 Mr. Holmes owned 425,000 shares outright and had rights to 2.7M more through options and units, 1.14% in all. Mr. Kilic held 1.95M. All twelve directors and officers together held 10.8M, or 3.9%, most of it units not yet delivered.11 Their own money is a small part of it. The Forms 4 I read, April to October 2026, show unit settlements and ten sales and no open-market purchase. Two directors and two officers sold 894,200 shares for about $3.6M in total. Director Dave Perrill sold 287,500 shares for $1.1M, Chief Operating Officer Luke Rossy 281,700 for $1.2M, director Susan McGee 225,000 for $1.0M, and the CFO 100,000 for $0.3M. Most of the selling was in June at $4.0 to $4.7. The most recent sale was on 7 October at $2.75.12 I make nothing of any one sale. Taken together, insiders have chosen not to buy as the stock fell from $5.38 in November 2025 to $1.91.1
Three more facts about the people. The company has had three management cease-trade orders for filing its accounts late, in 2019, 2021 and 2022.11 In 2026 it filed a late-filing notice for both the annual report and the June quarter, and the reports followed within a few days.21 Mr. Perrill was the founder and chief executive of Compute North, a data center company that filed for Chapter 11 protection in September 2022.11 None of this is proof of anything. It is a record of a small team that moves fast and is stretched.
What they did with capital
Since March 2023 the number of shares has risen from 84.2M to 273.6M, 3.3 times, while revenue rose from $106M to $331M over the twelve months, 3.1 times.22113 The company sold $187M of stock in fiscal 2025 at about $3.2 a share and $197M in fiscal 2026 at about $2.2.2 In the June quarter it sold $31M more at $3.16.3 Then it sold $245M of exchangeable notes and spent $35M of that on capped calls.3 In fiscal 2026 it also paid Bitmain 2,139 bitcoin, worth $190M then, as deposits on mining machines, and the treasury went from 2,201 coins to 150.2 It put about 300 MW of mining capacity in Paraguay into service in 2025, then said in March 2026 that it was winding down its Swedish mining and moving capital to AI.3 I can see what it did. I cannot say whether the mining build was wrong when made. It looks wrong now: bitcoin mining earned a 29% margin before depreciation in the last quarter, and the halving is 18 months away.
My read: this is a management that raises capital easily and spends it quickly, and has moved from mining to GPUs at the point when mining turned. The test is the same as before: whether each new cluster earns more than the capital it costs. The pay plan does not ask.
Financials
HIVE has seven fiscal years of public figures I can use, FY2020 to FY2026, and the twelve months to June 2026. It does not have ten. The record also has two breaks. FY2020 to FY2023 were reported under IFRS and FY2024 onward under US GAAP, and the same year, FY2024, was a $51M loss under IFRS and a $26.5M profit under US GAAP.22 The second break is the business. Revenue peaked at $211M in FY2022, in the last crypto boom, when the company still mined on graphics chips. The Ethereum network changed its rules in 2022, and the company says that is how its GPU business began.11 The business since March 2025 is a different one, with 25 exahashes of mostly Bitmain machines, 300 MW of owned plants in Paraguay, and now GPU contracts. I put the old numbers in because they exist, not because they predict.
Revenue and net income
Fiscal years to 31 March, US$ millions. FY2020 to FY2023 are IFRS, FY2024 on are US GAAP
- Revenue, TTM $331M
- Net income, TTM −$326M
Show the numbers
| FY2020 | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 | TTM Jun 2026 | |
|---|---|---|---|---|---|---|---|---|
| Revenue (reported) | $29M | $68M | $211M | $106M | $114M | $115M | $298M | $331M |
| Net income (reported) | −$2M | $24M | $80M | −$236M | $26M | −$3M | −$148M | −$326M |
Quality of earnings
Revenue was $331M over the twelve months to June 2026, up from $115M in FY2025.32 Net income was a $326M loss. Of that, $202M was depreciation, $27M stock pay, and in the June quarter $84.7M a tax provision in Sweden. Derivatives and investments cost $23M and $16M in fiscal 2026 and swing with the share price and with bitcoin.23 The company’s own adjusted EBITDA, a measure that excludes depreciation, stock pay, derivative changes and the tax provision, was $13.4M in the June quarter, −$9.0M, $5.7M and $31.5M in the three before, $41.6M for the twelve months (calculated).3 That figure is still before capital spending, interest, the Swedish payment and the machines wearing out.
HIVE, seven fiscal years and the latest twelve months
Fiscal years to 31 March, US dollars. TTM is the four quarters to 30 June 2026. Owner cash flow is operating cash flow plus all investing cash flow, less bitcoin paid for equipment, less stock pay. FY2020 to FY2023 are IFRS and FY2024 on are US GAAP. Share counts for FY2020 to FY2022 are not shown because I did not open those filings.
