Investing№ 127NYSE: WMB

Williams

Williams moves about a third of US natural gas on contracted pipes and earned $6.46B of cash flow before capital, but after $8.4B of spending and minority payouts the owners’ cash was −⁠$2.3B against a $2.55B dividend, and debt and a power-project investor covered the gap.

Updated Fiscal year ends 31 December48 min readPedrum Shokouhi

Strong moat

Research, not investment advice. Figures as of .

Key numbers

  • Adjusted EBITDA$8.25B (calculated)TTM to September 2026; $7.75B in 2025, up 9% for nine months [3][4]
  • AFFO, cash flow before capital$6.46B (calculated)TTM; $5.25 a share; the 2026 guide midpoint is $6.375B, $5.15 a share [3][4]
  • Dividend$2.10 (reported)A share for 2026, a 3.1% yield on the price and about 40% of AFFO [4][3]
  • Net debt$32.2B (calculated)30 September 2026; 3.9x EBITDA by my count, 3.80x by the company’s [5][3]
  • Cash after all capital−$2.3B (calculated)TTM, against $2.55B of dividends, and before $2.8B paid for bought businesses; +$0.2B in 2025 [5][6]
  • Contracted revenue ahead$32.5B (reported)Remaining performance obligations at 30 September 2026, $21.0B of it Transco [5]

(reported)Reported in a filing (calculated)Calculated from reported figures (estimate)My estimate

The answer

  1. Williams earned $8.25B of adjusted EBITDA and $6.46B of available funds from operations (AFFO) in the twelve months to September, $5.25 a share, and pays $2.10 a share of it; but it also spent $7.6B on capital expenditures and $0.5B on equity investments, so after all capital and minority distributions the business was $2.3B short of cash against a $2.55B dividend, and debt, a $3.74B partner investment in its power projects and asset sales covered the gap (calculated).5346
  2. I value a share at $68 in a range of $34 to $110, and the number turns on two things I can’t judge closely: what the next $4B to $5B a year of growth capital earns, and when the company starts to pay real cash tax (estimate).57
  3. At $67.86 the price is within 1% of my base value, so the market asks for 9.0% a year on my cash flows and I ask for 9.0%; but the stock trades at 14.9 times trailing EBITDA against 9.7 to 10.7 times at the year-ends of 2019 to 2023, so a good part of the debate is whether that higher multiple lasts, and my margin-of-safety price is $45 (estimate).126

Six questions, one line each

Why
It owns the pipes that, in its words, deliver about a third of the nation’s natural gas, led by the 9,600-mile Transco line to the East Coast, and it is paid mostly by reservation charges on contracts that had $32.5B of revenue left to run at 30 September.735 →
The moat
A full, regulated pipe into the Atlantic seaboard can’t be copied, but a regulator resets its toll, a court just vacated a water permit for its next expansion, and the share closed 2022 at $32.90, about where it closed 2016 ($31.14), before it doubled (calculated).571 →
The advantage
It connects gas supply to the three buyers growing fastest, LNG docks, gas-fired power and industry, and its first power plant went into service in July with the rest due by mid-November; the price of that is spending that outruns cash flow.35 →
Management
Chad Zamarin became chief executive in July 2025 and was paid $8.68M that year; half of his performance units pay on AFFO per share, which counts cash before growth capital, the other half on cash return on invested capital.8 →
Margin of safety
Below $45, 34% under my base value, my $34 bear value is at least three quarters of the price paid; $67.86 is above that line (estimate).1 →
The price
$67.86 at the NYSE close in Q4 2026, 15% under May’s high close of $79.40, 0% below my base value and 38% below my bull.12 →

The business

Williams is a Tulsa company that moves natural gas and charges a fee for doing it. It owns an interest in and operates over 32,000 miles of pipeline in 24 states and the Gulf of America, 35 gas processing plants, 9 plants that split natural gas liquids, 423 billion cubic feet of gas storage and about 800 customers, and its 5,987 employees do the work.7 The company says its system delivers one third of the nation’s natural gas.3 In a toll-road picture, the interstate pipelines are the highway, the gathering systems are the on-ramps in the shale fields, and the new power plants are a private road built for one customer.

All figures are in US dollars and follow US accounting. TTM means the twelve months to 30 September 2026, which I build from the 2025 10-K and the nine months reported on 2 November.75 The third-quarter report is the latest one out.

Over those twelve months revenue was $12.5B, adjusted EBITDA $8.25B, AFFO $6.46B and net income to common holders $3.13B (calculated).753 Net income includes about $0.4B of pre-tax gains on asset sales in the first nine months, which adjusted figures leave out.3 Adjusted EBITDA includes the company’s share of the EBITDA of the pipelines and plants it owns jointly with others, about $1.0B in 2026, while the cash from those arrives as distributions, so I treat AFFO as the cash measure.3

Adjusted EBITDA, and the cash flow that reached owners

US$, calendar years

  • Adjusted EBITDA $7.75B in 2025
  • AFFO $5.86B in 2025
Adjusted EBITDA, and the cash flow that reached ownersAdjusted EBITDA by year in billions of US dollars, with available funds from operations (AFFO, called distributable cash flow in 2018 and 2019) from 2018. EBITDA went from $4.4B in 2016 to $7.75B in 2025 and AFFO from $2.9B in 2018 to $5.9B in 2025.$0$2B$4B$6B$8B’16’18’20’22’24Adjusted EBITDA, 2016: $4,436MAdjusted EBITDA, 2017: $4,531MAdjusted EBITDA, 2018: $4,638MAdjusted EBITDA, 2019: $5,015MAdjusted EBITDA, 2020: $5,105MAdjusted EBITDA, 2021: $5,635MAdjusted EBITDA, 2022: $6,418MAdjusted EBITDA, 2023: $6,779MAdjusted EBITDA, 2024: $7,080MAdjusted EBITDA, 2025: $7,750MAFFO or DCF, 2018: $2,872MAFFO or DCF, 2019: $3,297MAFFO or DCF, 2020: $3,638MAFFO or DCF, 2021: $4,073MAFFO or DCF, 2022: $4,918MAFFO or DCF, 2023: $5,213MAFFO or DCF, 2024: $5,378MAFFO or DCF, 2025: $5,858MAdjusted EBITDA, and the cash flow that reached ownersAdjusted EBITDA by year in billions of US dollars, with available funds from operations (AFFO, called distributable cash flow in 2018 and 2019) from 2018. EBITDA went from $4.4B in 2016 to $7.75B in 2025 and AFFO from $2.9B in 2018 to $5.9B in 2025.$0$2B$4B$6B$8B’16’17’18’19’20’21’22’23’24’25Adjusted EBITDA, 2016: $4,436MAdjusted EBITDA, 2017: $4,531MAdjusted EBITDA, 2018: $4,638MAdjusted EBITDA, 2019: $5,015MAdjusted EBITDA, 2020: $5,105MAdjusted EBITDA, 2021: $5,635MAdjusted EBITDA, 2022: $6,418MAdjusted EBITDA, 2023: $6,779MAdjusted EBITDA, 2024: $7,080MAdjusted EBITDA, 2025: $7,750MAFFO or DCF, 2018: $2,872MAFFO or DCF, 2019: $3,297MAFFO or DCF, 2020: $3,638MAFFO or DCF, 2021: $4,073MAFFO or DCF, 2022: $4,918MAFFO or DCF, 2023: $5,213MAFFO or DCF, 2024: $5,378MAFFO or DCF, 2025: $5,858MAdjusted EBITDA, and the cash flow that reached ownersAdjusted EBITDA by year in billions of US dollars, with available funds from operations (AFFO, called distributable cash flow in 2018 and 2019) from 2018. EBITDA went from $4.4B in 2016 to $7.75B in 2025 and AFFO from $2.9B in 2018 to $5.9B in 2025.$0$2B$4B$6B$8B’16’17’18’19’20’21’22’23’24’25Adjusted EBITDA, 2016: $4,436MAdjusted EBITDA, 2017: $4,531MAdjusted EBITDA, 2018: $4,638MAdjusted EBITDA, 2019: $5,015MAdjusted EBITDA, 2020: $5,105MAdjusted EBITDA, 2021: $5,635MAdjusted EBITDA, 2022: $6,418MAdjusted EBITDA, 2023: $6,779MAdjusted EBITDA, 2024: $7,080MAdjusted EBITDA, 2025: $7,750MAFFO or DCF, 2018: $2,872MAFFO or DCF, 2019: $3,297MAFFO or DCF, 2020: $3,638MAFFO or DCF, 2021: $4,073MAFFO or DCF, 2022: $4,918MAFFO or DCF, 2023: $5,213MAFFO or DCF, 2024: $5,378MAFFO or DCF, 2025: $5,858M
Both are the company’s non-GAAP measures. AFFO is cash from operations before changes in working capital, less preferred dividends and net distributions to minority owners, and it is before all capital spending. 2016 and 2017 are blank because the company then reported a different measure for the parent alone. 2018 and 2019 are distributable cash flow, the earlier name. Until August 2018 the numbers include Williams Partners as a majority-owned subsidiary. Source Annual results releases, 2016 to 2025, and XBRL company facts [9][10][11][12][13][4][6]. Reported by the company.
Show the numbers
Adjusted EBITDA, and the cash flow that reached owners
2016201720182019202020212022202320242025
Adjusted EBITDA (reported)$4,436M$4,531M$4,638M$5,015M$5,105M$5,635M$6,418M$6,779M$7,080M$7,750M
AFFO or DCF (reported)––$2,872M$3,297M$3,638M$4,073M$4,918M$5,213M$5,378M$5,858M

The toll road itself: where the money comes from

The company reports four segments plus an Other. Almost three quarters of adjusted EBITDA comes from the first two.

Where adjusted EBITDA comes from

US$; Adjusted EBITDA as the company defines it, by segment.

Adjusted EBITDA by segment
2025Share of totalNine months to Sep 2026Change on 2025 nine months
Transmission, Power & Gulf (reported)$3,710M47.9%$2,999M+10.6%
Northeast G&P (reported)$2,028M26.2%$1,606M+5.7%
West (reported)$1,450M18.7%$1,170M+10.2%
Gas & NGL Marketing Services (reported)$193M2.5%$230M+52.3%
Other, including upstream (reported)$369M4.8%$209M−23.2%
Total (reported)$7,750M100%$6,214M+8.7%
Nine-month change compares with the same nine months of 2025. Other includes upstream interests in the Haynesville and Wamsutter areas; the South Mansfield interests were sold in January 2026 for $398M. Source 2025 and third-quarter 2026 releases; Q3 10-Q [4][3][5]. Shares and changes are calculated.

Transmission, Power and Gulf

This segment earned $3.71B in 2025, 48% of the total (calculated).4 Its core is three regulated interstate pipelines. Transco runs about 9,600 miles from Texas and the Gulf through the southeast and mid-Atlantic to the New York area, with design capacity of about 20.6 million dekatherms a day, 62 compressor stations and about 188 billion cubic feet of storage available to its customers. Northwest Pipeline (NWP) runs 3,900 miles from the San Juan basin to the Canadian border. MountainWest, bought in 2023 for $1.0B, adds 2,200 miles in the Rockies and 64 billion cubic feet of storage.713 It also holds half of the 745-mile Gulfstream line to Florida, six Gulf Coast storage fields with about 120 billion cubic feet, and Gulf of America gathering lines, platforms and crude pipelines.7

These pipelines are paid for capacity that customers reserve, whether or not they use it. In 2025 Transco’s customers reserved about 20.8 million dekatherms a day on average and flowed about 15.0 million, and the bill is on the reserved number.3 The regulator, the Federal Energy Regulatory Commission (FERC), sets the rates in a rate case; the 10-Q says changes in commodity prices and volumes have a limited near-term effect on these revenues because most of the cost of service is recovered through the reservation charge.5 In 2025 these regulated transportation, storage and other revenues were $3.65B (reported).3 The top ten customers made up 44% of them, and Transco’s three largest 22% of its revenue.7 Transco’s last rate case ran from a filing in August 2024 to a settlement the FERC approved on 30 December 2025, effective 1 March 2026; refunds for the gap were paid in April 2026.5

The newest piece is power. Williams builds gas-fired power generation next to the data centres and plants that need it, and sells the output under long contracts. It has five projects in a joint venture it calls Pantheon: Socrates (556 megawatts in Ohio, with the first half in service in late July 2026 and the second due this quarter), Apollo (490 megawatts, Ohio), Aquila (520 megawatts, Utah), Socrates the Younger (340 megawatts, Ohio) and Neo (682 megawatts, Ohio), which add up to about 2,590 megawatts.5 The contracts run 10 to 12.5 years, are primarily fixed price, and give the customer an option to extend. Williams named no customers in the filings I read, and I name none.5 The company says it has more than 6 gigawatts of backlog, and it expects to announce more power projects soon.143 In July it sold 49% of the five projects to funds led by Blackstone, with Apollo and KKR alongside, for $5.34B of committed capital.14 I come back to what that deal means for owners below.

The one in-service example gives a first look at the economics. Socrates South is under an operating lease with fixed payments of about $205M a year for 2027 through 2031, on $1.0B of gross assets, and it earned $35M of fixed lease income in the third quarter, its first.5 That is a revenue yield of about 20% on cost before any operating cost, and I use 17% for EBITDA in my base, which is my estimate (estimate).

Northeast gathering and processing

Northeast G&P earned $2.03B in 2025, 26% of the total (calculated).4 It gathers and processes gas from the Marcellus and Utica shales in Pennsylvania, New York, Ohio and West Virginia, through consolidated ventures in which Williams owns 65% (the Northeast JV) and 66% (Cardinal), plus a 50% stake in Blue Racer.5 It gathered about 4.1 billion cubic feet a day on the consolidated systems in the first nine months and processed about 2.0 billion, and EBITDA grew 6% over nine months.3 Fees are the product; the volumes depend on producers drilling.

West

West earned $1.45B in 2025, 19% of the total (calculated). It spans the Haynesville, Eagle Ford, Barnett, DJ, Piceance and Wamsutter areas, plus NGL storage and a half interest in the Conway fractionator.54 On 3 September 2026 Williams closed on Momentum Midstream for about $5.1B, paid in cash, 26.9 million of its own shares, and $869M of debt it left in place. Momentum has 6 billion cubic feet a day of gathering capacity and 4 billion of pipeline capacity in the Haynesville, and it contributed $113M of revenue and $40M of segment EBITDA in its first 28 days.515 The weighted-average time until its customer contracts come up for renewal is about nine years.5 The segment also carries a cost: minimum volume commitments in the Eagle Ford are stepping down in 2026.5

Marketing, and the commodity exposure that is left

Gas and NGL marketing earned $193M of adjusted EBITDA in 2025, 2.5% of the total (calculated). Its derivatives swing reported earnings: a $116M unfavourable change in the first nine months of 2026.73 About 93% of NGL production was under fee-based contracts in 2025 and 7% under contracts that pay in barrels of NGLs.7 The upstream interests are the one place with direct price risk, now smaller after the South Mansfield sale.5

How much of it is contracted

At 30 September 2026 Williams had $32.5B of remaining performance obligations, the revenue it has contracted for and will earn if customers keep their contracts; $21.0B of that is Transco and $4.0B NWP.5 For the interstate pipelines, the figure assumes today’s rates, which the FERC can change in a future rate case. It leaves out renewals and customers who have not signed. In 2027 alone it is $4.72B, which is 56% of the company’s 2026 EBITDA guide (calculated); the figure is revenue, not profit, so I read it as the size of the base and not as a profit forecast.53

Revenue already contracted

US$; transaction price allocated to remaining performance obligations at 30 September 2026.

Revenue already contracted
WilliamsTranscoNWP
2026, last three months (reported)$1,202M$761M$105M
2027 (reported)$4,720M$2,934M$419M
2028 (reported)$4,239M$2,655M$399M
2029 (reported)$3,773M$2,370M$373M
2030 (reported)$3,034M$1,843M$367M
Thereafter (reported)$15,573M$10,467M$2,345M
Total (reported)$32,541M$21,030M$4,008M
Excludes renewals not yet exercised, variable consideration and facilities that have not received FERC authorization. Source Q3 2026 10-Q, Note 4 [5]. Reported by the company.

Where the cash goes

The company expects $7.3B to $7.9B of growth capital in 2026, up from $6.1B to $6.7B in its February guide, plus $850M to $950M of maintenance capital. The plan names the power projects, Transco expansions, Haynesville growth and the Northeast as the main uses.435 Larger projects include the Southeast Supply Enhancement (about 1.6 billion cubic feet a day, FERC-approved January 2026, in service as early as the third quarter of 2027), the Northeast Supply Enhancement (400 million a day), Power Express (800 million a day, 2030) and Line 200, the 3.1 billion a day pipeline to the Louisiana LNG plant, in which Williams owns 80% of the pipe and 10% of the plant.57 Those projects are the whole growth case, and the reason owner cash falls so far short of AFFO.

The moat

A durable business keeps others from taking its profit. For a pipeline the protection is physical and legal: nobody lays a competing line beside a full one without years of permits, and the toll comes from a regulator or a contract. The ten-year record shows what that did for owners, and it is mixed.

Cash per share against the dividend

US$ per share, calendar years

  • AFFO per share $4.78 in 2025
  • Dividend $2.00
Cash per share against the dividendAFFO per share and the dividend declared per share, by year from 2018. AFFO per share went from $2.95 in 2018 to $4.78 in 2025. The dividend went from $1.36 to $2.00.$0$2$4$6’18’20’22’24AFFO per share, 2018: $2.95AFFO per share, 2019: $2.72AFFO per share, 2020: $2.99AFFO per share, 2021: $3.34AFFO per share, 2022: $4.02AFFO per share, 2023: $4.26AFFO per share, 2024: $4.40AFFO per share, 2025: $4.78Dividend per share, 2018: $1.36Dividend per share, 2019: $1.52Dividend per share, 2020: $1.60Dividend per share, 2021: $1.64Dividend per share, 2022: $1.70Dividend per share, 2023: $1.79Dividend per share, 2024: $1.90Dividend per share, 2025: $2.00Cash per share against the dividendAFFO per share and the dividend declared per share, by year from 2018. AFFO per share went from $2.95 in 2018 to $4.78 in 2025. The dividend went from $1.36 to $2.00.$0$2$4$6’18’19’20’21’22’23’24’25AFFO per share, 2018: $2.95AFFO per share, 2019: $2.72AFFO per share, 2020: $2.99AFFO per share, 2021: $3.34AFFO per share, 2022: $4.02AFFO per share, 2023: $4.26AFFO per share, 2024: $4.40AFFO per share, 2025: $4.78Dividend per share, 2018: $1.36Dividend per share, 2019: $1.52Dividend per share, 2020: $1.60Dividend per share, 2021: $1.64Dividend per share, 2022: $1.70Dividend per share, 2023: $1.79Dividend per share, 2024: $1.90Dividend per share, 2025: $2.00Cash per share against the dividendAFFO per share and the dividend declared per share, by year from 2018. AFFO per share went from $2.95 in 2018 to $4.78 in 2025. The dividend went from $1.36 to $2.00.$0$2$4$6’18’19’20’21’22’23’24’25AFFO per share, 2018: $2.95AFFO per share, 2019: $2.72AFFO per share, 2020: $2.99AFFO per share, 2021: $3.34AFFO per share, 2022: $4.02AFFO per share, 2023: $4.26AFFO per share, 2024: $4.40AFFO per share, 2025: $4.78Dividend per share, 2018: $1.36Dividend per share, 2019: $1.52Dividend per share, 2020: $1.60Dividend per share, 2021: $1.64Dividend per share, 2022: $1.70Dividend per share, 2023: $1.79Dividend per share, 2024: $1.90Dividend per share, 2025: $2.00
AFFO per share is my division of the company’s AFFO by weighted diluted shares. 2018 carries only part of the year’s share issue for the Williams Partners merger, so it is overstated. The 2025 payout was 42% of AFFO. Source Annual results releases, 2016 to 2025, and XBRL company facts [9][10][11][12][13][4][6]. Calculated from reported figures.
Show the numbers
Cash per share against the dividend
20182019202020212022202320242025
AFFO per share (calculated)$2.95$2.72$2.99$3.34$4.02$4.26$4.40$4.78
Dividend per share (calculated)$1.36$1.52$1.60$1.64$1.70$1.79$1.90$2.00

AFFO per share went from $2.95 in 2018 to $4.78 in 2025, which is 7.1% a year, and the dividend from $1.36 to $2.00, which is 5.7% a year (calculated).1146 Adjusted EBITDA grew from $4.44B in 2016 to $7.75B in 2025, 6.4% a year (calculated).94 The share count went from 751M diluted weighted in 2016 to 1,225M in 2025, because Williams sold $2.1B of stock in 2017 and in 2018 bought in the public units of its subsidiary Williams Partners (the WPZ merger) with shares.611 The first line to read in the story is the 2016 dividend: it was cut from $0.64 to $0.20 a quarter that year, and raised to $0.30 in 2017.10 That was a company with too much debt and too little cash, and it is why the leverage chart below starts at 5.3 times.

The share price over ten years

Last close of each calendar quarter, NYSE, log scale, not adjusted for dividends

  • Close, Q4 2026 $67.86
The share price over ten yearsQuarter-end closes on a log scale, from $31.14 in the fourth quarter of 2016 to $67.86. The lowest close was $9.25 on 18 March 2020. The highest was $79.40 on 19 May 2026.$16$25$40$63’17’18’19’20’21’22’23’24’25’26The share price over ten yearsQuarter-end closes on a log scale, from $31.14 in the fourth quarter of 2016 to $67.86. The lowest close was $9.25 on 18 March 2020. The highest was $79.40 on 19 May 2026.$16$25$40$63’17’18’19’20’21’22’23’24’25’26The share price over ten yearsQuarter-end closes on a log scale, from $31.14 in the fourth quarter of 2016 to $67.86. The lowest close was $9.25 on 18 March 2020. The highest was $79.40 on 19 May 2026.$16$25$40$63’17’18’19’20’21’22’23’24’25’26
The share went from $31.14 at the end of 2016 to $9.25 in March 2020, and then to $67.86, so a holder at the 2016 close has had a gain of 118% in price over ten years (calculated), with $14.71 a share of dividends declared over 2017 to 2025 on top. Source Daily closes and annual dividends from filings [1][6].

A holder at the end of 2016 had a price of $31.14 and now has $67.86, plus $14.71 a share of dividends declared from 2017 to 2025 (calculated).16 The price fell to $20.05 at the end of 2020 and was $26.04 at the end of 2021. The big move came after: $34.83 at the end of 2023, $54.12 a year later and $60.11 at the end of 2025.1 I read that as two things at once, a better business and a higher multiple on it, and the next chart separates them.

What the market paid for a dollar of EBITDA

Enterprise value over adjusted EBITDA, year-end closes

  • EV / EBITDA 14.9x now
What the market paid for a dollar of EBITDAMarket value plus net debt, minority interests and preferred, divided by that year’s adjusted EBITDA, at each year-end from 2019 and at the 4 November 2026 close on trailing twelve-month EBITDA. It was 10.7 times at the end of 2019, between 9.7 and 10.2 through 2023, 13.5 and 13.6 at the end of 2024 and 2025, and 14.9 now.8x10x12x14x16x’19’21’23’25EV / EBITDA, 2019: 10.7xEV / EBITDA, 2020: 9.7xEV / EBITDA, 2021: 10.0xEV / EBITDA, 2022: 10.2xEV / EBITDA, 2023: 10.2xEV / EBITDA, 2024: 13.5xEV / EBITDA, 2025: 13.6xEV / EBITDA, Nov 2026: 14.9xWhat the market paid for a dollar of EBITDAMarket value plus net debt, minority interests and preferred, divided by that year’s adjusted EBITDA, at each year-end from 2019 and at the 4 November 2026 close on trailing twelve-month EBITDA. It was 10.7 times at the end of 2019, between 9.7 and 10.2 through 2023, 13.5 and 13.6 at the end of 2024 and 2025, and 14.9 now.8x10x12x14x16x’19’20’21’22’23’24’25Nov ’26EV / EBITDA, 2019: 10.7xEV / EBITDA, 2020: 9.7xEV / EBITDA, 2021: 10.0xEV / EBITDA, 2022: 10.2xEV / EBITDA, 2023: 10.2xEV / EBITDA, 2024: 13.5xEV / EBITDA, 2025: 13.6xEV / EBITDA, Nov 2026: 14.9xWhat the market paid for a dollar of EBITDAMarket value plus net debt, minority interests and preferred, divided by that year’s adjusted EBITDA, at each year-end from 2019 and at the 4 November 2026 close on trailing twelve-month EBITDA. It was 10.7 times at the end of 2019, between 9.7 and 10.2 through 2023, 13.5 and 13.6 at the end of 2024 and 2025, and 14.9 now.8x10x12x14x16x’19’20’21’22’23’24’25Nov ’26EV / EBITDA, 2019: 10.7xEV / EBITDA, 2020: 9.7xEV / EBITDA, 2021: 10.0xEV / EBITDA, 2022: 10.2xEV / EBITDA, 2023: 10.2xEV / EBITDA, 2024: 13.5xEV / EBITDA, 2025: 13.6xEV / EBITDA, Nov 2026: 14.9x
Minority interests are at book value, which understates what the Power investor’s stake would cost to buy back. Shares are the weighted diluted count for each year. The calculation starts in 2019, after the 2018 merger removed the public Williams Partners units from the count. Source Year-end closes; annual filings and XBRL [1][6][5]. Calculated from reported figures.
Show the numbers
What the market paid for a dollar of EBITDA
2019202020212022202320242025Nov 2026
EV / adjusted EBITDA (calculated)10.7x9.7x10.0x10.2x10.2x13.5x13.6x14.9x

EBITDA rose 55% from 2019 to 2025 while the multiple paid for it went from 10.7 to 13.6 times, and it is 14.9 now (calculated).61 A pipeline whose protection was priced at 10 times in 2019 and at 15 times today has become more valuable on paper than in cash flow, and a new buyer pays for the protection, not for a bargain.