| FY2020 | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 | TTM Jun 2026 | |
|---|---|---|---|---|---|---|---|---|
| Revenue (reported) | $29M | $68M | $211M | $106M | $114M | $115M | $298M | $331M |
| Net income (reported) | −$2M | $24M | $80M | −$236M | $26M | −$3M | −$148M | −$326M |
| Operating cash flow (reported) | $1M | $24M | $66M | $45M | $10M | $17M | $62M | $56M |
| Stock pay (reported) | $1M | $2M | $7M | $8M | $7M | $11M | $25M | $27M |
| Depreciation (reported) | $6M | $11M | $67M | $82M | $64M | $64M | $170M | $202M |
| Capital spending (calculated) | $2M | $67M | $212M | $41M | $77M | $200M | $413M | $262M |
| Owner cash flow (calculated) | −$2M | −$45M | −$152M | −$4M | −$75M | −$194M | −$376M | −$232M |
| Weighted shares, basic (reported) | n/a | n/a | n/a | n/a | 90M | 128M | 225M | 266M |
| Shares at year end (reported) | n/a | n/a | n/a | 84M | 106M | 166M | 259M | 271M |
What an owner could really take out
Nothing so far. Over the twelve months to June 2026 operating cash flow was $56M. Investing cash flow was −$209M, and $53M more went to Bitmain in bitcoin. Stock pay was $27M. Owner cash flow was −$232M (calculated).23 Over fiscal 2021 to 2026 the owner cash flows add up to about −$850M (calculated). The same six years of reported net income add up to about −$260M, and part of that is on a different accounting basis. The gap is the money shareholders put in, which came back as machines that have since lost much of their earning power.
How much of the spending is needed just to stand still? Depreciation was $202M over the twelve months, nearly all of it on mining machines, which the company writes off over two to five years.23 The machines were mostly bought in the last two years, so replacement is not due yet. It will be from about 2028, just when the halving cuts what they earn. If the fleet were replaced I estimate the cost at about $13M for each exahash, $320M for the fleet, every four years or so (estimate). At that price I do not value mining as a business that continues. It is a fleet running down.
What an owner put in after each year
US$ millions. Owner cash flow = operating cash flow + investing cash flow − bitcoin paid for equipment − stock pay
- Owner cash flow, TTM −$232M
- Capital spending, TTM $262M
Show the numbers
| FY2021 | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 | TTM Jun 2026 | |
|---|---|---|---|---|---|---|---|
| Owner cash flow (calculated) | −$45M | −$152M | −$4M | −$75M | −$194M | −$376M | −$232M |
| Capital spending (calculated) | $67M | $212M | $41M | $77M | $200M | $413M | $262M |
The balance sheet
At 30 June 2026 the company had $208.0M of cash, $11.2M of bitcoin, $10.9M of investments and $245M of exchangeable notes, which the books carry at $234.9M. It also had $108.5M of lease liabilities, $18.5M of mortgages, $10.9M of Swedish loan and $1.6M of term loan, and an $84.7M tax provision due within a year.3 Counting the notes at face, cash and bitcoin cover about half of the financial debt and the tax bill together (calculated). Book equity was $422.7M, down from $529.4M in March.3 Total liabilities went from $110M to $502M in one quarter.3
The cash is not free. At 30 June the company owed $174.5M of purchase commitments for the GPU clusters. On 17 July it signed a $186.9M purchase of more equipment and paid a 10% deposit; 15% more is due when the maker has the parts, and 75% before shipment.3 That is very probably the 2,016 GB300 cluster, though the filing does not say so. On 27 October it borrowed $129M for the Cohere cluster, and has not said how it will fund the rest.20 The unused part of the at-the-market stock program was $214.7M on 17 June, and the company sold $6.3M more after 30 June.183
The share price since October 2020
Last close of each calendar quarter, log scale
- Close, Q4 2026 $1.91
Valuation
First, how this goes badly wrong
Before any number, I ask what would most likely hurt an owner, and work back from there. I see three ways.
The money runs out before the contracts pay. In the past year the company has sold stock at about $2 to $3 and notes at zero interest, and it still has bills ahead. It had $208M of cash at 30 June, but owed $85M of Swedish tax and $174.5M of equipment commitments, then ordered $186.9M more in July, and in April 2029 and July 2030 holders can ask for $245M back.367 In my base the cash goes negative in the third year. The peak shortfall, before any refinancing, is about $255M, which at $1.91 would be 133M new shares, 46% more than today (calculated). Each new share bought at a price below value takes some of the existing holders’ share of what is left.
Mining stops earning, and the power contract lapses. In my base, mining brings in $0.47 a share, all of it before the halving. After it, the machines earn about what the power costs. The contracts for 300 MW of the 393 MW run to 31 December 2027, and the 10-K says renewal is not assured.2 If power costs 35% more, or the contracts are not renewed, the fleet is worth almost nothing (estimate).
A big contract or a tax bill goes wrong. The Cohere and unnamed-customer contracts carry $575M of contract value in my base. The first loan is limited recourse: if the cluster fails, the lender takes the chips, and HIVE loses the equity it put in, about $36M, not more.20 That is the best feature of this structure. But the page cannot say who pays the Cohere rent, or how the second cluster will be funded. A customer that fails after the chips are bought leaves a cluster that rents on the open market at lower prices. The tax bills are the other half of this risk. Sweden’s agency is still adding periods, interest keeps running and the company’s lawyers call success “remote”.3 A claim of C$50.5M in Canada is pending and is not provided for.3 I put $95M for Sweden and $15M for Canada in the base, $120M and $45M in the bear.
What an owner gets today
Nothing. Over the twelve months to June 2026 the reported net loss was $326M, and owner cash was −$232M, after bitcoin handed to the equipment supplier and stock pay.23 In my base owner cash is $42M in the first year, −$151M in the second and −$84M in the third, because the Swedish payment, the loan on the second cluster and the equity for new data centers all fall in those years. It first turns positive in the fifth year, after mining has already ended (estimate). Stock pay is in these figures as a cost: at $52M a year for overhead and stock pay together, it is the largest recurring item.