What does protect it

  • Reservation contracts. Customers pay for capacity whether they use it or not, which is why volume is not the main driver of pipeline revenue. Transco’s contracted revenue at 30 September was $21.0B, with $10.5B beyond 2030.5
  • A regulator that lets them earn on what they spend. New Transco expansions are built against signed customer commitments; the 10-Q says the Transco expansions in the 2026 plan are fully contracted with firm transportation agreements.5 The Northeast Supply Enhancement is fully subscribed under precedent agreements signed in August 2025.5
  • Physical position. Transco links the Gulf Coast and Marcellus supply to the Southeast and the New York area, where there is little spare room; the company says the southeast and Gulf Coast are the fastest growing gas demand regions.7
  • Fee-based gathering with minimum volumes. About 93% of NGL production was under fee-based contracts, and some contracts carry minimum volume commitments that pay a shortfall.7
  • Long contracts on the new power. 10 to 12.5 years, primarily fixed price, with $2.0B of future lease payments already scheduled for Socrates South.5

Where it is thin

Four things. First, the regulator can reset the rate: the 2025 Transco settlement, effective in March 2026, is the current rate, and Transco will be back at the FERC.5 Second, permits can be taken back at the edge. On 8 September 2026 the Third Circuit Court of Appeals vacated the New Jersey Water Quality Certification for the Northeast Supply Enhancement and sent it back to the state, which puts a project meant to be in service as early as the fourth quarter of 2027 in question.5 Third, the gathering business depends on someone else drilling; the Eagle Ford minimum volumes are stepping down this year.5 Fourth, the power contracts end. They run 10 to 12.5 years from 2026 to 2028 and the customer holds the extension options, so the earliest, Socrates, comes up around 2036, which is my terminal year.5

Capital intensity is the quiet part. Maintenance capital is about $0.9B a year, 11% of EBITDA, against $2.3B of depreciation in 2025, and I can’t tell from the filings how much of the $7.6B of growth spending is really holding the base where it is.46 I deal with that in Valuation by testing how little the answer moves when I change the growth budget.

The competitive advantage

The question is what Williams can do that others can’t. On the evidence the answer is position, delivery and the ability to fund it.

On delivery, it raised its 2025 EBITDA guidance three times, by $350M in all, and ended at the $7.75B record, and the company says five-year adjusted EBITDA growth was 9% a year and EPS growth 14% a year to 2025.84 In 2026 it brought Socrates South into service in late July, with the second half due by mid-November, closed Momentum ahead of schedule in the company’s words, and placed four pipeline projects in service, adding 413 million cubic feet a day.35 I can verify the guidance steps and the quarter; I can’t test the 14% a year of EPS beyond what the company says, and it starts from the pandemic year.

On position, the link with demand is the point. The gas leaving the shale fields has to get to buyers that are growing: LNG export docks on the Gulf Coast, gas-fired power plants in the Southeast and Ohio, and industrial users. The Energy Information Administration (EIA) expects US LNG exports of 17.6 billion cubic feet a day in 2026 and 18.6 in 2027.16 Williams’ own proxy cites Wood Mackenzie for US gas demand growth of nearly 35% over the next decade after 73% since 2010.8 Williams has tied itself to the LNG chain on both ends: it owns 10% of Louisiana LNG, builds the pipe that feeds it, manages the gas supply and buys about 10% of the LNG produced.7

On funding, the company is rated BBB+ (stable) by S&P, Baa2 (positive) by Moody’s and BBB (positive) by Fitch, and borrowed $2.75B in September 2026 at 5.0% to 6.4%.517 It raised $3.74B in July by selling a minority share in the power projects and, in 2026, $5.5B of long-term debt; both are real advantages and both are why a holder reads the share count.5

Against its closest rivals

For a pipeline, rivals are other lines to the same markets, and for gathering, other gatherers in the same basin. I have not built a peer table from other companies’ filings, so I print no rival numbers I haven’t checked. The comparison I can make is against the closest page on this site, the pipeline and utility company Enbridge.

Williams against Enbridge, the closest comparison on this site

Return a year is the rate that makes today’s price equal to each page’s own base cash flows. Each page uses its own discount rate and currency, so read the gaps as rough.

Williams and Enbridge
WilliamsEnbridge
What it providesUS gas pipelines, gathering and storage under reservation fees and rate cases, plus new gas-fired power under 10 to 12.5 year contractsCanadian crude and US gas pipelines and gas utilities under tolls and rate cases
Price against my base value0% below, at $67.866% below, at C$69.11
Return a year on my base cash flows9.0%, at a 9.0% rate9.9%, at a 9.0% rate
Return a year on my bear0.2%2.3%
Dividend yield3.1%5.6%
Cash after all capital against the dividend−$2.3B against $2.55B, last twelve monthsC$0.85B against C$8.35B, last twelve months
Main thing I can’t judgeReturn on future growth capital; when cash tax arrivesReturn on future growth capital; the rate
Source This page; the Enbridge page on this site [18]. Enbridge’s figures are from that page. Dividend yields are 2026 dividends over the price.

New supply and new demand

The risk to the advantage isn’t a competing pipe. It is demand that does not show up or arrives late. The EIA’s October outlook shows the share of US electricity from natural gas at 40% in 2025 and 2026 and 39% in 2027, with Henry Hub gas at $3.16 in 2027, 9% lower than in 2026, so the data-centre story is not visible in the national gas-share number yet.16 Williams’ power projects are contracted at fixed prices on 10 to 12.5 years, which protects it from that. The pipeline expansions lean on utilities and LNG buyers who have signed commitments. What is not protected is the next set: the company says its backlog is more than 6 gigawatts against 2.6 announced, and the filings I read name no customer or contract for the difference.14

Management

Chad Zamarin became president and chief executive on 1 July 2025 and joined the board, after Alan Armstrong ran the company for 14 years as chief executive and moved to executive chair. Stephen Bergstrom is the independent lead director.8 John Porter is chief financial officer and Larry Larsen chief operating officer since 2025.7 The proxy calls this a multi-year planned transition, and the proxy says Zamarin, the newest director, facilitated multiple of the company’s acquisitions.8 In July 2026 the board added two directors, going from ten seats to twelve, and in August Michael Creel said he will leave the board at the 2027 annual meeting.1920 Armstrong is still on the payroll and the board, which means the person who built the plan and the person who is paid to carry it out are in the same room.

How they are paid, and what that pays them to do

Zamarin’s 2025 pay was $8.68M: $0.83M of salary, $6.0M of stock awards, a $1.49M annual bonus, $0.33M of pension value and $0.03M of other items. It was $4.92M in 2024 and $5.02M in 2023 (calculated). The board says 90% of the chief executive’s target pay is at risk, and the pay ratio to the median employee is 61 to 1.8 Armstrong’s 2025 pay was $17.9M, of which $13.5M was stock awards.8

The annual bonus for 2025 was based on adjusted EBITDA and environmental and safety measures. The stock units that vest after three years pay out on two measures: AFFO per share and, since the 2025 awards, cash return on invested capital (CROIC), with relative total return against peers able to raise or lower the result by 25%. Before 2025 the second measure was return on capital employed.8 The 2022 awards, which vested in February 2025, paid 191.7% of target, because AFFO per share beat the stretch goal and the company’s annualised return of 30.9% put it in the top third of peers.8

I read this plan two ways. First, adjusted EBITDA and AFFO per share both count cash before growth capital, so they reward getting cash flow up and don’t ask what the capital cost. That is the same incentive I would expect to sit behind a growth company that borrows to pay its dividend. Second, CROIC is a return-on-capital measure, so in principle a project that earns less than the company’s average pulls it down. That is a test the Enbridge page found missing in that company’s plan, and it carries half the weight in Williams’s performance units. The test I can’t make is whether the target is hard: the proxy states the 2022 target for return on capital employed, 9.65%, and not the new CROIC targets I could compare.8

How much of their own money is in

A good deal. At 24 February 2026 Armstrong owned 2.89M shares including units about to vest, worth about $196M at today’s price (calculated); Zamarin 587,470, about $40M; Porter 251,794, about $17M. The 25 directors and executive officers together owned 4.46M shares, 0.4% of the company.8 The rules require the chief executive to keep shares worth six times base pay and other named executives three times, with 50% of after-tax vested stock kept until they get there, and directors five times the amount the proxy sets for them.8 That is a real stake and a smaller share than at a founder-led company. In the quarter to 30 September no director or officer adopted or ended a trading plan, and the general counsel filed a notice of a proposed sale on 2 November; I took no view from it.521

What they did with capital over a full cycle

What management did with the money

Major uses of capital since 2016, and my reading of each.

Capital allocation, 2016 to 2026
MoveWhat it cost or raisedMy reading
Dividend cut, 2016Quarterly dividend cut from $0.64 to $0.20 in the third quarter, raised to $0.30 in 201710A hard reset that came with five years of cash going to debt. Leverage fell from 5.3 times at the end of 2016 to 3.5 at the end of 2022 (calculated)
Stock sale and Geismar, 2017$2.1B of common stock sold; the Geismar olefins interest sold for a $1.095B gain610Sold an unrelated plant and sold stock to fund the pipeline plan. Sensible in direction; the stock sale was done at about $31
Williams Partners roll-up, 2018Public units of the subsidiary bought in with shares; diluted shares went from 829M in 2017 to 1,214M in 2019611Minority distributions fell from $822M to $124M, and the share count rose by half. It simplified the structure and cost owners a larger share count (calculated)
Growth spending, 2020 to 2025$14.7B of capital expenditures, $4.9B of acquisitions and $1.4B of equity investments; adjusted EBITDA up $2.7B from 2019 to 20256114About 5.8 times EBITDA on growth spending alone, if maintenance was near $0.85B a year, and 7.7 on everything, which is a good record (estimate). It includes rate increases and a 2020 base
MountainWest and Gulf Coast storage$1.0B in 2023; $1.84B in January 2024134Pipelines and storage bought at fair prices in the segment the company knows. Neither was a stretch
Buybacks$9M in 2022 and $130M in 2023 under a $1.5B plan authorized in 2021; none since, $1.36B unused65Token. The cash goes to building, and the share count is up 2.3% since February
DividendRaised every year since 2017; $2.00 in 2025 and $2.10 for 20264Disciplined, and 5.7% a year since 2018 (calculated)
Momentum, 2026$5.1B in cash, 26.9M shares and $869M of assumed debt5Priced at about 9 to 10 times annualised EBITDA by my estimate, a fair price for 6 billion cubic feet a day of Haynesville gathering. It cost owners 2.2% of the share count (estimate)
Power investor, 2026$5.34B of committed capital for 49% of five power projects, with a target return of 6.35%1422Cheap money that shares the early cash and not the long-run upside. It lowers what Williams pays for growth and raises what leaves as distributions
Source Annual releases; XBRL; Q3 2026 10-Q; July 2026 8-K [10][11][13][4][6][5][14]. Readings are mine.

On the whole this is a team that repaired the balance sheet in 2016 and 2017 and has built steadily since, paying a rising dividend and buying at fair prices. The record also shows the cost: net debt went from $23.3B at the end of 2016 to $32.2B, the diluted share count from 751M to 1,255M including awards, and the 2026 plan spends more than operating cash flow can cover. That is not a mistake; it is what building looks like when new capital earns somewhat more than it costs. I give credit for a clear plan and for the cut when it was needed, and I count the stock issued and the investor’s claim on the power cash as costs.

Financials

Reading Williams’s statements takes care, because five things in them do not mean what they seem to.