What I can’t judge
Six things. What the Paraguayan power contracts say about minimum payments, and what the next ones will cost. Who pays Cohere’s rent, and how Cohere will fare. How the second cluster will be funded, and on what terms. What a GB200 or GB300 chip earns after its contract ends in 2029 or 2031, which depends on what comes after it. Whether the Tier-III sites find tenants at all. And how large the Swedish bill finally is. I use ranges. The wide gap between bear and bull is the honest answer, and my base depends most on the ones I flagged at the start.
How I value it
I add up the parts, because the company is several businesses at once. Each is the present value of cash after stock pay and after the capital needed to stand still, discounted at 15% for mining, 12% for the GPU contracts, 14% for new data centers and 13% for overhead, claims and debt service. I subtract the exchangeable notes at their put dates, discounted at 11%. Years are twelve months to 30 June, from 2027, for thirty years, and the cash flows are timed from the 31 October 2026 price date. I do not forecast bitcoin: the base holds it at today’s price, the bear at $55,000 and the bull at $110,000. The odds are mine and are not used in the values, except that the weighted value of $1.30 uses 25%, 50% and 25%. Per-share values use 290.3M shares: 273.6M outstanding on 27 July 2026 and 16.7M unvested stock units.113 I leave out the time value of the exchange rights and of the capped calls. In my bear and base the value never reaches the exchange prices, so the rights are worth nothing there, and in the bull the shares pass them and the dilution is already in the number. A rough option-pricing check at the market price, with volatility from 70% to 100%, puts the rights less the capped calls at $0.15 to $0.26 a share, and $0.23, or about $66M, at 90% (calculated). That check starts from the market price, not from my values, so adding it would count the bull twice. I show it so that you can take it off if you read the case differently.
Bear, base and bull
Assumptions behind each case. The bear model value is below zero; equity cannot be worth less than nothing, so I show $0.00.
| Bear | Base | Bull | |
|---|---|---|---|
| Bitcoin price held flat (estimate) | $55,000 | $77,000 | $110,000 |
| Revenue per petahash-second a day after the April 2028 halving (estimate) | $16 | $24 | $34 |
| Paraguay power price after the contracts end in December 2027 (estimate) | +35% | +15% | No change |
| Mining margin after the halving, average a year, years 3 to 8 (estimate) | $0M | $0M | $67M |
| Cohere cluster paying from (estimate) | July 2027, 30% less in years 2 and 3 | January 2027 | November 2026 |
| Unnamed customer’s cluster paying from (estimate) | April 2027 | January 2027 | November 2026 |
| Hosting and operating cost, share of GPU revenue (estimate) | 40% | 25% | 20% |
| Re-lease of the chips after each contract (estimate) | None | 45% of the rate, 2 years | 70% of the rate, 3 years |
| Further clusters of the August type signed (estimate) | None | 2 | 6 |
| New Tier-III data centers built and leased (estimate) | 0 MW | 75 MW by year 5 | 400 MW by year 7 |
| Overhead plus stock pay a year, to year 9 (estimate) | $56M | $52M | $65M |
| Swedish VAT and interest paid in year 2 (estimate) | $120M | $95M | $85M |
| Canadian claims (estimate) | $45M paid | $15M paid | $35M of credits recovered |
| Value per share, model (calculated) | −$1.79 | $0.18 | $4.85 |
| Value per share, shown (estimate) | $0.00 | $0.20 | $4.90 |
Where the value comes from
Present value per share in each case, on 290.3M shares: 273.6M outstanding and 16.7M unvested stock units. Options and warrants are out of the money.
| Bear | Base | Bull | |
|---|---|---|---|
| Bitcoin mining, existing fleet (estimate) | $0.03 | $0.47 | $2.13 |
| GPU contracts and further clusters, after their loans (estimate) | −$0.13 | $0.68 | $2.23 |
| New Tier-III data centers, after debt and equity put in (estimate) | $0.00 | $0.59 | $2.63 |
| Overhead and stock pay (estimate) | −$1.23 | −$1.27 | −$1.93 |
| Tax claims, mortgages, leases and loans (estimate) | −$0.66 | −$0.51 | −$0.35 |
| Cash, bitcoin and investments at 30 June, at the case price (estimate) | $0.81 | $0.83 | $0.85 |
| Exchangeable notes, at present value (estimate) | −$0.61 | −$0.61 | −$0.61 |
| Value per share (calculated) | −$1.79 | $0.18 | $4.85 |
Read the base column down. The GPU contracts and further clusters are worth $0.68 a share, new data centers $0.59, mining $0.47. Overhead and stock pay take −$1.27, the tax claims and debt service −$0.51, and the exchangeable notes −$0.61. The cash, bitcoin and investments, $0.83, only just cover what is owed. So almost all of the base value is what the company earns on assets it has not built, after overhead that is paid whether it builds them or not (estimate).