  • Revenue is partly pass-through. It was $12.5B over the last twelve months, but $2.74B of nine-month revenue was product sales of gas and NGLs bought and resold, and derivative gains and losses sit in the line. The segment fees are the business.63
  • Reported earnings swing on one-offs. Net income in the nine months was $2.39B against adjusted net income of $2.17B, because of gains on asset sales and changes in the fair value of derivatives.3
  • AFFO is before all capital spending. It starts from operating cash flow, takes out working capital, preferred dividends and minority distributions, and stops. It does not take off the $0.9B of maintenance capital or the $6B or more of growth capital, which is why the 2.4 times dividend cover the company reports is not the whole picture.3
  • Adjusted EBITDA includes a share of partners’ businesses. About $1.0B of the 2026 figure is Williams’s proportional share of EBITDA from the pipelines and plants it owns jointly, whose cash arrives as distributions after their own costs.3
  • Debt measures differ. The company’s ratio is 3.80 times at 30 September, after subtracting $857M of cash it spent on long-lead power equipment that the customer would reimburse if an order were cancelled. Mine, which counts all debt and subtracts only cash, is 3.90.35

Ten years and the last twelve months

Calendar years, US$ unless marked; as reported in each year’s filing. * Operating cash flow less capital expenditures, equity-method investments and minority distributions; stock pay for the TTM is 2025.

Financial summary by year
2016201720182019202020212022202320242025TTM
Revenue (reported)$7,499M$8,031M$8,686M$8,201M$7,719M$10,627M$10,965M$10,907M$10,503M$11,950M$12,504M
Adjusted EBITDA (reported)$4,436M$4,531M$4,638M$5,015M$5,105M$5,635M$6,418M$6,779M$7,080M$7,750M$8,247M
AFFO (DCF in 2018 and 2019) (reported)––$2,872M$3,297M$3,638M$4,073M$4,918M$5,213M$5,378M$5,858M$6,456M
Weighted diluted shares, millions (reported)7518289741,2141,2151,2181,2231,2231,2231,2251,230
AFFO per share (calculated)––$2.95$2.72$2.99$3.34$4.02$4.26$4.40$4.78$5.25
Dividend per share declared (reported)$1.68$1.20$1.36$1.52$1.60$1.64$1.70$1.79$1.90$2.00$2.075
Dividends paid as share of AFFO (calculated)––48%56%53%49%42%42%43%42%39%
Net income attributable to Williams (reported)−$424M$2,174M−$155M$850M$211M$1,517M$2,049M$3,179M$2,225M$2,618M$3,126M
Operating cash flow (reported)$4,155M$3,089M$3,293M$3,693M$3,496M$3,945M$4,889M$5,938M$4,974M$5,898M$6,060M
Capital expenditures (reported)$2,051M$2,399M$3,256M$2,109M$1,239M$1,239M$2,253M$2,516M$2,573M$4,893M$7,637M
Equity-method investments (reported)–––$453M$325M$115M$166M$141M$114M$511M$475M
Minority distributions (reported)$940M$822M$591M$124M$185M$187M$204M$213M$242M$259M$277M
Cash after all capital* (calculated)$1,164M−$132M−$554M$1,007M$1,747M$2,404M$2,266M$3,068M$2,045M$235M−$2,332M
Acquisitions (reported)$0M$0M$0M$728M$0M$151M$933M$1,568M$2,244M$1M$2,816M
Common dividends paid (reported)$1,261M$992M$1,386M$1,842M$1,941M$1,992M$2,071M$2,179M$2,316M$2,442M$2,550M
Stock-based pay (reported)$73M$78M$55M$57M$52M$81M$73M$77M$99M$93M$93M*
Cash income taxes paid (reported)–––––––$31M$68M$162M–
Net debt (calculated)$23,332M$20,036M$22,246M$21,999M$22,202M$21,995M$22,752M$24,288M$26,851M$29,298M$32,178M
Net debt over adjusted EBITDA (calculated)5.3x4.4x4.8x4.4x4.3x3.9x3.5x3.6x3.8x3.8x3.9x
TTM is 2025 plus the nine months to 30 September 2026, less the same period of 2025. TTM AFFO per share divides by 1,230M, the average of recent diluted counts. Net debt is long-term debt, current maturities and commercial paper, less cash, from the 10-Ks; 2016 and 2017 include the public units of Williams Partners as minority interests. Cash taxes paid appear in the 10-Ks from 2023. The 2023 operating cash flow is the restated figure; the original release said $6,055M, and the 2023 capital expenditures are $2,516M as restated against $2,633M originally. Source Annual results releases, 2016 to 2025, and XBRL company facts [9][10][11][12][13][4][6]; Q3 2026 10-Q and release [5][3]. Calculated from reported figures where marked.

The latest quarter

The third-quarter report came out after the close on 2 November. Adjusted EBITDA was $2.039B against $1.920B a year before, up 6%; AFFO was $1.589B, up 10%; adjusted earnings per share were $0.54 against $0.49; net income to common holders was $699M; and cash from operations was $1.505B, up 5%. Dividend cover on AFFO was 2.42 times.3 The company said it is tracking toward the upper half of its $8.3B to $8.5B EBITDA range, kept growth capital at $7.3B to $7.9B and put year-end leverage near 3.75 times by its own measure.3

The share price moved a lot around the report. The stock fell 4.2% on 2 November, from $74.35 to $71.19, before the release; rose 1.8% to $72.47 on 3 November, the day of the call; and fell 6.4% to $67.86 on 4 November on 20.5M shares, against 6.9M to 9.0M a day on 29 October, 30 October and 2 November.12 I do not know why. I found no company filing on 4 November. The 2 November filings include a prospectus that lets the former Momentum owners resell up to 26.9M shares, 2.1% of the company, with a cap of 537,496 shares a day among those under lock-up through 3 March 2027, which is about 4% of the roughly 12M extra shares traded on 4 November, so it can only be a small part of the story.15 I treat it as supply the market has to absorb, and it is already in my share count.

What an owner can really take out

Here is the sequence that matters. Over the twelve months to September, AFFO was $6.46B. Maintenance capital took about $0.9B, which is my estimate from the guide, and growth capital and equity investments about $7.2B, since capital expenditures were $7.64B and equity-method investments $0.47B (calculated).36 That leaves about −$1.7B after stock pay of roughly $0.1B. Using the cash flow statement instead, the figure after every dollar of capital and the minority owners is −$2.33B (calculated). Common dividends paid were $2.55B. So the business did not pay its dividend out of owner cash in the last twelve months, and in 2025 it covered only 10% of it (calculated).

Cash after all capital spending, against the dividend

US$. Cash after all capital is operating cash flow less every dollar of capital expenditures and equity-method investments, minority distributions and preferred dividends. Acquisitions are shown separately

  • Cash after all capital −$2.33B, TTM
  • Common dividends $2.55B, TTM
Cash after all capital spending, against the dividendOperating cash flow less capital expenditures, equity-method investments, minority distributions and preferred dividends, against common dividends paid, by year and for the twelve months to September 2026. In 2025 it was $0.23B against $2.44B of dividends. For the twelve months to September 2026 it was −$2.33B against $2.55B.−$3B$0$3B’16’18’20’22’24TTMCash after all capital, 2016: $1,164MCash after all capital, 2017: −$132MCash after all capital, 2018: −$554MCash after all capital, 2019: $1,007MCash after all capital, 2020: $1,747MCash after all capital, 2021: $2,404MCash after all capital, 2022: $2,266MCash after all capital, 2023: $3,068MCash after all capital, 2024: $2,045MCash after all capital, 2025: $235MCash after all capital, TTM: −$2,332MCommon dividends, 2016: $1,261MCommon dividends, 2017: $992MCommon dividends, 2018: $1,386MCommon dividends, 2019: $1,842MCommon dividends, 2020: $1,941MCommon dividends, 2021: $1,992MCommon dividends, 2022: $2,071MCommon dividends, 2023: $2,179MCommon dividends, 2024: $2,316MCommon dividends, 2025: $2,442MCommon dividends, TTM: $2,550MCash after all capital spending, against the dividendOperating cash flow less capital expenditures, equity-method investments, minority distributions and preferred dividends, against common dividends paid, by year and for the twelve months to September 2026. In 2025 it was $0.23B against $2.44B of dividends. For the twelve months to September 2026 it was −$2.33B against $2.55B.−$3B$0$3B’16’17’18’19’20’21’22’23’24’25TTMCash after all capital, 2016: $1,164MCash after all capital, 2017: −$132MCash after all capital, 2018: −$554MCash after all capital, 2019: $1,007MCash after all capital, 2020: $1,747MCash after all capital, 2021: $2,404MCash after all capital, 2022: $2,266MCash after all capital, 2023: $3,068MCash after all capital, 2024: $2,045MCash after all capital, 2025: $235MCash after all capital, TTM: −$2,332MCommon dividends, 2016: $1,261MCommon dividends, 2017: $992MCommon dividends, 2018: $1,386MCommon dividends, 2019: $1,842MCommon dividends, 2020: $1,941MCommon dividends, 2021: $1,992MCommon dividends, 2022: $2,071MCommon dividends, 2023: $2,179MCommon dividends, 2024: $2,316MCommon dividends, 2025: $2,442MCommon dividends, TTM: $2,550MCash after all capital spending, against the dividendOperating cash flow less capital expenditures, equity-method investments, minority distributions and preferred dividends, against common dividends paid, by year and for the twelve months to September 2026. In 2025 it was $0.23B against $2.44B of dividends. For the twelve months to September 2026 it was −$2.33B against $2.55B.−$3B$0$3B’16’17’18’19’20’21’22’23’24’25TTMCash after all capital, 2016: $1,164MCash after all capital, 2017: −$132MCash after all capital, 2018: −$554MCash after all capital, 2019: $1,007MCash after all capital, 2020: $1,747MCash after all capital, 2021: $2,404MCash after all capital, 2022: $2,266MCash after all capital, 2023: $3,068MCash after all capital, 2024: $2,045MCash after all capital, 2025: $235MCash after all capital, TTM: −$2,332MCommon dividends, 2016: $1,261MCommon dividends, 2017: $992MCommon dividends, 2018: $1,386MCommon dividends, 2019: $1,842MCommon dividends, 2020: $1,941MCommon dividends, 2021: $1,992MCommon dividends, 2022: $2,071MCommon dividends, 2023: $2,179MCommon dividends, 2024: $2,316MCommon dividends, 2025: $2,442MCommon dividends, TTM: $2,550M
The Power investor’s $3.74B, received in July 2026, is partner capital and is not in this cash flow; it sits in financing. Acquisitions are not counted here either: $2.8B for Momentum in the twelve months to September 2026 and $2.2B in 2024. TTM is the twelve months to 30 September 2026. Source Annual results releases, 2016 to 2025, and XBRL company facts [9][10][11][12][13][4][6]; Q3 2026 10-Q and release [5][3]. Calculated from reported figures.
Show the numbers
Cash after all capital spending, against the dividend
2016201720182019202020212022202320242025TTM
Operating cash flow (reported)$4,155M$3,089M$3,293M$3,693M$3,496M$3,945M$4,889M$5,938M$4,974M$5,898M$6,060M
Capital expenditures (reported)$2,051M$2,399M$3,256M$2,109M$1,239M$1,239M$2,253M$2,516M$2,573M$4,893M$7,637M
Equity-method investments (reported)–––$453M$325M$115M$166M$141M$114M$511M$475M
Minority distributions (reported)$940M$822M$591M$124M$185M$187M$204M$213M$242M$259M$277M
Cash after all capital (calculated)$1,164M−$132M−$554M$1,007M$1,747M$2,404M$2,266M$3,068M$2,045M$235M−$2,332M
Common dividends paid (reported)$1,261M$992M$1,386M$1,842M$1,941M$1,992M$2,071M$2,179M$2,316M$2,442M$2,550M

The gap was paid for with $5.5B of new long-term debt in nine months, less $1.1B of repayments and $0.7B of commercial paper, and with $3.74B from the power investor, $0.5B of asset sales and a rise in cash from $63M to $1.76B.5 I show the investor’s money separately because it is partner capital: it buys 49% of the cash from five projects, and for a holder of the common stock it is a claim ahead of them. Every pipeline company that grows runs this way. What it means for a holder is that the dividend measures what the business can pay if it keeps growing, and not what it can pay out of cash left over today. The easy way out is to spend less on growth, since most of the $7.6B is discretionary until it is built, and that is the main reason I think the dividend is safe at 40% of AFFO. The cost is the growth.

The ten-year view is better: cash after all capital was positive every year from 2019 to 2024, between $1.0B and $3.1B, and covered the dividend in 2021, 2022 and 2023 (calculated). 2025 and the last twelve months are when the build started to run ahead of it. The company harvested its base for several years and has chosen to spend again.

Stock pay is a small matter. Equity-settled awards were $93M in 2025 and $65M in nine months of 2026, about 1.6% of AFFO, and the shares come from new issues, so I deduct about $0.1B a year in the model.65 Buybacks were $139M in two years, so they don’t offset it.