The two big GPU contracts: revenue, debt service and what is left
US$ millions a year, years to 30 June (Y1 = July 2026 to June 2027). Base case; hosting and operating cost at 25% of revenue
- Revenue, Y2 $145M
- Debt service, Y2 $87M
- Left, Y2 $21M
Show the numbers
| Y1 | Y2 | Y3 | Y4 | Y5 | Y6 | Y7 | Y8 | |
|---|---|---|---|---|---|---|---|---|
| Revenue (estimate) | $72M | $145M | $145M | $124M | $104M | $68M | $32M | $16M |
| Debt service (estimate) | $44M | $87M | $87M | $62M | $37M | $18M | $0M | $0M |
| Left after hosting and debt (estimate) | $11M | $21M | $21M | $31M | $41M | $32M | $24M | $12M |
The base path
Owner cash by source, $ millions, twelve months to 30 June. The exchangeable notes ($115M in 2029, $130M in 2030) are not in these rows.
| 2027 | 2028 | 2029 | 2030 | 2031 | 2032 | 2033 | 2034 | 2035 | 2036 | |
|---|---|---|---|---|---|---|---|---|---|---|
| Mining margin (estimate) | $87M | $62M | $0M | $0M | $0M | $0M | $0M | $0M | $0M | $0M |
| GPU contracts, after loans (estimate) | $21M | −$10M | $41M | $11M | $76M | $32M | $60M | $53M | $33M | $24M |
| New data centers, after debt and equity (estimate) | $0M | −$28M | −$42M | −$28M | $15M | $45M | $47M | $49M | $51M | $53M |
| Overhead and stock pay (estimate) | −$52M | −$52M | −$54M | −$56M | −$57M | −$58M | −$58M | −$58M | −$58M | −$21M |
| Tax claims, loans and leases (estimate) | −$14M | −$123M | −$30M | −$2M | −$2M | −$2M | −$2M | −$2M | $0M | $0M |
| Owner cash (calculated) | $42M | −$151M | −$84M | −$74M | $33M | $18M | $48M | $42M | $26M | $55M |
Owner cash in my three cases
US$ millions a year, twelve months to 30 June: bear to bull, with the base marked
- Bear to bull, 2035 −$56M to $440M
- Base, 2035 $26M
Show the numbers
| 2027 | 2028 | 2029 | 2030 | 2031 | 2032 | 2033 | 2034 | 2035 | 2036 | 2037 | 2038 | 2039 | 2040 | 2041 | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Bear (estimate) | −$57M | −$215M | −$129M | −$71M | −$52M | −$88M | −$57M | −$57M | −$56M | −$15M | −$15M | −$15M | −$15M | −$15M | −$15M |
| Base (estimate) | $42M | −$151M | −$84M | −$74M | $33M | $18M | $48M | $42M | $26M | $55M | $48M | $35M | $37M | $39M | $41M |
| Bull (estimate) | $153M | −$109M | −$48M | −$27M | $62M | $86M | $281M | $422M | $440M | $454M | $376M | $290M | $267M | $267M | $267M |
What the price says
At $1.91 the market is paying for much more than my base. Holding my other base inputs, the price needs about 19 further clusters of the August type, against two in my base (estimate). That is about $3.5B of equipment bought and about $1,510M of yearly GPU revenue. For comparison, the company’s target for all high-performance computing is $700M by the end of 2028.9 Bitcoin does not close the gap by itself: with two clusters, even $130,000 bitcoin gives $1.30.
Reverse discounted cash flow
What the price needs, one input at a time.
| What the price of $1.91 needs | Holding my other base inputs |
|---|---|
| Further clusters of the August type, each $185M of cost and $70M a year (estimate) | About 19, against 2 in my base |
| Capital spent on them (calculated) | About $3.5B, with about $0.88B of equity at 25% of cost |
| GPU revenue a year, all contracts, at that point (calculated) | About $1,510M, against the company’s $700M target for all HPC by the end of 2028 |
| Or bitcoin alone, with 2 clusters (estimate) | Not reached: $130,000 bitcoin gives $1.30 |
| Or lower rates alone (estimate) | Not enough: at the low rates the value is $0.36 |
The pipeline against the market value
The plan the company has described is far bigger than the company. The Toronto site alone is C$3.5B, about $2.5B at the average rate in the 10-K, before any GPU, and it is meant to hold more than 100,000 of them.311 At the prices in the two signed clusters, $71,600 and $91,800 a GPU, 100,000 GPUs cost $7.2B to $9.2B (calculated). Even at 75% debt on all of it, the equity would be about $2.4B to $2.9B, between 4.6 and 5.6 times the company’s market value of $523M (calculated). The company can build part of this only if the market keeps buying its stock and notes. I have none of the Toronto site in my base. It is in the bull.
How much the answers move
The discount rate matters less than the volume of new business. Cutting every rate by three points gives $0.36, still far below the price. The bigger swing is how many clusters get signed and funded, and what bitcoin does. The grid is below.
Base value by discount rate
Value per share in the base case at three sets of rates.
| Low rates | Base rates | High rates | |
|---|---|---|---|
| Mining (estimate) | 12% | 15% | 18% |
| GPU contracts (estimate) | 9% | 12% | 15% |
| Data centers (estimate) | 11% | 14% | 17% |
| Overhead and other (estimate) | 10% | 13% | 16% |
| Exchangeable notes (estimate) | 9% | 11% | 13% |
| Value per share (calculated) | $0.36 | $0.18 | $0.08 |
Base value by bitcoin price and further clusters signed
Value per share; the 2-cluster column is my base at $77,000. Each cluster is $185M of cost and $70M a year of revenue.
| Bitcoin price | 0 clusters | 2 clusters | 6 clusters | 12 clusters |
|---|---|---|---|---|
| $45,000 (estimate) | −$0.53 | −$0.31 | $0.10 | $0.72 |
| $55,000 (estimate) | −$0.49 | −$0.28 | $0.13 | $0.75 |
| $77,000 (estimate) | −$0.03 | $0.18 | $0.59 | $1.21 |
| $100,000 (estimate) | $0.45 | $0.67 | $1.07 | $1.70 |
| $130,000 (estimate) | $1.08 | $1.30 | $1.70 | $2.33 |
The margin of safety
My margin-of-safety price is $0.10. The bear case is zero in the model, so no price is safe from it. At $0.10 the market value is about $27M, less than a sixth of the cash and bitcoin the company reported at 30 June, and an owner would take the notes, the tax bill and the contracts nearly for free. It is not a floor. If the second cluster is not funded, or Cohere does not pay, the equity can go to zero.