Cash taxes are the question I can’t settle from the filings. Williams booked an income tax provision of $857M in 2025, a 23.7% rate, and paid $162M in cash, $68M in 2024 and $31M in 2023; $744M of the 2025 provision was deferred, and deferred tax liabilities were $5.17B at year-end.76 The 2025 tax law restored full bonus depreciation for good, which keeps the deferral going as long as the company keeps spending; in the nine months of 2026, $716M of a $725M provision was deferred.73 If growth spending falls to the level of depreciation, the deferral stops growing and cash taxes move toward the book charge. In my base the 2036 numbers are EBITDA of $16.0B, depreciation of about $4.0B on my estimate and interest of $3.2B, which leaves about $8.8B of taxable income and $2.1B of tax at 23.7%, or 13% of EBITDA against about 2% in 2025 (estimate). That is why my model lets cash conversion fall from 96.0% of EBITDA in 2027 to 85.2% in 2036, and the choice is worth about $12 a share against keeping it at 96%.

Net debt against adjusted EBITDA

Debt including commercial paper and current maturities, less cash, divided by adjusted EBITDA

  • Net debt / EBITDA 3.90x at 30 September 2026
Net debt against adjusted EBITDANet debt divided by adjusted EBITDA, my calculation, by year-end. It was 5.3 in 2016 and 4.8 in 2018, fell to 3.5 in 2022, and was 3.8 at the end of 2025 and 3.9 at 30 September 2026. The company’s own ratio for September is 3.80.3x4x5x6x’16’18’20’22’24Sep ’26Net debt / adjusted EBITDA, 2016: 5.26xNet debt / adjusted EBITDA, 2017: 4.42xNet debt / adjusted EBITDA, 2018: 4.80xNet debt / adjusted EBITDA, 2019: 4.39xNet debt / adjusted EBITDA, 2020: 4.35xNet debt / adjusted EBITDA, 2021: 3.90xNet debt / adjusted EBITDA, 2022: 3.55xNet debt / adjusted EBITDA, 2023: 3.58xNet debt / adjusted EBITDA, 2024: 3.79xNet debt / adjusted EBITDA, 2025: 3.78xNet debt / adjusted EBITDA, Sep 2026: 3.90xNet debt against adjusted EBITDANet debt divided by adjusted EBITDA, my calculation, by year-end. It was 5.3 in 2016 and 4.8 in 2018, fell to 3.5 in 2022, and was 3.8 at the end of 2025 and 3.9 at 30 September 2026. The company’s own ratio for September is 3.80.3x4x5x6x’16’17’18’19’20’21’22’23’24’25Sep ’26Net debt / adjusted EBITDA, 2016: 5.26xNet debt / adjusted EBITDA, 2017: 4.42xNet debt / adjusted EBITDA, 2018: 4.80xNet debt / adjusted EBITDA, 2019: 4.39xNet debt / adjusted EBITDA, 2020: 4.35xNet debt / adjusted EBITDA, 2021: 3.90xNet debt / adjusted EBITDA, 2022: 3.55xNet debt / adjusted EBITDA, 2023: 3.58xNet debt / adjusted EBITDA, 2024: 3.79xNet debt / adjusted EBITDA, 2025: 3.78xNet debt / adjusted EBITDA, Sep 2026: 3.90xNet debt against adjusted EBITDANet debt divided by adjusted EBITDA, my calculation, by year-end. It was 5.3 in 2016 and 4.8 in 2018, fell to 3.5 in 2022, and was 3.8 at the end of 2025 and 3.9 at 30 September 2026. The company’s own ratio for September is 3.80.3x4x5x6x’16’17’18’19’20’21’22’23’24’25Sep ’26Net debt / adjusted EBITDA, 2016: 5.26xNet debt / adjusted EBITDA, 2017: 4.42xNet debt / adjusted EBITDA, 2018: 4.80xNet debt / adjusted EBITDA, 2019: 4.39xNet debt / adjusted EBITDA, 2020: 4.35xNet debt / adjusted EBITDA, 2021: 3.90xNet debt / adjusted EBITDA, 2022: 3.55xNet debt / adjusted EBITDA, 2023: 3.58xNet debt / adjusted EBITDA, 2024: 3.79xNet debt / adjusted EBITDA, 2025: 3.78xNet debt / adjusted EBITDA, Sep 2026: 3.90x
Mine counts all debt and subtracts only cash. The company’s 3.80x also subtracts $857M of cash it spent on long-lead Power equipment that the customer has to reimburse if an order is cancelled. The Power investor’s $5.34B is not debt on the balance sheet, and I treat it as a claim of its own. Before August 2018 the debt includes Williams Partners. Source Annual results releases, 2016 to 2025, and XBRL company facts [9][10][11][12][13][4][6]; Q3 2026 10-Q [5]. Calculated from reported figures.
Show the numbers
Net debt against adjusted EBITDA
2016201720182019202020212022202320242025Sep 2026
Net debt / EBITDA (calculated)5.26x4.42x4.80x4.39x4.35x3.90x3.55x3.58x3.79x3.78x3.90x

Balance sheet

At 30 September 2026 Williams had $2.20B of debt due within a year and $31.73B of longer debt, $33.93B in all, against $1.76B of cash, so net debt was $32.18B (calculated). There was no commercial paper outstanding, and liquidity was $6.5B: the cash, a $3.75B credit facility to 2031 and a $1.0B 364-day facility.5 The covenant allows debt to EBITDA of 5.0 times, or 5.5 times after an acquisition, and the three ratings agencies rate it BBB+, Baa2 and BBB, two with positive outlooks.5 Noncontrolling interests were $5.76B at book, up from $2.19B in December, mostly the first $3.14B from the power investor.5 Interest expense was $1.13B in the nine months, and the 2026 guide is $1.54B.3 The September notes carry 5.0% to 6.4%, and the 2026 interest guide is about 4.9% on average net debt of roughly $31B by my estimate, so new debt pushes the average up, and my base case uses 5.5% from 2027 on, against about 4.9% implied by the 2026 guide.173

My 3.90 times is a snapshot taken a month after a $5.1B purchase: Momentum’s EBITDA was in the twelve months for 28 days only. If I also count the $3.74B the investor had paid in by then as debt, the ratio is 4.4. The company’s 3.5 to 4.0 target, my 3.9 held through the model, and that figure are three different things.143 One note in the 10-Q is worth the space: the company says certain assets bought in 2012 to 2014 may carry a value above fair value, though it judges them recoverable; an impairment would not change cash.5

Valuation

First, how this goes badly wrong

Before the numbers, I asked what would most likely hurt an owner here, and worked back. Three things stand out.

  • The growth costs more than it earns, and the balance sheet funds the difference. In the last twelve months the business spent $8.1B on capital against $6.5B of AFFO. If debt costs one point more on the whole stock and I require 10% instead of 9.0%, my base falls to $53; if growth capital costs 12 times the EBITDA it adds and not 8, it falls to $52 (estimate). Stock was sold in 2017, shares paid for the Williams Partners roll-up in 2018 and for Momentum in 2026, and the share count is 2.3% higher than in February.6115
  • The power projects disappoint. The company has put $5.34B of someone else’s money into five projects with 10 to 12.5 year contracts, and that investor takes 49% of the cash until it is paid back with a target return of 6.35%. If the five projects earn half what I assume, my base falls to $62; if they earned nothing and $1.5B of capital was lost, it falls to $55 (estimate). Neither is likely; the first costs about a tenth of the price and the second about a fifth.1422
  • The multiple goes back. The stock sells for 14.9 times trailing EBITDA, against 9.7 to 10.7 times at the year-ends of 2019 to 2023. At 11 times on today’s EBITDA the stock would be about $42, and at the 10.2 times of 2022 and 2023 about $37 (calculated). That is the way a good business becomes a poor purchase without a single bad quarter.61

None of these needs anything exotic. They set my bear. They also explain why I start from the cash that reaches an owner and not from AFFO, and why I test how much the answer depends on the growth budget and the cash tax date.

How I built it

I value the cash that could be paid to common holders after the company funds its own growth. I start from adjusted EBITDA for 2026 of $8.45B, in the upper half of the company’s $8.3B to $8.5B range, of which I put $0.17B in the power projects.3 After that, the core business’s EBITDA each year changes by an organic rate on existing assets, plus the prior two years of core growth capital divided by the capital it takes to earn a dollar of EBITDA, plus $0.35B in 2027 for the rest of a year of Momentum. I set that cost at 8 times in my base, which is 12.5 cents of EBITDA per dollar. The company does not publish a return on its backlog, so I tested it. From 2020 to 2025 Williams spent $21.0B on capital expenditures, acquisitions and equity investments, and adjusted EBITDA rose $2.73B from 2019 to 2025, which is 7.7 times on everything and 5.8 times if maintenance capital was near $0.85B a year (calculated).6114 I use 8, which is worse than both. Part of that growth came from rate increases and a low 2020 base, and the next expansions are in corridors that are harder to permit, as the New Jersey ruling shows. Each turn on this input moves my base by about $5 to $6.

The five power projects are separate. Their total growth capital is $9.0B, which is the $4.4B the investor funds at 49% divided by 0.49.14 I assume they earn 17 cents of EBITDA on each dollar, with 40% of the run rate in 2027, 78% in 2028 and all of it in 2029. The anchor is Socrates South: $205M a year of fixed lease payments on $1.0B of gross assets, 20 cents before operating costs I can’t see.5 The investor takes 49% of the cash from those projects, which I take as 49% of 97% of project EBITDA, until the money it put in, $5.34B, is repaid at 6.35%, and in the base case that ends around 2038, with $1.2B still owed at the end of 2036, which I deduct from the value (estimate).22 After the explicit years I keep 85% of the power EBITDA, since the contracts end between 2036 and 2041 and the customer holds the extension option.5

From EBITDA I take 96.0% in 2027 falling to 85.2% in 2036 for cash taxes, the cash I count from equity investments and other items, which is how the 2026 guide is built (AFFO $6.375B, EBITDA $8.4B at the midpoint) with tax drifting up as deferred tax comes due (estimate).37 Then I take off interest at 5.5% on net debt, preferred dividends, minority distributions of $0.33B growing 4% a year, stock pay of $0.10B and the investor’s share. That gives AFFO, which in my model is after stock pay and so a little below the company’s own measure. I then take off maintenance capital, $1.0B in 2027 and growing 3.5%, and growth capital, which starts at $4.6B for the core plus $3.3B for the power projects in 2027 and fades to $3.0B for the core, and add the new debt that holds net debt at 3.9 times EBITDA after the investor’s share. What remains is owner cash. I discount it at 9.0% with end-of-year timing, add the December 2026 dividend of $0.525, and divide by 1,255M shares. Net debt at the end of 2026 is $32.8B (estimate): the $32.2B at 30 September, plus about $0.6B of the fourth quarter’s dividend, growth and maintenance capital over AFFO and the investor’s October $1.0B.53

Two things in that setup matter. The value depends only a little on the size of the growth budget: with $2.0B of core growth capital every year my base is $64, and with $6.0B every year $72 (calculated). And owner cash is about $2.11 a share in 2027 and $2.75 in 2028, level with the $2.10 dividend only because the last $0.6B arrives from the investor, and rises to $4.47 in 2029, when the power building ends. I don’t assume the company stops spending; I assume the spending earns a fair return, which comes to the same value (estimate).

Three cases

Years 2027 to 2036; owner cash is after tax, interest, preferred dividends, minority distributions, the power investor’s share, stock pay and all capital, with debt held at the stated ratio.

Bear, base and bull cases
BearBaseBull
Growth capital cost per dollar of new EBITDA (estimate)10.0 times8.0 times6.5 times
Core growth capital 2027 to 2036, $B (estimate)323744
Power projects: EBITDA per dollar of capital (estimate)15 cents17 cents20 cents
Power EBITDA kept after the contracts end (estimate)50%85%100%
Organic change in existing EBITDA, a year (estimate)-0.3%+1.0%+1.8%
Cash left from EBITDA before interest, 2027 and 2036 (estimate)95.5% and 83.5%96.0% and 85.2%96.5% and 88.4%
Interest rate on net debt (estimate)5.9%5.5%5.1%
Net debt over EBITDA, 2030 on (estimate)3.8x3.9x4.0x
Growth after 2036 (estimate)1.5%2.5%3.0%
Adjusted EBITDA 2036, $B (calculated)13.016.019.7
EBITDA growth a year, 2025 to 2030 (calculated)8.3%10.4%12.8%
AFFO per share 2036 (calculated)$5.47$7.24$9.97
Owner cash per share 2036 (calculated)$3.09$5.36$10.02
Value per share (estimate)$34$68$110
Return a year at $67.86 (calculated)0.2%9.0%15.5%
Bear
New growth capital costs 10 times the EBITDA it adds, not 8, so overruns and permit delays eat the spread over interest. The power projects earn 15 cents of EBITDA on the dollar and only half of that Power EBITDA is renewed when the 10 to 12.5 year contracts end. Existing assets lose a third of a point of EBITDA a year. Debt costs 5.9% and cash tax arrives faster, so conversion falls to 83.5% by 2036. Growth after 2036 is 1.5%. Value $34.
Base
The company builds its plan at a cost I put at 8 times the EBITDA added, which is 12.5 cents on the dollar and a little worse than the 5.8 to 7.7 times of the last six years. The five power projects earn 17 cents of EBITDA on their cost and 85% of that is renewed. Adjusted EBITDA grows 10.4% a year to 2030, under the 11% or more the company says, and 6.6% a year from 2026 to 2036. Cash tax rises until conversion is 85.2% in 2036. Debt costs 5.5%. Net debt settles at 3.9 times. Value $68.
Bull
The company does what it says: 12.8% a year to 2030, with growth capital at 6.5 times the EBITDA it adds and power projects at 20 cents. Cash tax arrives slowly. Rates fall to 5.1%. The power contracts are fully extended. Value $110.

Source 2025 results, Q3 2026 release and 10-Q, July 2026 8-K [4][3][5][14]. Assumptions and values are my estimates.

Adjusted EBITDA in my three cases

US$ billions: bear to bull, with the base marked. Includes the five Power projects and a full year of Momentum from 2027

  • Bear to bull $13B to $20B in 2036
  • Base, 2036 $16.0B
Adjusted EBITDA in my three casesBase rises from $8.45B in 2026 to $16.0B in 2036. Bear reaches $13.0B and bull $19.7B.$8B$12B$16B$20B’26’28’30’32’34’36Base, 2026: $8.4BBase, 2027: $9.8BBase, 2028: $11.0BBase, 2029: $12.0BBase, 2030: $12.7BBase, 2031: $13.3BBase, 2032: $13.9BBase, 2033: $14.5BBase, 2034: $15.0BBase, 2035: $15.5BBase, 2036: $16.0BAdjusted EBITDA in my three casesBase rises from $8.45B in 2026 to $16.0B in 2036. Bear reaches $13.0B and bull $19.7B.$8B$12B$16B$20B’26’27’28’29’30’31’32’33’34’35’36Base, 2026: $8.4BBase, 2027: $9.8BBase, 2028: $11.0BBase, 2029: $12.0BBase, 2030: $12.7BBase, 2031: $13.3BBase, 2032: $13.9BBase, 2033: $14.5BBase, 2034: $15.0BBase, 2035: $15.5BBase, 2036: $16.0BAdjusted EBITDA in my three casesBase rises from $8.45B in 2026 to $16.0B in 2036. Bear reaches $13.0B and bull $19.7B.$8B$12B$16B$20B’26’27’28’29’30’31’32’33’34’35’36Base, 2026: $8.4BBase, 2027: $9.8BBase, 2028: $11.0BBase, 2029: $12.0BBase, 2030: $12.7BBase, 2031: $13.3BBase, 2032: $13.9BBase, 2033: $14.5BBase, 2034: $15.0BBase, 2035: $15.5BBase, 2036: $16.0B
The company guides $8.3B to $8.5B for 2026, in the upper half, and says it expects 11% or more a year of adjusted EBITDA growth through 2030. My base grows 10.4% a year from 2025 to 2030 (calculated) and 6.6% a year from 2026 to 2036 (calculated). Everything drawn here is my estimate. Source 2026 guidance and growth target, Q3 2026 release [3]. Assumptions are my estimates.
Show the numbers
Adjusted EBITDA in my three cases
20262027202820292030203120322033203420352036
Bear (estimate)$8.4B$9.5B$10.4B$11.1B$11.5B$11.9B$12.2B$12.4B$12.6B$12.8B$13.0B
Base (estimate)$8.4B$9.8B$11.0B$12.0B$12.7B$13.3B$13.9B$14.5B$15.0B$15.5B$16.0B
Bull (estimate)$8.4B$10.1B$11.7B$13.1B$14.2B$15.2B$16.2B$17.1B$18.0B$18.8B$19.7B

The base path, year by year

US$ billions unless marked; the company’s 2026 EBITDA guide is the start.

The base path
2027202820292030203120322033203420352036
Adjusted EBITDA, $B (estimate)9.811.012.012.713.313.914.515.015.516.0
of which the five power projects, $B (estimate)0.611.191.531.531.531.531.531.531.531.53
Net debt, $B (estimate)37414447495254565860
Interest, $B (estimate)1.92.12.32.52.62.82.93.03.13.2
Paid to the power investor, $B (estimate)0.290.570.730.730.730.730.730.730.730.73
AFFO, $B (estimate)6.77.37.78.08.38.58.78.89.09.1
Maintenance and growth capital, $B (estimate)8.97.55.55.14.74.44.24.34.34.4
Owner cash after capital, $B (estimate)2.63.55.65.66.06.46.66.66.66.7
AFFO per share (estimate)5.365.796.156.396.616.786.927.047.147.24
Owner cash per share (estimate)2.112.754.474.434.805.135.265.245.295.36
EBITDA in 2027 includes a full year of Momentum. Net debt is the end-of-year balance and excludes the investor’s claim. Owner cash is AFFO less maintenance and growth capital plus the change in net debt and, in 2027, the last $0.6B from the investor. Source Q3 2026 release and 10-Q; July 2026 8-K [3][5][14]. Judgements are my estimates.

What the price implies

At $67.86 Williams has a market value of $85B. With net debt, minority interests and preferred shares the enterprise value is about $123B, or 14.9 times trailing adjusted EBITDA, 14.6 times my 2026 figure and 12.9 times trailing AFFO per share (calculated).51 The multiple of EBITDA at each year-end since 2019 was between 9.7 and 10.7 through 2023, then 13.5 and 13.6; at the end of 2025 the share price was 12.6 times AFFO per share, against 6.7 to 8.7 in 2018 to 2023 (calculated). So the price is high against the company’s own history, and what the market is paying for is the next ten years: the power projects, LNG and the Southeast build-out. The right question is what must be true, so I ask it in reverse.

What the price needs, one input at a time

Hold all but one input at my base and solve for the one left.

What the price needs
If everything else is my base, the return I must accept is9.0%, against the 9.0% I ask (calculated)
Or growth capital must cost8.0 times the EBITDA it adds, against 8.0 in my base (calculated)
Or cash left from EBITDA before interest must differ by0.0 points in every year from my base (calculated)
Or growth after 2036 must be2.5% a year, against 2.5% (calculated)
The price and my base value are within a few cents of each other, so each line returns my own assumption. The next table is the useful one. Source NYSE close; my model [1]. Solved values are calculated from my model.

I did not set my assumptions to land here. I set the growth capital cost at 8 times after the record test above, the cash tax path from the tax note, and the power yield from Socrates South, and the base landed at $67.9. It is a coincidence that this is within a few cents of the price, and the right way to read it is as a range: the grid and the table below show that a single turn of growth-capital cost, or a point of required return, moves the value $5 to $14. The price sits inside the error of my own estimate.

How far each input moves the value

Everything else at my base. Values per share, my model.

How far each input moves the base value
InputLowerBaseHigher
Growth capital cost per dollar of EBITDA (estimate)10 times: $598 times: $686 times: $82
Required return (estimate)10.0%: $589.0%: $688.0%: $81
Cash conversion by 2036 (estimate)80%: $6385.2%: $6896% flat: $80
Power EBITDA per dollar of capital (estimate)14 cents: $6617 cents: $6820 cents: $70
Power EBITDA kept after contracts (estimate)none: $6285%: $68all: $69
Core growth capital every year (estimate)$2.0B: $64fades from $4.6B to $3.0B: $68$6.0B: $72
Cash conversion is the share of EBITDA left before interest, minority distributions and the investor’s share. The base path falls from 96.0% to 85.2%. Source My model. All values are my estimates.

What I can’t judge

Four inputs decide this page and I can’t know any of them. I don’t know what the next $4B to $5B a year of growth capital will earn, because the company does not say. I don’t know when cash tax arrives, because it depends on how long the company keeps building. I don’t know whether the power customers extend after 10 to 12.5 years, or whether the rest of the 6 gigawatts of backlog is signed on the same terms. And I don’t know what return owners need to ask for. So here is the grid. Read my $68 as one cell in it.

Value per share, by the two things I can’t know best

Down the side, what new growth capital costs per dollar of EBITDA. Across the top, the return I require. Everything else is my base.

Value per share by return on growth capital and required return
Growth capital per dollar of EBITDA8.0%9.0%10.0%11.0%
6 times, 16.7 cents (estimate)$99$82$70$61
7 times, 14.3 cents (estimate)$89$74$63$55
8 times, 12.5 cents (estimate)$81$68$58$50
10 times, 10.0 cents (estimate)$70$59$50$44
12 times, 8.3 cents (estimate)$62$52$44$39
The price is $67.86. It is reached in this grid at about 9.0% with 8 times, or at 8% with about 10 times. Source My model. All values are my estimates.

The discount rate

I use 9.0%. The US ten-year Treasury yielded 4.90% on 4 November and the thirty-year 5.28%.23 With Damodaran’s 4.41% implied equity risk premium on 1 November and a five-year beta of 0.63 for Williams against the S&P 500 on month-end closes, the capital asset pricing model gives 7.7% (calculated).24125 With a beta of one it gives 9.3%. I choose between them. A beta measured over five calm years doesn’t say what happens to a company with $33B of debt and a build programme when long rates move, and the thirty-year is above 5%. I could not find Transco’s allowed return in the documents I opened, so I can’t use it as a floor. The same 9.0% is on the Enbridge page, where the risk-free rate is 1.1 points lower, so my standard here is a little less demanding, and the table below shows other rates.

My value at other rates

Value per share in US$; the rate down the side, and either the three cases or growth after 2036 across the top.

Value by rate and case
BearBaseBull
8.0% (estimate)$40$81$134
9.0%, my rate (estimate)$34$68$110
10.0% (estimate)$30$58$93
11.0% (estimate)$26$50$80
Growth after 2036 for the three cases is 1.5%, 2.5% and 3.0%. The price is $67.86. The rate I use is 9.0%. Source Treasury yields; Damodaran; my model [23][24]. Judgements are my estimates.

Base value by rate and growth after 2036

US$ per share; terminal growth across the top, in nominal dollars.

Value by rate and growth after 2036
1.5%2.5%3.5%
8.0% (estimate)$77$81$89
9.0%, my rate (estimate)$65$68$72
10.0% (estimate)$56$58$60
The 2.5% case is my base. The price is $67.86. Source My model. Judgements are my estimates.

What it is worth, against the price

Value per share in US dollars, my estimates, against the NYSE close in Q4 2026

  • Bear to bull $34 to $110
  • Base $68
  • Price $67.86
  • Margin of safety below $45
What it is worth, against the priceValue per share in US dollars: bear $34, base $68, bull $110. Price in Q4 2026: $67.86, within 1% of the base value. Margin-of-safety price $45.BEAR$34BASE$68BULL$110Price $67.86What it is worth, against the priceValue per share in US dollars: bear $34, base $68, bull $110. Price in Q4 2026: $67.86, within 1% of the base value. Margin-of-safety price $45.BEAR$34BASE$68BULL$110Price $67.86What it is worth, against the priceValue per share in US dollars: bear $34, base $68, bull $110. Price in Q4 2026: $67.86, within 1% of the base value. Margin-of-safety price $45.Margin-of-safety zone: below $45$0$30$60$90$120Bear to bull: $34 to $110Bear case: $34 per shareBEAR$34Base case: $68 per shareBASE$68Bull case: $110 per shareBULL$110Price in Q4 2026: $67.86Price $67.86Close, Q4 2026
Bear, base and bull are my estimates of value per share. The price is the 4 November 2026 close. Source NYSE close; my model [1][2]. Values are my estimates.

A cross-check against Williams’s own history. Enterprise value over adjusted EBITDA was between 9.7 and 13.6 at the seven year-ends from 2019 to 2025 (calculated).61 At my base value the same measure on trailing EBITDA is 14.9, at my bear 9.8 and at my bull 21.3. So my base sits at the top of what the market paid before 2024 and above the 13.5 and 13.6 of the last two year-ends, on a business whose EBITDA is growing faster. My bear is below every year-end in the record and my bull is far above it. The multiple in my base at the end of 2036 is 11.4 times, so my base lets today’s premium fade.

Other uses of the same dollar

The ten-year US Treasury pays 4.90% with no risk to the money (reported).23 Williams’s dividend alone yields 3.1%, before tax. My base returns 9.0% a year at this price, my bull 15.5% and my bear 0.2%, so even my base, which assumes the growth works, returns a little less than the 4.90% plus the 4.41% premium I use for risk. The closest comparison on this site is Enbridge: a price 6% below its base, 9.9% a year on its base cash flows, 2.3% on its bear and a 5.6% dividend yield.18 On my numbers Enbridge’s price leaves more room than Williams’s, and it pays almost twice the yield; Williams has the stronger growth and Enbridge has more debt. What I can’t say is that the same dollar does better in one than the other, since the bears and bulls on both pages are my guesses about inputs I said I can’t judge.