What it is worth, against the price
Value per share, my estimates, against the close in Q4 2026
- Bear to bull $0.00 to $4.90
- Base $0.20
- Price $1.91
- Margin of safety below $0.10
The price against the range
At $1.91 the price is 855% above my base value of $0.20 and 61% below my bull of $4.90. It is also 46% above the weighted value of $1.30, in which the bull supplies 93% of the number. The market is paying for a good part of the bull case. Its case is that HIVE signs a new cluster every few months on the August terms, funds each with 80% debt at about 9%, and puts up the Toronto site. Each has happened once. I give the full set about 0.7% together, in the table below. The market may know more than I do about the pipeline and its customers. I cannot see them.
Against the alternative
The next best use of the same dollar is a business that already collects rent on computing capacity. The closest published page on this site is Oracle, a cloud operator that also borrows heavily to build, whose base value implies +11.4% a year to year 10. Vertiv, which sells equipment into the same data centers, implies +3.7%. My base for HIVE gives −5.3% a year on the same method, below both, and it needs more things to go right (estimate). Other miners that are moving to AI, such as IREN, Bitdeer and CleanSpark, I have worked up in the same way, on their own pages.
Quality and price, separately
The quality question is whether the business earns more than the capital it uses. Mining does not once the halving arrives. The two large GPU contracts earn about their cost of capital by my estimate, helped by cheap loans and a short list of customers. Whether the whole company does depends on contracts not yet signed, and on overhead that is paid either way. The price question is separate: $1.91 sits far above my base and well below my bull. A business that earns its cost of capital is not a poor business, and it is not a good purchase by default. I leave the decision to the reader.
How the odds multiply
The price needs several things at once. Multiplying my guesses gives about 0.7%. The odds are mine and are not used in the values.
How the odds multiply
Each step is a separate risk; the product is the chance all hold.
| Needed for the price | My chance |
|---|---|
| The three signed contracts are delivered on time and paid in full (estimate) | 80% |
| HIVE signs 17 more clusters of the August type by 2029 at the same terms (estimate) | 10% |
| It can fund them without selling shares far below today’s price (estimate) | 40% |
| The chips earn 45% or more of their contract rate when the contracts end (estimate) | 50% |
| The Swedish and Canadian claims come in near my base (estimate) | 70% |
| Mining keeps its power at no more than +15% after 2027 (estimate) | 60% |
| All of it together (calculated) | 0.7% |
Where this could be in 5 and 10 years
These are my estimates of value, not forecasts of the price.
| Year 5, to October 2031 | Year 10, to October 2036 | Cash paid to owners to 2036 | Yearly return from $1.91 to year 10 | |
|---|---|---|---|---|
| Bear (estimate) | $0.00 | $0.00 | $0.00 | −100% |
| Base (estimate) | $0.32 | $1.11 | $0.00 | −5.3% |
| Bull (estimate) | $8.26 | $12.91 | $0.00 | +21.1% |
The table shows the model’s value per share at each date: the cash and bitcoin kept by then, less any shortfall that has to be funded, plus the present value of owner cash after it, less the notes still owed, per 290M shares today, in each year’s dollars. The model pays nothing to owners before 2036, so the third column is zero. The bear is below zero in both years, so I show $0.00. This is also the page’s own model, rolled forward: today’s base is $0.20.
For the base to hold at five years, both big contracts must be running, the 2029 notes must have been refinanced, and about 75 MW of new data centers must be signed. The value is $0.32. It rises to $1.11 at ten because the data centers pay and the older loans are gone, while overhead and stock pay of about $52M a year takes much of every dollar earned. It needs the chips to re-lease at about 45% of the contract rate and a discount rate near 12 to 15%. The most likely way the base is wrong is that new contracts are fewer, or at lower prices, or cost more to fund: each cluster, signed or not, moves the value by about $0.10 a share.
The bull is the same company with six more clusters, 400 MW of data centers and $110,000 bitcoin. The bear is the three signed contracts at a loss, mining ended and no new business. A reader’s guide: the market price can sit above or below these values for years.
The case for the price
What most people miss
Three things cut in HIVE’s favour and are easy to overlook. First, the structure of the debt. The $129M loan on the Cohere cluster is borrowed by a subsidiary, secured on the chips, and the parent’s guarantee is limited.20 If one cluster fails, the lender takes that cluster and not the rest of the company. Second, the exchangeable notes bear no interest and the first date that matters is April 2029. There is time. Third, HIVE says it has about 100 MW of extra power at Yguazú coming on in the fourth quarter of 2026 that is not yet allocated, and a 70 MW site in New Brunswick, so the choice of what to do with them is still open.9
The bull case
In plain words: AI buyers are short of powered capacity in Canada, HIVE has the power, the sites and the lenders, and three contracts in six months show buyers will pay for it. The chief executive said in October that the company had signed $600M of GPU cloud contracts this year, and that the loan covered 80% of a $165M cluster at 9.0%.4 Mr. Holmes said in June that those building sovereign AI infrastructure now are “positioning for a decade of asymmetric returns”.8 If more contracts follow on the same terms, HIVE becomes a Canadian GPU landlord with a growing list of long contracts. That is my bull, $4.90 a share.