The margin of safety

  • Price$67.86Close, Q4 2026 [1]
  • Base value$68My estimate (estimate)
  • Margin of safety below$45set from my bear case (calculated)

I set the margin of safety from the bear case, because with four inputs I can’t judge a discount to base is no protection. Below $45, 34% under my base value, my $34 bear value is at least three quarters of the price paid. The stock last closed below $45 on 26 September 2024 ($44.74).1 At $67.86 it is above that line, about 51% above, so there is no margin of safety by this rule.

Two different questions

How good is the business, and how good is the price? On the first, this is one of the best-placed gas infrastructure companies in the United States: regulated pipes into the East Coast, gathering in the fastest-growing shale area, a record of meeting guidance, an investment-grade balance sheet and a visible slate of projects. Its weaknesses are that it spends more than it earns after capital, that a dividend at 40% of AFFO is easy to pay only because growth is optional, and that per-share growth of 7% a year since 2018 was helped by cheap tax deferral. On the second, at $67.86 the price is at my base, my bear is 50% under it, and at 14.9 times EBITDA it is above anything in the record before 2024. That looks like a very good business at a fair price, not a price that protects against error, and for a company borrowing to build, the second matters more.

Where this could be in 5 and 10 years

These are my values in the page’s own model, in US dollars of the year named. Value at a date is the present value, at that date and at 9.0%, of the owner cash that comes after it, less what is still owed to the power investor, divided by today’s 1,255M shares. Owner cash paid per share is the December 2026 dividend plus all owner cash after capital from 2027 to 2036. The return is the yearly rate at which today’s price grows to the table’s cash plus the end-2036 value. I assume no new share issues.5

The base in five and ten years

Value per share in US$ at the end of the year named, and owner cash paid between now and the end of 2036.

The base in five and ten years
Value per share at end of 2031Value per share at end of 2036Owner cash paid per share, Dec 2026 to 2036Return a year, price to end of 2036
Bear (estimate)$39$41$280.2%
Base (estimate)$84$97$459.0%
Bull (estimate)$141$168$6715.5%
Included: owner cash after tax, interest, preferred dividends, minority distributions, the investor’s share, stock pay and all capital, with debt held at the case’s ratio. Excluded: the Q4 2026 dividend before December, any new shares, taxes on a holder. Values are present values at 9.0%. Source My model. All values are my estimates.

For the base to stand at five years, AFFO has to reach about $6.61 a share by 2031 from $5.25 now, 4.7% a year, and adjusted EBITDA $12.7B by 2030, 10.4% a year from 2025 against the company’s 11% or more. At ten years it needs EBITDA of $16B and net debt of $60B at about 3.9 times. The most likely way my base is wrong is the one the grid shows: growth capital at 10 times gives $59, and faster cash tax pulls it toward $63.

These are estimates of value, not forecasts of the share price, and the market price can sit above or below value for years.

The case for the price

What most people miss

Three things cut in Williams’s favour. The power investor’s target return is 6.35%, with a 10% promote to Williams and a right to buy it out between years 7 and 14, while Socrates South pays about a 20% revenue yield on cost.14225 Contracted revenue is $32.5B, $10.5B of it Transco’s after 2030.5 And cash tax was $162M in 2025 against an $857M provision, with $5.17B of deferred tax to come; that flatters today’s cash and not tomorrow’s, so I put it in my conversion path.7

The bull case

Gas demand is rising from power, LNG and industry, and Williams owns the pipes that connect supply to it, on contracts that pay whether or not gas flows. The company cites Wood Mackenzie for US gas demand growing nearly 35% over the next decade, and the EIA expects US LNG exports of 18.6 billion cubic feet a day in 2027, up from 17.6.816 The company says it has more than 6 gigawatts of power backlog and targets 11% or more a year of adjusted EBITDA growth to 2030; Chad Zamarin repeated that on 2 November.143 That is management, which is how I treat it. A named outside view: Blackstone’s Robert Horn and Rick Campbell said in July that they share deep conviction in this area and that Williams supplies hard assets for the AI buildout. Their fund is the investor in the five projects, so it is a buyer with money in.14 I found no analyst view from the past month that I could check against its source, so I name none.

Against reality

Today’s numbers support the first half. Adjusted EBITDA is up 9% for nine months, the first power plant is in service, and the 2026 EBITDA guide was raised in August, mainly for Momentum.326 They lag on the second: the last quarter grew 6%, the share count is 2.3% higher than in February, cash after all capital is −$2.3B, and a court vacated the New Jersey water certificate for the 400 million cubic feet a day Northeast Supply Enhancement.356 The 11% target is also a step up from the 6.4% a year of the last nine years (calculated).94 If the plan is built at about 8 times the EBITDA it adds, the power projects earn what Socrates South suggests, cash tax arrives over the decade and debt stays near 5.5%, then $67.86 is possible and my $68 follows. Today: demand yes, first plant yes, court ruling and cash after capital not yet, the rest unknown.

Multiply it out for the bull, which needs 11% or more a year to 2030, growth capital at 6.5 times, power at 20 cents with full extensions, slow cash tax and debt at 5.1%. My guesses are 35%, 30%, 40%, 40%, 35%, which multiply to 0.6%. They overlap, so perhaps 5%, and the 25% weight I give the bull in my $70 weighted value is generous.

What a 10x would take. Ten times $67.86 is $679, about $852B of market value. At today’s 12.9 times AFFO that needs AFFO per share of $52 against $5.25, about $66B in all, which is 26% a year for ten years. With AFFO at 78% of EBITDA and EBITDA at 66% of $12.5B of revenue, that is about $84B of EBITDA and $128B of revenue, ten times today’s. AFFO per share grew 7.1% a year from 2018 to 2025 (calculated) and my bull gives 90% in ten years. Doubling the multiple with no growth would still leave a fivefold gap. The best stretch on the price chart, from the $9.25 close on 18 March 2020 to $67.86, was 7.3 times in under seven years, from a pandemic low, with the multiple rising too. Tenfold moves at this size come from new markets, not pipeline tolls, and Williams pays out 40% of what it earns. Tenfold from here is close to impossible.

What they have to hit

Six numbers on a fixed schedule. Thresholds are what this price needs, and they agree with the signposts below.

What they have to hit
IndicatorTodayWhat the case needsWhere to track itNext check
Adjusted EBITDA$6.21B for nine months, up 9%; 2026 guide $8.3B to $8.5B, tracking the upper half3$8.45B for 2026, $9.8B for 2027 and $12.7B for 2030 at my base; the company’s 11% a year would give $13.1B for 2030 (estimate)Quarterly results release, summary table and 2026 financial guidance paragraphQ4 2026 results and 2027 guidance, expected February 2027 (expected)
Power projects in serviceSocrates South in service since late July; 2.59 GW across five projects; $35M of fixed lease income in Q35Socrates North by mid-November; Apollo and Aquila in the second half of 2027; about $0.61B of power EBITDA in 2027 and $1.53B by 2029 (estimate)10-Q, Expansion Project Updates (Power) and Note 7, lease income tableSocrates North in service, expected mid-November 20263
Leverage, the company’s measure3.80x at 30 September; 2026 guide about 3.75x3At or under 4.0x through 2027 with no equity beyond the Momentum shares (estimate)Results release, page 1 footnote 2 on debt to adjusted EBITDAQ4 2026 results, expected February 2027 (expected)
Cash after all capital−$2.3B over twelve months, against $2.55B of dividends (calculated)56At my base about −$2.2B in 2027 and −$0.3B in 2028, then +$2.3B in 2029 as the power building ends (estimate)Not published by the company; I compute it from the 10-Q or 10-K cash flow statement: operating cash flow less capital expenditures, equity-method investments and minority distributions2026 Form 10-K, expected February 2027 (expected)
Northeast Supply Enhancement and other Transco expansionsNew Jersey water certificate vacated 8 September 2026; Southeast Supply Enhancement due as early as Q3 20275Certificate reissued and in service by 2028; Southeast Supply Enhancement in service in 2027; losing the first costs about $3 a share (estimate)10-Q, Expansion Project Updates, Transmission, Power & GulfQ4 2026 results; New Jersey proceedings (no date announced that I could find)
AFFO per share, the company’s measure$5.25 over twelve months, up from $4.78 in 2025; 2026 guide midpoint $5.15 (calculated)36About $5.44 for 2027 and $6.47 for 2030 at my base, before my deduction for stock pay (estimate)Results release, guidance reconciliation table, AFFO per common share lineQ4 2026 results and 2027 guidance, expected February 2027 (expected)
Source Q3 2026 release and 10-Q; XBRL company facts [3][5][6]. Thresholds are my estimates.

Where I come down

What moved me was the investor’s 6.35% money, which cuts what Williams pays for the first $9B of power, and the $32.5B contracted base, which is why my bear is not lower. The 11% growth target did not move me, because the last quarter grew 6% and the record is 6.4% a year, and neither did the multiple, which is the debate. What would raise my values is evidence on the inputs I can’t see: each turn of growth-capital cost is worth about $5 a share, and each year of delay in cash tax is worth a few dollars. At $67.86 the price is at my base, within the error of my own estimate, and above my $45 margin-of-safety price.

Risks, and what would change my view

The three ways this goes badly wrong are at the start of Valuation. These are the rest.

  • Rates and refinancing. $2.2B of debt falls due within a year and $31.7B is longer.5 Every point on the average rate costs about $0.33B of AFFO, 5% of the total (calculated).
  • Equity. Stock was sold in 2017, paid out for the 2018 roll-up and for Momentum in 2026, and 26.9M Momentum shares were registered for resale on 2 November.615
  • Regulators and courts. The FERC sets the rate on the largest pieces, and a state or a court can stop a pipeline.5
  • Customers and producers. The top ten gathering customers are about 55% of fees and the top ten pipeline customers 44% of regulated revenue; the power customers are not named in the filings I read, and Eagle Ford minimum volumes step down in 2026.75
  • Commodity and derivatives. Marketing and upstream swing reported earnings; the nine-month swing from derivatives was $116M.37
  • Physical damage. Offshore assets in the Gulf of America are exposed to storms.5
  • Impairment. Some 2012 to 2014 acquired assets may carry values above fair value; a write-down would not change cash.5
  • Leadership. A chief executive of 16 months, with the previous one as executive chair and a board that has grown from ten seats to twelve.819

Policy and outside risk, and what it means for the value

Williams has no foreign operations.5 Its exposures are policy and prices abroad: LNG depends on export permits and global buyers; the power projects depend on turbines and equipment subject to tariffs and long lead times, with $857M of cash already spent on long-lead equipment that the customer reimburses if an order is cancelled; and the pipelines depend on state and federal permits, as the 8 September New Jersey ruling shows.5 I have not found Williams’s own estimate of its tariff exposure, so the effects below are mine.

Five scenarios, and the base value under each

My odds are judgements over the next three years, not forecasts. Each value reruns my base with the change shown.

Policy scenarios
ScenarioWho decidesMy odds, and whyBase value
The Northeast Supply Enhancement is never built: $0.25B a year of EBITDA lost from 2028New Jersey environmental regulators on remand; the FERC; the courtsAbout 1 in 3. The court vacated the certificate and the project needs state approvals again5$65, from $68
LNG export growth stalls after 2028: $0.3B a year of EBITDA lost from 2029 and 10% less growth capitalThe US administration on permits; global buyers and pricesAbout 1 in 5. The EIA expects exports to grow from 17.6 to 18.6 billion cubic feet a day in 2027, but Line 200 and Louisiana LNG are not due until 2028 and 2029165$65, from $68
The FERC sets Transco’s allowed return lower in the next rate case: $0.35B a year of EBITDA lost from 2028The FERC, after a Transco filingAbout 1 in 4. The last case was settled with customers and took effect in March 2026, and I could not find the allowed return5$65, from $68
Tariffs and cost inflation on steel and turbines: 15% higher cost of growth, $0.3B a year of EBITDA lost from 2027 and 15% less growth capitalThe US administration; equipment suppliersAbout 1 in 5. The company does not size the exposure, and the 10-Q lists inflation and supply chain delays as risks5$58, from $68
The power projects earn half what I assumeCustomers and construction costsAbout 1 in 6. Socrates South is in service at about 20 cents of lease revenue per dollar of cost, but four projects are not built5$62, from $68
The Northeast Supply Enhancement figure is my estimate: the company does not give the project’s EBITDA. The base is $68. Source Q3 2026 10-Q; October 2026 EIA outlook [5][16]. Odds and effects are my estimates.

Some of this may be in the price: the stock fell 15% from May’s high close, and I can’t say how much of that was these.1 Any single scenario costs $3 to $6 a share; several together with a higher rate are what hurt. Hurricanes and cyber attacks are also in the filings’ risk lists, and I cannot size them.5

What would change my view

Signals that move my values, in either direction.

Signposts
SignalTodayRaises my valueLowers my value
Adjusted EBITDA$6.21B for nine months, guide $8.3B to $8.5B32027 above $9.8B, and 2030 on track for $13B2027 below $9.3B, or 2026 below its guide
Power projectsSocrates South in service; 2.59 GW signed5Socrates North on time; Apollo and Aquila in the second half of 2027; new signed projectsA delay; a customer not extending; no new contracts through 2027
Leverage, company measure3.80x3At or under 3.75x with no new sharesAbove 4.0x, or another share issue
Cash after all capital−$2.3B over twelve months56Positive in 2029 as the power building endsStill negative in 2029
Northeast Supply EnhancementCertificate vacated 8 September 20265Reissued; in service by 2028Cancelled
US ten-year yield4.90%23Under 4.2% for a yearOver 5.5%
Cash income tax$162M in 2025 against an $857M provision7Deferral continuing into 2028 with growth capital above depreciationCash tax above 10% of EBITDA before 2030
Share count1,250.2M at 29 October5Flat through 2027Above 1,270M
Source Q3 2026 release and 10-Q; 2025 10-K; Treasury [3][5][7][23][6]. Thresholds are my judgement.

Sources

  1. 1WMB daily closes, New York Stock Exchange, ten years to 4 November 2026 (opens in a new tab)PriceYahoo Finance chart feed · 4 Nov 2026 · Close $67.86 on 4 November 2026 (regular session ended 16:00 ET); high close $79.40 on 19 May 2026; 52-week intraday range $56.26 to $80.08 · Accessed 4 Nov 2026↩︎
  2. 2The Williams Companies (WMB) price history (opens in a new tab)Pricestockanalysis.com · 4 Nov 2026 · Second source: same $67.86 close and 20.55M volume on 4 November; Nasdaq.com historical quotes (api.nasdaq.com) showed the same closes through 3 November ($72.47) and had not yet posted 4 November · Accessed 4 Nov 2026↩︎
  3. 3Williams third-quarter 2026 results news release (Ex. 99.1 to 8-K) (opens in a new tab)FilingSEC EDGAR · 2 Nov 2026 · Adjusted EBITDA $2.039B, AFFO $1.589B, leverage 3.80x, 2026 guidance, segment tables, AFFO reconciliation, 2026 guidance reconciliation · Accessed 4 Nov 2026↩︎
  4. 4Williams fourth-quarter and 2025 results news release (Ex. 99.1 to 8-K) (opens in a new tab)FilingSEC EDGAR · 10 Feb 2026 · 2025 Adjusted EBITDA $7.75B, AFFO $5.858B, segment results, 2026 initial guidance, dividend $2.10 · Accessed 4 Nov 2026↩︎
  5. 5The Williams Companies, Inc. Form 10-Q for the quarter ended 30 September 2026 (opens in a new tab)FilingSEC EDGAR · 2 Nov 2026 · Balance sheet, cash flow, Notes 1 to 7, expansion projects, remaining performance obligations, liquidity, credit ratings, share count at 29 October · Accessed 4 Nov 2026↩︎
  6. 6The Williams Companies, Inc. XBRL company facts (income statement, cash flow and balance sheet tags, 2015 to 2026) (opens in a new tab)DataSEC EDGAR · 4 Nov 2026 · Revenue, net income, operating cash flow, capital expenditures, dividends, debt, cash, shares, stock pay, current and deferred tax by year as filed in each 10-K · Accessed 4 Nov 2026↩︎
  7. 7The Williams Companies, Inc. Form 10-K for 2025 (opens in a new tab)FilingSEC EDGAR · 24 Feb 2026 · Business, contracts, Transco and NWP, G&P, executive officers, tax note, cash taxes paid, employees · Accessed 4 Nov 2026↩︎
  8. 8Williams 2026 proxy statement (DEF 14A) (opens in a new tab)FilingSEC EDGAR · 18 Mar 2026 · Executive pay, incentive metrics, ownership guidelines, share ownership table at 24 February 2026, Wood Mackenzie demand estimate · Accessed 4 Nov 2026↩︎
  9. 9Williams fourth-quarter and 2016 results news release (Ex. 99.1 to 8-K) (opens in a new tab)FilingSEC EDGAR · 15 Feb 2017 · Adjusted EBITDA $4.436B for 2016 · Accessed 4 Nov 2026↩︎
  10. 10Williams fourth-quarter and 2017 results news release (Ex. 99.1 to 8-K) (opens in a new tab)FilingSEC EDGAR · 14 Feb 2018 · Adjusted EBITDA $4.531B for 2017; 2016 dividend cut from $0.64 to $0.20 a quarter and increase to $0.30 in 2017 · Accessed 4 Nov 2026↩︎
  11. 11Williams fourth-quarter and 2019 results news release (Ex. 99.1 to 8-K) (opens in a new tab)FilingSEC EDGAR · 19 Feb 2020 · Figures for 2019 and 2018; Adjusted EBITDA $5.015B and DCF $3.297B for 2019; WPZ merger in 2018 · Accessed 4 Nov 2026↩︎
  12. 12Williams fourth-quarter and 2021 results news release (Ex. 99.1 to 8-K) (opens in a new tab)FilingSEC EDGAR · 22 Feb 2022 · Figures for 2021 and 2020; AFFO and Adjusted EBITDA · Accessed 4 Nov 2026↩︎
  13. 13Williams fourth-quarter and 2023 results news release (Ex. 99.1 to 8-K) (opens in a new tab)FilingSEC EDGAR · 14 Feb 2024 · Figures for 2023 and 2022; MountainWest purchase · Accessed 4 Nov 2026↩︎
  14. 14Williams announces $5.34 billion investment in Power Innovation joint venture from Blackstone (Ex. 99.1 to 8-K) (opens in a new tab)FilingSEC EDGAR · 13 Jul 2026 · 49% noncontrolling interest in five Power projects; $4.4B plus about $0.9B; buyout right years 7 to 14; 6+ GW backlog; 2026 leverage about 3.6x · Accessed 4 Nov 2026↩︎
  15. 15Williams prospectus supplement for resale of up to 26,874,496 shares (424B2) (opens in a new tab)FilingSEC EDGAR · 2 Nov 2026 · Momentum holders may sell up to 537,496 shares a day until 3 March 2027; Williams receives no proceeds · Accessed 4 Nov 2026↩︎
  16. 16EIA Short-Term Energy Outlook, October 2026 (opens in a new tab)DataU.S. Energy Information Administration · 6 Oct 2026 · US LNG exports 17.6 Bcf/d in 2026 and 18.6 Bcf/d in 2027; Henry Hub $3.16 in 2027; natural gas share of generation 40% in 2025 and 2026, 39% in 2027 · Accessed 4 Nov 2026↩︎
  17. 17Williams $2.75 billion senior notes offering, September 2026 (8-K Item 8.01) (opens in a new tab)FilingSEC EDGAR · 10 Sep 2026 · Notes at 5.000% due 2029, 5.600% due 2033, 5.800% due 2036 and 6.400% due 2056 · Accessed 4 Nov 2026↩︎
  18. 18Enbridge (ENB): the business, the moat and the price (opens in a new tab)PagePedrum Shokouhi · Q4 2026 · Base value C$74, price C$69.11, 9.9% a year on the base cash flows and 2.3% on the bear · Accessed 4 Nov 2026↩︎
  19. 19Williams announces two new directors (8-K Items 5.02 and 7.01) (opens in a new tab)FilingSEC EDGAR · 1 Jul 2026 · Robb Turner and Billy Helms join the board; the board goes from ten to twelve seats · Accessed 4 Nov 2026↩︎
  20. 20Williams director Michael Creel will not stand for reelection in 2027 (8-K Item 5.02) (opens in a new tab)FilingSEC EDGAR · 21 Aug 2026 · Notice given 17 August 2026 · Accessed 4 Nov 2026↩︎
  21. 21Form 144 notice of proposed sale, Williams general counsel (opens in a new tab)FilingSEC EDGAR · 2 Nov 2026 · Filed by an officer of Williams on 2 November 2026; Form 4 for a transaction dated 2 November filed on 3 November · Accessed 4 Nov 2026↩︎
  22. 22Williams Power Innovation joint venture financing presentation (Ex. 99.2 to 8-K) (opens in a new tab)FilingSEC EDGAR · 13 Jul 2026 · Partner target return 6.35%, 10% promote, buyout multiples; Blackstone provides 59% of expected project capital · Accessed 4 Nov 2026↩︎
  23. 23US Treasury daily par yield curve rates, 2026 (opens in a new tab)DataU.S. Department of the Treasury · 4 Nov 2026 · 10-year 4.90% and 30-year 5.28% on 11/04/2026 · Accessed 4 Nov 2026↩︎
  24. 24Damodaran implied equity risk premium, 1 November 2026 (opens in a new tab)ResearchAswath Damodaran, NYU Stern · 1 Nov 2026 · Implied ERP 4.41% (trailing 12-month, adjusted payout) · Accessed 4 Nov 2026↩︎
  25. 25SPY chart feed, five years of month-end closes (opens in a new tab)DataYahoo Finance chart feed · 4 Nov 2026 · Beta of WMB month-end closes against SPY, 60 months to October 2026: 0.63 · Accessed 4 Nov 2026↩︎
  26. 26Williams second-quarter 2026 results news release (Ex. 99.1 to 8-K) (opens in a new tab)FilingSEC EDGAR · 3 Aug 2026 · Guidance raised to $8.3B to $8.5B for Momentum; growth capex $7.3B to $7.9B · Accessed 4 Nov 2026↩︎

How the figures are labelled

(reported)Reported: taken from a filing or a price feed, as printed.

(calculated)Calculated: arithmetic on reported figures, such as a margin or a growth rate.

(estimate)Estimate: my judgement, such as a case value or a growth assumption.

The price

Close in Q4 2026: $67.86, New York Stock Exchange, 4 November 2026, from a chart feed [1]. A second source, stockanalysis.com, shows the same close and volume [2]. Nasdaq.com’s historical quote feed matched the closes through 3 November and had not yet posted 4 November when I looked. The company reports in US dollars under US accounting. Shares are the 1,250.2M outstanding at 29 October 2026 plus 5M for unvested awards, which is 1,255M [5]. Fiscal years are calendar years. No split falls in the period.

The valuation

Owner cash to common holders, discounted at 9.0% with cash at the end of each year from 2027. Each case builds adjusted EBITDA from $8.45B for 2026, of which $0.17B is the five power projects, with an organic rate on the core, plus the last two years of core growth capital divided by a number of times of EBITDA, plus $0.35B in 2027 for the rest of a year of Momentum, plus power EBITDA at a yield on $9.0B of capital that is 40% in service in 2027, 78% in 2028 and all in 2029. AFFO is EBITDA times a conversion share that drifts from 96.0% to 85.2% in the base, less interest on net debt, preferred dividends, minority distributions, stock pay of $0.10B and the investor’s share of the power cash, which is 49% of 97% of power EBITDA until its $5.34B plus 6.35% a year is repaid. Owner cash is AFFO less maintenance capital (about $1.0B in 2027) less growth capital plus the change in net debt, held at a ratio to EBITDA after the investor’s share, plus the last $0.6B of investor money in 2027. After 2036 growth is 2.5% in the base, power EBITDA is 85% of its 2036 level, and the investor’s remaining balance is subtracted. Net debt starts at $32.8B at the end of 2026 and the 30 September balance is $32.2B. The December 2026 dividend of $0.525 is added. I count no new shares in any case. The yearly returns are the rate that equates the price with the cash to 2036 and the end-2036 value at 9.0%. The odds in Section VII are my guesses; the weighted value of $70 uses 25%, 50% and 25%.

The margin-of-safety price is $45, set from my bear case. No rating: the page states a range and the price, and leaves the decision to the reader.

Research, not investment advice. Figures as of .

Legal information and disclosures

These are my own views as of the update shown on this page. They can change without notice, and I have no duty to update them. Past performance does not indicate future results, and any investment can lose money.

This is for education only. It is not investment, legal, tax or accounting advice, and it is not an offer to sell or a solicitation to buy any security in any jurisdiction. It does not consider your goals or circumstances.

Figures from company filings and other third parties are believed to be reliable, but I have not independently verified them and cannot guarantee them. Bear, base and bull values, and anything marked as an estimate, are my own and rest on assumptions that may prove wrong.

Please do not copy or republish this material without my written consent.