I did not find an analyst note on HIVE that I could open and read, so I name none.
A dated fact about holders
Situational Awareness LP, the fund run by Leopold Aschenbrenner, reported 9,133,726 HIVE shares, worth $33.2M, at 30 June 2026 in its 13F-HR filed on 14 August 2026.23 That was about 3.4% of HIVE’s shares and 0.16% of the fund’s reported value. A 13F does not show shorts or holdings outside the United States, so I do not read it as saying what the fund holds now or will do.
Against reality
Today three contracts are signed, two are not yet delivered, and the biggest funding step is still ahead. If both big clusters are delivered on time, the second one is funded, the older chips earn something after the contracts end, and Swedish tax is near $95M, my model gives $0.59 with six clusters in all and $1.21 with twelve. The price of $1.91 needs about 19, against two in my base. That is 17 more clusters than the base and about $3.1B more of equipment (calculated).
What a 10x would take. Ten times $1.91 is $19.10. At that price the exchangeable notes would convert and the count would rise to about 351M shares, a market value near $6.7B (calculated). On my model that needs about 218 clusters of the August type, $40B of equipment and about $15B a year of GPU revenue, against $0.18B of contracted revenue today (estimate). The shares have done it before. In the feed’s figures, which may be adjusted for share changes, they rose from $1.29 on 2 October 2020 to $26.83 on 19 February 2021, twenty times in four and a half months, and from $1.45 on 31 March 2025 to $5.38 on 3 November 2025.1 That was a bitcoin boom, and the company was far smaller. A tenfold move from here, on cash flows, needs a company of a different order. I would not build a case on it.
What they have to hit
Six numbers on a fixed schedule. Thresholds come from my base case and agree with the signposts below.
| Indicator | Today | What the case needs | Where to track it | Next check |
|---|---|---|---|---|
| Cohere cluster live | 2,304 GB200 GPUs bought; delivery expected near the end of calendar 2026; no revenue yet48 | Live and paying by March 2027, about $6M a month (estimate) | 10-Q: HPC revenue and subsequent events; 8-Ks | 10-Q for the quarter to 30 September 2026, due about 9 November (the last one was filed on 14 August after a late-filing notice)21 |
| Second cluster funded | $186.9M ordered in July, 10% paid; no loan announced317 | A loan of 70% or more of cost at 10% or less, with no sale of stock below $2 (estimate) | 8-K Item 1.01 or 8.01; 10-Q liquidity section and subsequent events | 10-Q for the quarter to 30 September 2026, due about 9 November |
| Swedish VAT | $84.7M provision; leave to appeal filed 20 July 2026; counsel calls success remote3 | Total cost no more than $95M including interest (estimate) | 10-Q Note 16 and the tax section of the MD&A | 10-Q due about 9 November; the court’s answer on leave has no date |
| Paraguay power | Contracts to 31 December 2027 for 300 of 393 MW2 | Renewal at no more than 15% above today’s 4.5 cents before mid-2027 (estimate) | 10-K and 10-Q, properties and risk factors; 8-K | Form 10-K for the year to 31 March 2027, due June 2027 |
| Share count | 273.6M at 27 July 2026, plus 16.7M units113 | Under 340M through 2028, meaning shortfalls funded mostly with debt (estimate) | 10-Q cover page and the quarterly at-the-market report | 10-Q due about 9 November 2026 |
| Tier-III leases | Boden letter of intent, 25 MW, non-binding; nothing else signed19 | A signed lease on 25 MW at $1.4M a MW or more by the end of 2027 (estimate) | 10-Q MD&A, pipeline and subsequent events; 8-K Item 1.01 | 10-Q due about 9 November 2026, then each quarter; the company’s own target is $200M of GPU revenue a year by the end of 20269 |
Where I come down
The way the loans are built moved me: a cluster with a fixed 9% loan secured on itself puts less of the company at risk. The $85M Swedish bill, the stock pay, the quarterly share sales by insiders and the absence of any named customer on the biggest contract did not. A signed second-cluster loan on those terms, a named investment-grade customer, and a renewed Paraguay power contract at close to today’s cost would raise my values most. I would need several clusters beyond the two signed before the base moved toward the price.
Risks, and what would change my view
The three ways this goes badly wrong are at the start of Valuation. These are the rest.
- Two customers. The two large contracts are with two parties, and one of them is unnamed. The company itself lists dependence on significant customers and the risk of termination as factors that could change the results.4
- Delivery and the site. Both clusters go into a Bell facility the company does not own, under a ten-year lease, with delivery expected near the end of 2026.35 Late delivery moves revenue and the loan payments back.
- Chips lose value. A new generation can cut what the older one rents for. The company’s own filing lists lower resale value and shorter useful life as a risk.2
- Dilution and financing. Shares rose from 84M to 274M in three years. The company also has $245M of exchangeable notes with put dates, and more projects to fund.22113
- Tax. Sweden’s claim is booked at $84.7M and may grow; Canada’s agency has proposed C$50.5M more.3 The company says Swedish assets may be seized if it loses.3
- Power. Paraguayan contracts to 31 December 2027, a 14% tariff increase in 2024, a further rise in 2025, and a proposed Hydro-Québec tariff that could raise costs in Quebec.23
- Bitcoin and the halving. Mining is 91% of revenue and loses its margin when the reward halves in about April 2028.3
- Small team, late filings. 29 employees, three late-filing cease-trade orders since 2019 and two late-filing notices in 2026.21121 The auditor, Davidson & Company LLP, issued unqualified opinions on the accounts and on internal control for the year to March 2026.2
- Control and pay. The executive chairman is also chief executive of U.S. Global Investors, which once held $15M of the company’s debentures; pay is stock units with one-year vesting and no performance target that I can find.311
Geopolitical risk, and what it means for the value
The filings show no sanctions, capital controls or variable-interest structure, and HIVE reports in US dollars. What it has is power bought from a foreign state, tax disputes in two countries, one customer in Canada and one Chinese supplier. I reran the model for each.
Paraguay. About 19 of the 24.5 exahashes run there on contracts with ANDE, the state utility, that end on 31 December 2027.2 ANDE sets the price. It raised tariffs 14% in June 2024, and an industry report, which is secondhand, says it now asks for three months of power in advance.224 Itaipu, shared with Brazil, supplies most of its power. HIVE has no site or customer in Brazil or Argentina that I found, and its Iceland site closed in January 2024.2 I put the odds that the contracts lapse at about one in four, and that the next ones cost 35% or more above today’s at about one in four, because the tariff has already risen twice. These are guesses (estimate).
Sweden and Canada. The VAT bill is in kronor, so a 10% move in the krona moves $95M by about $9M. The Supreme Administrative Court is the last Swedish step, and the 10-Q says seizure of Swedish assets is possible.3 Interest keeps running, so I think the final cost is more likely than not above $95M. Canada’s agency has proposed C$50.5M and issued other reassessments of C$13.6M, together about $46M (calculated), with no notice of assessment yet on the larger one.3
Cohere, tariffs and export rules. Cohere is private. It raised at a $7B valuation in September 2025,25 and Ottawa has committed up to C$240M to its compute project.26 That does not guarantee HIVE’s rent. I put the chance it stops paying in the first year at about one in twenty, because I do not know who pays. The tariff risk runs through Bitmain, whose machines fill its plants; the 10-K lists US tariffs as a risk to the manufacturers it relies on.2 My base buys no new machines, so it costs nothing there. The US rescinded its AI Diffusion Rule on 13 May 2025 and promised a replacement.27 I could not confirm how a new rule would treat Canada, so I assume delivery. Beyond the VAT, the filings tie no EU rule to the Swedish site.
Geopolitical scenarios against the model
Value per share, my estimates. Each row changes one thing in the base and the bull; the last row changes several together.
| Scenario | Base | Bull |
|---|---|---|
| My model, unchanged | $0.18 | $4.85 |
| Paraguay contracts lapse on 31 December 2027 | $0.11 | $3.82 |
| Paraguay renewed at +35% instead of +15%, and at +35% in the bull | $0.14 | $4.26 |
| Swedish bill $120M and one 25 MW block lost | −$0.07 | $4.58 |
| Canada paid in full, about $46M | $0.10 | $4.74 |
| Cohere stops paying after the first year, lender takes the chips | $0.04 | $4.54 |
| Replacement miners cost 25% more | $0.18 | $4.82 |
| Paraguay lapse with +35% on what remains, Swedish bill $120M, Canada paid, Cohere six months late and 30% less | −$0.21 | $3.26 |
In the price? My base already has mining earning nothing after the halving, so a Paraguayan lapse costs it only $0.07. The price is more than ten times my base, and no row closes that gap. If the market is paying for the bull, the exposure is Paraguay, at $1.03 a share, and Cohere, at $0.31.
What would change my view
Signals that move my values, in either direction.
| Signal | Today | Raises my value | Lowers my value |
|---|---|---|---|
| Cohere cluster | Delivery expected end of 20264 | Live by March 2027 and paying | Delivery after mid-2027 or a payment dispute |
| Second cluster loan | None announced3 | 70% or more of cost at 10% or less | Funded with stock below $2 |
| Swedish VAT | $84.7M provision3 | Total near or under $95M | Interest and new periods push it past $120M |
| Paraguay power | Contracts to 31 Dec 20272 | Renewed within 15% of today’s price | Not renewed or up 35% or more |
| Share count | 273.6M plus 16.7M units113 | Under 340M through 2028 | Over 400M before 2028 |
| Tier-III leases | Boden letter of intent only19 | 25 MW signed at $1.4M a MW or more | Nothing signed by end of 2027 |
Sources
- 1HIVE daily closes, Nasdaq.com historical API, 1 October 2020 to 30 October 2026 (opens in a new tab)
- 2HIVE Digital Technologies Ltd. Form 10-K for the year ended 31 March 2026 (opens in a new tab)
- 3HIVE Digital Technologies Ltd. Form 10-Q for the quarter ended 30 June 2026 (opens in a new tab)
- 4HIVE’s BUZZ HPC secures approximately $129 million at 9.0% fixed-rate financing (Exhibit 99.1) (opens in a new tab)
- 5HIVE’s BUZZ HPC signs $350 million AI cloud services agreement with investment-grade enterprise customer (Exhibit 99.1) (opens in a new tab)
- 6HIVE Digital Technologies Ltd. Form 8-K, $115 million 0% exchangeable senior notes due 2031 (opens in a new tab)
- 7HIVE Digital Technologies Ltd. Form 8-K, $130 million 0% exchangeable senior notes due 2031 (opens in a new tab)
- 8HIVE’s BUZZ HPC closes USD $220 million sovereign AI GPU contract with Bell AI Fabric for Cohere Inc. (Exhibit 99.1) (opens in a new tab)
- 9HIVE reports Q1 2027 revenue of $79.1 million; contracted GPU cloud ARR reaches approximately $110 million (Exhibit 99.1) (opens in a new tab)
- 10HIVE Digital Technologies Ltd. Form 8-K, land for the Greater Toronto Area site (opens in a new tab)
- 11HIVE Digital Technologies Ltd. Form 10-K/A (Amendment No. 1), Part III (opens in a new tab)
- 12HIVE Digital Technologies Forms 4, April to October 2026 (EDGAR filing index) (opens in a new tab)
- 13Bitcoin block height, mempool.space API (blocks/tip/height) (opens in a new tab)
- 14Bitcoin network hash rate, Blockchain.com charts API (opens in a new tab)
- 15Bitcoin (BTC-USD) daily closes, Yahoo Finance chart feed; Coinbase spot (opens in a new tab)
- 16HIVE appoints Mark Volk; surpasses $1 million in average daily revenue (Exhibit 99.1) (opens in a new tab)
- 17HIVE Digital Technologies Ltd. Form 8-K, five-year GPU cloud services agreement (opens in a new tab)
- 18HIVE Digital Technologies Ltd. Form 8-K, Bell and Cohere agreement; Boden acquisition; amended at-the-market program (opens in a new tab)
- 19HIVE Digital Technologies Ltd. Form 8-K, Boden co-location letter of intent (opens in a new tab)
- 20HIVE Digital Technologies Ltd. Form 8-K, $129 million loan and security agreement (opens in a new tab)
- 21HIVE Digital Technologies notifications of late filing (Forms NT 10-K and NT 10-Q), 2026 (opens in a new tab)
- 22HIVE Digital Technologies Ltd. company facts (XBRL from Forms 40-F FY2021 to FY2024 and 10-K FY2024 to FY2026) (opens in a new tab)
- 23Situational Awareness LP Form 13F-HR for 30 June 2026 (opens in a new tab)
- 24The State of Bitcoin Mining in Paraguay (2026) (opens in a new tab)
- 25Canadian AI startup Cohere hits $7B valuation (opens in a new tab)
- 26Government of Canada finalizes investment to support Canadian-born AI leader, Cohere (opens in a new tab)
- 27Department of Commerce rescinds Biden-era artificial intelligence diffusion rule, strengthens chip-related export controls (opens in a new tab)
How the figures are labelled
(reported)Reported: taken from a filing or a price feed, as printed.
(calculated)Calculated: arithmetic on reported figures, such as a margin or a growth rate.
(estimate)Estimate: my judgement, such as a case value or a growth assumption.
The price
Close in Q4 2026: $1.91, from Nasdaq [1]. Retrieved in Q4 2026. HIVE’s fiscal year ends on 31 March, and the company calls the quarter to 30 June 2026 its first quarter of fiscal 2027; I call it the June quarter, and I use Q4 2026 only for the price date. The company reports in US dollars and files 10-Ks and 10-Qs; the shares are listed on Nasdaq, in US dollars, and on the Toronto Stock Exchange, in Canadian dollars. I use the Nasdaq price. Per-share values use 290.3M shares: 273.6M outstanding on 27 July 2026 and 16.7M unvested stock units at 30 June 2026. Options and warrants are out of the money. The exchangeable notes are not counted as shares unless the value passes their exchange prices ($2.57 and $4.83), when I add the shares, less the capped calls. The latest figures are from the June quarter; the next 10-Q is due in November. I count cash, bitcoin and investments and leave out $38.8M of utility deposits and other working capital; if all of it came back it would add about $0.13 a share (calculated).3
The valuation
Sum of the parts, each the present value of owner cash after stock pay: the mining fleet (revenue at my hashprice and bitcoin price, less power at 5.3 cents and other costs, to the end of the machines’ life); the GPU contracts (contract revenue less hosting and operating costs at my share of revenue, less loan payments, plus my re-lease estimate), with further clusters on the August terms; new Tier-III data centers at $9M a MW, $1.4M a MW of net rent, 75% debt at 8% over 15 years and 21% tax; overhead and stock pay; claims; and the cash, bitcoin and investments at 30 June, less the exchangeable notes at present value. Discount rates are 15%, 12%, 14%, 13% and 11% as stated. The first year is the twelve months to 30 June 2027, timed from the price date. I do not know what the company holds today; the next count is in the 10-Q. The odds in the table are my guesses and are not used in the values, except that the weighted value of $1.30 uses 25%, 50% and 25%.
The margin-of-safety price is $0.10. No rating: the page states a range and the price, and leaves the decision to the reader.
Research, not investment advice. Figures as of .
Legal information and disclosures
These are my own views as of the update shown on this page. They can change without notice, and I have no duty to update them. Past performance does not indicate future results, and any investment can lose money.
This is for education only. It is not investment, legal, tax or accounting advice, and it is not an offer to sell or a solicitation to buy any security in any jurisdiction. It does not consider your goals or circumstances.
Figures from company filings and other third parties are believed to be reliable, but I have not independently verified them and cannot guarantee them. Bear, base and bull values, and anything marked as an estimate, are my own and rest on assumptions that may prove wrong.
Please do not copy or republish this material without my written consent.